CARBON PORTFOLIO - PERU 2010

Energy, Industry and Others

SHIMA Hydroelectric Power Plant H63


Description: The project is a new hydroelectric power plant located in the province of Tocache, department of San Martin. The Project’s purpose is
renewable electricity generation to be supplied to the electric grid. The installed capacity will be 6.4 MW and the estimated yearly average genera-
tion will be 32.922 gigawatts hour (GWh).
Current Status: Projects Benefits:
Earliest project start date: 2010. Sustainable development contribution:
Operation start date: September 2012. It reduces GHG emissions and other pollutants resulting from the cu-
Project lifetime: 40 years. rrent power generation.
Current Status: Pre-Feasibility study completed. Concession granted by It introduces new clean technology and local capacity building in
Ministry of Energy and Mines. hydroelectric electricity generation.

Estimated Annual Emission Reductions (tCO2/year):


An average of 20,128.5 tCO2-equivalent. per year.

Project Participant and Financing CER´s negotiation:


Total project cost: US$ 9,600,000 Open.
Contact Information:
Sources of finance to be sought or already identified: Name: Oscar Revilla
Equity: NA. Company: Energoret Ingenieros E.I.R.L.
Title: General Manager
Debt: NA. Phone Number: (511) 624-4523 / 98030-6923
E-mail: energoret@speedy.com.pe
Name: Ugo Rafael Mendoza Ingunza
Company: Manufacturas Industriales Mendoza S.A.
Title: General Manager
Phone Number: (511) 464-8622 / 498-8820 / 561-2998
E-mail: ascheggia@metalindustrias.com.pe

BAÑOS V Hydroelectric Plant H64


Description: The project is run-of-river hydropower plant located in the province of Huaral, department of Lima. The Project’s purpose is renewable
electricity generation to be supplied to Animón’s mining unit. The capacity installed will be 9.3 MW and the estimated yearly average generation
will be 58.96 gigawatts hour (GWh).
Current Status: Projects Benefits:
Earliest project start date: April 2010 The project will create a source of renewable energy in a sustainable
Operation start date: March 2012 way. Employing local workforce in construction and plant manage-
Project lifetime: 40 years ment (800 direct jobs). Helping the country develop the hydrocarbon
Current Status: Feasibility study is completed. PIN is already develo- trade balance through the reduction of oil imports to be used for elec-
ping. PDD is under development. The construction of the project it is tricity generation. Enabling SEIN to reserve thermal power plants only
planned to begin on 2010. for stand-by power generation, thus displacing expensive generation
fuelled by heavy fuel oil, diesel, coal and natural gas, while reducing
Estimated Annual Emission Reductions (tCO2/year): GHG emissions.
An average of 31,969 tCO2-equivalent per year. CER´s negotiation:
Open.
Project Participant and Financing The project developer has a contract with ÉcoRessources Consultans
for the marketing of the CER’s.
Total project cost: US$ 18,000,000
Contact Information:
Name: José Estela
Sources of finance to be sought or already identified: Company: Administradora Chungar S.A.
Equity: 100 % Title: Energy Manager
Phone Number: (511) 219- 4000
Debt: 0 % E-mail: Jestela@volcan.com.pe
Name: Luis Salgado
Company: ÉcoRessources
Title: Climate Change Project Manager
Phone Number: (51 4) 787-1724 ext.229
E-mail: Luis.Salgado@ecoressources.com

www.fonamperu.org

National Environmental Fund - Peru