TRANSMITAL FORM
Client Name: Ref No. TEI - ED - TF - 00013
Unit No. C215-CW Date: 05-Nov-19
Time: 9:10 AM
No. of Set : 1
Description : Detailed Floor Plan
Letter
Transmitted To:
Housekeeping/Date
Transmitted To:
IT/Date
Note: Please clear all your query before the project start to avoid poor workmanship.
Remarks:
C313-CW
DESCRIPTION
FIT-OUT
1. TYPE OF WALLS
A. Drywall
B. Glass Wall
2. PAINTING
WALL
3. CEILING
ELECTRICAL
1. LIGHTING
TEA ROOM
OFFICE 1
OFFICE 2
ELECTRICAL
Lot 32 & 33 Waterfront Road, Central Business District Area,
Subic Bay Freeport Zone
Tel. No.# (047) 2513362
C313-CW
TEA ROOM
1. Glass Door not yet installed c/o Maintenance
2. Need housekeeping c/o HK
3. incomplete Frosted c/o Maintenance
Office
1. Chair
Lot 32 & 33 Waterfront Road, Central Business District Area,
Subic Bay Freeport Zone
Tel. No.# (047) 2513362
C216A (MR.
1 9/26/2019 9/26/2019 10/11/2019 DONE
CHEN)
C104,105,116,1
2 9/14/2019 9/14/2019
17
10 C118-C119 10/26/2019
11 C210 (C) 10/28/2019
DAYS DESCRIPTION
1
2
3
4
5
6
7
Lot 32 & 33 Waterfront Road, Central Business District Area,
Subic Bay Freeport Zone
Tel. No.# (047) 2513362
DATE: FEB. 09, 2029
BPO OFFICES
ACCOMMODATION
UNIT BLDG NO./ BUILDING NAME TOTAL NO. OF OCCUPANT NO. OF LOCATION TOTAL NO. OF ROOMS TOTAL AREA FOR OFFICE & ACCOMMODATION NET REMARKS
FLOOR AREA
1 3014 ( DORMITORY 1) 170 2 ALL 27 986.00 Done
2 3015 ( DORMITORY 2) 1 ALL 751.00 No bed layout & verify no. of rooms
3 3012 ( MONKEY HOUSE 2) 84 2 ALL 18 466.00 Done
4 3013 (MONKEY HOUSE 3) 84 2 ALL 18 466.00 Done
5 3007 (PINK HOUSE 1) 2 ALL 466.00 Bed layout c/o angel
6 3008 (PINK HOUSE 2) 2 ALL 466.00 Bed layout c/o angel
7
8
9
10 338 63 3,601.00
- Partial
Lot 32 & 33 Waterfront Road, Central Business District Area,
PROGRESS
ITEM DESCRIPTIONS PROGRESS STATUS IN-CHARGE % REMARKS
NURSING BUILDING
1 TABLES & CHAIRS SETUP , OFFICE
COMPLETED CKC CONTRACTUAL/ 100%
5,6,7,8, & 9 CKC MAINTENANCE
ELECTRICAL WORKS(T&C OUTLET)OFFICE
2 5,6,7,8, & 9 ON-GOING CKC MAINTENANCE 95%
ELECTRONICS WORKS(T&C LAN
3 CABLING)OFFICE 5,6,7,8, & 9 COMPLETED CKC CONTRACTUAL 100%
SECOND FLOOR, ADDITIONAL CUBICLE IN
4 COMMON TOILET COMPLETED CKC MAINTENANCE 100%
5 SECOND FLOOR, OFFICE TOILET STOP CHS CONSTRUCTION 30%
DORMITORY 1 BUILDING
REPAIR OF ELECTRICAL MAINLINE PANEL CKC MAINTENANCE/
1 WITH LOADBANK COMPLETED LOADBANK 100%
REPAIR OF ELECTRICAL PANEL IN DORM
2 EXTENSION COMPLETED CKC MAINTENANCE 100%
INSTALLATION OF ADDITIONAL OUTDOOR
3 LIGHTS COMPLETED CKC MAINTENANCE 100% REQUESTED BY CLIENT
INSTALLATION OF ACU POWER OUTLET
4 FOR 2 ROOMS COMPLETED CKC MAINTENANCE 100%
5 REWIRING OF OLD ELECTRICAL SYSTEM _ _ _ WAITING FOR APPROVAL
LIBRARY BUILDING
1 TABLES & CHAIRS SETUP COMPLETED CKC CONTRACTUAL/ 100%
CKC MAINTENANCE
2 PAINTING WORKS COMPLETED CKC CONTRACTUAL 100%
3 ROOFING WORKS _ _ _ NO MATERIALS
4 ELECTRICAL WORKS(LIGHTING) COMPLETED CKC MAINTENANCE 100%
5 ELECTRICAL WORKS(ACU OUTLET) COMPLETED CKC MAINTENANCE 100%
6 ELECTRICAL WORKS(T&C OUTLET) STOP CKC MAINTENANCE 80% NO MATERIALS
7 ELECTRONICS WORKS(T&C LAN CABLING) _ _ _ NO MATERIALS
ELECTRONICS WORKS (MAIN
8 CABLING & CABLE TRAY) _ _ _ NO MATERIALS
9 CEILING WORKS COMPLETED CKC CONTRACTUAL 100%
10 DEMOLITION OF WALL PATITION COMPLETED CKC CONTRACTUAL 100%
11 INSTALLATION OF MAIN WOOD DOOR COMPLETED CKC CONTRACTUAL 100%
12 COMMON TOILET STOP CKC CONTRACTUAL 40% NO MATERIALS
ADMIN BUILDING
1 PAINTING WORKS COMPLETED CKC CONTRACTUAL 100%
2 ROOFING WORKS COMPLETED CKC CONTRACTUAL 100%
3 ELECTRICAL WORKS(LIGHTING) COMPLETED CKC MAINTENANCE 100%
4 ELECTRICAL WORKS(OUTLET) COMPLETED CKC MAINTENANCE 100% OPERATIONAL
5 CCTV ROOM & SECURITY OFFICE COMPLETED CKC CONTRACTUAL 100%
6 KITCHEN COMPLETED CKC CONTRACTUAL 100%
7 COMMON TOILET COMPLETED CKC CONTRACTUAL 100%
8 TABLES & CHAIRS SETUP COMPLETED CKC CONTRACTUAL 100%
SMALL KITCHEN OF CLIENT
1 RENOVATION COMPLETED CHS CONSTRUCTION 100% OPERATIONAL
ADDITIONAL ELECTRICAL OUTLET FOR
2 INDUSTRIAL REFRIGIRATOR COMPLETED CKC MAINTENANCE 100% REQUESTED BY CLIENT
INSTALLATION OF ELECTRICAL SUB-
3 METER COMPLETED CKC MAINTENANCE 100%
CKC COMPOUND
CKC CONTRACTUAL/
1 INSTALLATION OF SOLAR LAMP POST STOP CKC MAINTENANCE _ 70 PCS INSTALLLED
PROGRESS ACC
ITEM DESCRIPTIONS UNIT QTY UNIT COST TOTAL COST QUANTITY
PREVIOUS
WING A
1 Demolition of wall & ceiling sq. m. 487 70 34,090.0 330
WING B
2 Demolition of wall & ceiling sq. m. 777 70 54,390.0 58.8
WING C
3 Demolition of wall & ceiling sq. m. 515 70 36,050.0
WING D
4 Demolition of wall & ceiling sq. m. 961 70 67,270.0
WING E
5 Demolition of wall & ceiling sq. m. 490 70 34,300.0
Prepared By:
Joseph john Durolfo
Engineering Supervisor
CCOMPLISHMENT REPORT
DATE/TIME 10/03/2020
REF NO. TEI - ED - WAR- 0001
DATE COVERED: Mar 10- Mar 16, 2020
PROGRESS ACCOMPLISHMENT
PROGRESS
QUANTITY AMOUNT REMARKS
%
THIS PERIOD TO DATE PREVIOUS THIS PERIOD TO DATE
0 0 0 0 0.00
0 0 0 0 0.00
0 0 0 0 0.00