RAYALASEEMA THERMAL
GENERATION
POWER PROJECT, STAGE – IV,
CORPORATION LIMITED,
HYDERABAD. UNIT #6 (1x600 MW)
OWNER’S
DESEIN PRIVATE LIMITED
CONSULTANT
NAME DATE
PREPARED BY KRISHNA 15/6/2016
REV.NO. Particulars Date Checked By Approved By
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX
1
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP) PACKAGE
2
project RAYALASEEMA THERMAL POWER PROJECT(1X600MW) (COAL HANDLING PACKAGE)
The higher moment of MX and My at bottom and top considered for designed
ON E/F Near CF location +ve M*x ABS( 181)+ABS( 28) 209 139.333333 Mx on eartj face CF location
ON E/F other than CF +ve M*y 127+ABS( 7) 134 89.33 Mx on earth face other than CF location
Away from E/F - ve M*y ABS( 127+ABS( 5)) 132 88 My ( away from e/f)
Away from E/F -ve M*x ABS( 123+ABS( 0)) 123 82 Mx (away from e/f)
The higher moment of MX and My at bottom and top considered for designed
3
DESIGN OF RAFT RL 157.67
Conc 30 Design based on limiting crack width (as per cl:35.3.2 of IS:456-2000)
fy 500 limiting crack width for the surfaces in contact with water/soil) 0.1 mm
limiting crack width (other than mentioned above) 0.2 mm min.
reinf.
Design Provided modular crack (0.12
Details BM ™ M/bd2 pt Ast Ast D d As /bd ratio (m) x z fs 0.8fy a1 e1 em acr cmin width (mm) ) Provided reinforcement
on earth face at CF 92.7 0.694 0.164 2323 8205.87 1500 1415 0.006 16.0 492.24 1250.9 90.276 400 1500 0.000 0.000 60.177 50 0.028 1800 Y 28 @ 75
However provide extra bars of 20-Y28 at CF location (extent of CF width) provide ( as per contour stress diagram)
Mx at bottom other
than CFlocation 89.3 0.669 0.158 2237 4102.93 1500 1415 0.003 16.0 370.35 1291.6 168.58 400 1500 0.001 0.000 84.595 50 0.040 1800 Y 28 @ 150
on earth face otherthan CF88.0 0.637 0.150 2162 4102.93 1500 1440 0.003 16.0 374.09 1315.3 163.07 400 1500 0.001 0.000 84.595 50 0.033 1800 Y 28 @ 150
away from e/ f 82.0 0.593 0.140 2011 4102.93 1500 1440 0.003 16.0 374.09 1315.3 151.95 400 1500 0.001 0.00 84.595 50 0.019 1800 Y 28 @ 150
4
Design of raft at RL 166.670
ON E/F +ve M*x 301 200.67 other than zone x (for max mx)
ON E/F +ve M*y 124 124.00 other than zone x (for max my)
5
DESIGN OF RAFT 166.7
Conc 30 Design based on limiting crack width (as per cl:35.3.2 of IS:456-2000)
fy 500 limiting crack width for the surfaces in contact with water/soil) 0.1 mm
limiting crack width (other than mentioned above) 0.2 mm
min.
Design Provided modular crack reinf.
Details BM ™ M/bd2 pt Ast Ast D d As /bd ratio (m) x z fs 0.8fy a1 e1 em acr cmin width (mm) (0.12 Provided reinforcement
Design of Raft along x
on earth face at CF 200.7 1.503 0.368 5213 10717.9 1500 1415 0.008 16.0 545.95 1233 151.84 400 1500 0.001 0.001 59.909 50 0.104 1800 Y 32 @ 75
6
RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP)
Project
PACKAGE
Doc Title ANALYSIS AND DESIGN OF WAGON TIPPLER
Load calculation :
Moments as per staad results( at face of beams) ( Factored Moments) Shear ( at deff from face of beam/wall)
Ele L/c Mx My Mxy Ele L/c Sqx Sqy
16472 100 10.2 4.6 -0.9 11.1 17862 107 -30.8 -15
17178 109 -1.8 1.1 3.3 16584 103 -15.3 38.5
17037 103 12.2 8.4 1.1 13.3
16468 106 4.6 0 -1.1 Tv 0.385 n/sq.mm Tc = 0.44 n/sq.mm for provided pt 0.37%
From above the design moments are more than that off staad results Hence Ok
8
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
with revised moments from staad , Provided reinforcement is oK (as the slab face is not contacted with soil , hence crack width check is not required)
9
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX
10
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Case-1 The hopper is full upto its full capacity with top surface horizontal at
grating level
Design of Plate 1 (Designed per 1m width) (applicable for short and long plates)
1
1.63
2 p2
p1
1.413
p3
5
4
3.9
CF
p4
4.65 3
o
= 70
reaction A = 0.5*2.4x(1.63+1.42+4.65)x1.2 = 11t/m (which is axial tension)
for 3 joints 11/3 3.67 t per joint applied in staad
vertical pr , q= h
Hori pr , p1= ka h = 0.25*1.2*1.63 0.489 t/m2
2 2 o
p2 = h (cos + ka sin ) , = 70 < 73.13 deg in drg 1.222 radians (conservative )
(from Mark fintel) Conservative
11
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
Configuration and loading
The hopper is full upto its full capacity with top surface horizontal at
grating level
Case-1
Designed case
12
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
-2.95
1
1.63
2.95 2 p2
p1
1.413
p3
5
4
wall
3.9
p4
4.65 3
o
71
q =
p2 = h (cos2q+ ka sin2q) , q = 70
o
Analysis results
13
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
pt = 1.20 %
Total reinf.
= Steel 3479.13 sq.mm
BM = 11.00 tm 7.1+3.5
Mu = 11.00 tm
Mu/Bd^2 = 0.51 N/sq.mm
pt = 0.17 %
Ast = 364.59 sq.mm
Tension in Plate 11.00 t
Reinf. Due to Tension in plate 478.26 sq.mm
14
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
Provide Y16-100 c/c (Vertical in side portion and out side of Hopper)
Distibution steel Provide Y16-100c/c inside face Y16-150 c/c out side face
Horizontal)
out side
Y16-150 inside
300 Y16-100
450
Y16-100
Y16-150
3.45
4.8 x 2.95
333.05 0.40625
p2
q 2a 4
2 b 2.95
2 2 o
p = g h (cos q+ ka sin q) , 70
p1 = 2.2*1.2*((COS(1.222))^2+0.25*(SIN(1.222))^2) 0.89
p2 = 7.7*1.2*((COS(1.222))^2+0.25*(SIN(1.222))^2) 3.12
15
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
M/bd^2 Max -ve BMMy 0.78*1.5*10000000/1000/(250-20-10)^2 0.24
Max +ve BMMy 0.29*1.5*10000000/1000/(250-20-10)^2 0.09
Max -ve BMMx 1.03*1.5*10000000/1000/(250-20-10)^2 0.32
Max -ve BMMx 0.37*1.5*10000000/1000/(250-20-10)^2 0.11
Ast min reinf
pt Max -ve BM
My ((1-SQRT(1-4.6/30*0.24))*30/415)*50 0.07 318.68 600
Max +ve BM
My ((1-SQRT(1-4.6/30*0.09))*30/415)*50 0.02 116.28 600
Max -ve BM
Mx ((1-SQRT(1-4.6/30*0.32))*30/415)*50 0.09 420.80 600
Max -ve BM
Mx ((1-SQRT(1-4.6/30*0.11))*30/415)*50 0.03 150.11 600
Reinforcement due to axial tension
pre. On plate 1/2 10.9*12.5/2 68.13 t per 3m
22.71 t/m
Reinforcment 987.32 sq.mm
495 sq.mm per face
Total Ast 1287.32 sq.mm
Y16-150 mm c/c b/w coal side portion
From STAAD Results (Mton meter)
mx My Mxy
tm tm tm
49651 100 -2.6 4.01 0.2 ( Ignoring junction of walls)
with revised moments from staad , Provided reinforcement is oK
Shear check is not critical
My* = My+Mxy 4.30 tm 15.681+1.288
Mu = 4.30 tm
Mu/Bd^2 = 0.93 considered deff as 215mm
pt = 0.26
Ast = 560.00 sq.mm
Y16-100
Y16-150
Both faces Both faces
Y16-100
Y16-150
16
RAYALASEEMA THERMAL POWER PROJECT(1X600MW)
Project Designed SKR
(COAL HANDLING PACKAGE)
1 COL Mkd. CF-8,9 size (mm) 600 x 1500 deff. = 1440 min Ast 1814
CF-17,18 BM on E/F ™ 245 Mu/bd2 1.969 pt 0.4868 Ast 4206 7-Y32 E/F
BM away from e/f™ 85 Mu/bd2 0.683 pt 0.1608 Ast 1390 7-Y32 away from E/f
BM away from e/f™ 111 Mu/bd2 0.595 pt 0.1396 Ast 1809 7-Y32 away from E/f
BM away from e/f™ 140 Mu/bd2 0.413 pt 0.0962 Ast 2436 12-Y32 away from E/f
BM away from e/f™ 187 Mu/bd2 0.209 pt 0.0484 Ast 1554 10-Y32 away from E/f
BM away from e/f™ 330 Mu/bd2 0.482 pt 0.1130 Ast 3170 10-Y32 away from E/f
7 COL Mkd. Floating column(FC3) size (mm) 500 x 600 deff. = 510 min Ast 2040
Refer staad column design results
12-Y20
column des results 2400 Y8-links
Floating cloumn supporting rail beams 17
8 COL Mkd. CF-11 CF-15 size (mm) 600 x 1500 deff. = 1440 min Ast 1814
BM on E/F ™ 225 Mu/bd2 1.808 pt 0.4441 Ast 3837 5-Y32 E/F
BM away from e/f™ 102 Mu/bd2 0.820 pt 0.1939 Ast 1676 5-Y32 away from E/f
BM away from e/f™ 70 Mu/bd2 1.473 pt 0.3570 Ast 1906 5-Y32 away from E/f
BM away from e/f™ 30 Mu/bd2 0.241 pt 0.0559 Ast 483 5-Y32 away from E/f
BM away from e/f™ 170 Mu/bd2 1.366 pt 0.3298 Ast 2850 7-Y32 away from E/f
16-Y20
column des results 4600 Y8-links
12 COL Mkd. SC2,SC4(2 No.s) size (mm) 1150 x 500 deff. = 440 min Ast 1063
16-Y20
column des results 5000 Y8links
13 COL Mkd. SC7,SC8,SC9&SC10 size (mm) 1250 x 600 deff. = 540 min Ast 1418
20-Y20
column des results 6000 Y8links
18
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
** +ve & -ve BM supp and span respectively Vus/d = 3.092 provide Y8-4L-200
Beam Mkd. FB2 4.NOS size (mm) 400 x 450 deff. = 395 min Ast 284
_FB2 19491 TO 19433,19488 TO 19490,19274 TO 19279
span - ve BM ™ 2 Mu/bd2 0.320 pt 0.074 Ast 118 3-Y-20(ST) BOT
supp +ve BM ™ 4 Mu/bd2 0.641 pt 0.151 Ast 238 3-Y-20(ST) TOP
SF (t) 5 Tv 0.32 beta 26.97 Tc 0.250
** +ve & -ve BM supp and span respectively Vus/d = 0.265 provide Y8-2L-200
Beam Mkd. FB3 size (mm) 500 x 950 deff. = 895 min Ast 806
_FB3 19285 TO 19308
span - ve BM ™ 50 Mu/bd2 1.248 pt 0.300 Ast 1342 4-Y32(ST) BOT
supp +ve BM ™ 75 Mu/bd2 1.873 pt 0.461 Ast 2063 4-Y32(ST)+2-Y20(X) TOP
SF (t) 122 Tv 2.73 beta 8.81 Tc 0.411
** +ve & -ve BM supp and span respectively Vus/d = 11.578 provide Y12-4L-100
Beam Mkd. FB5 2.NOS size (mm) 350 x 750 deff. = 695 min Ast 438
_FB5 19426 TO 19459,19460 TO 19487,19282 TO19284,19309
span - ve BM ™ 33.5 Mu/bd2 1.982 pt 0.490 Ast 1192 4-Y25(ST)+2-Y25(x) BOT
supp +ve BM ™ 45 Mu/bd2 2.662 pt 0.678 Ast 1649 4-Y25(ST)+2-Y25(x) TOP
SF (t) 21.25 Tv 0.87 beta 6.00 Tc 0.482
additional moment due to monorail load of 2t = 1.25*2 = 2.5t , 2.5*9/4 *1.5 =8.5tm at supports, SF = 1.25t
** +ve & -ve BM supp and span respectively Vus/d = 1.369 provide Y8-2L-200
Beam Mkd. FB6,FB7,FB8 size (mm) 350 x 750 deff. = 695 min Ast 438
_FB6 19392 TO 19425, FB7 19358 TO 19391
span - ve BM ™ 43.5 Mu/bd2 2.573 pt 0.65 Ast 1588 4-Y25(ST)+2-Y20(x) BOT
supp +ve BM ™ 67 Mu/bd2 3.963 pt 1.077 Ast 2621 4-Y25(ST)+2-Y25(x) TOP
SF (t) 36.25 Tv 1.49 beta 3.77 Tc 0.581
additional moment due to monorail load of 2t = 1.25*2 = 2.5t , 2.5*9/4 *1.5 =8.5tm at supports, SF = 1.25t
** +ve & -ve BM supp and span respectively Vus/d = 3.184 provide Y8-4L-200
Beam Mkd. FB9 size (mm) 1500 x 1500 deff. = 1445 min Ast 3902
_FB8 21952 TO 21979
span - ve BM ™ 90 Mu/bd2 0.287 pt 0.067 Ast 1446 12-Y25(ST) BOT
supp +ve BM ™ 265 Mu/bd2 0.846 pt 0.200 Ast 4342 12-Y32(ST)+4-Y20(X) TOP
SF (t) 255 Tv 1.18 beta 20.29 Tc 0.285 10-Y25 E/F
** +ve & -ve BM supp and span respectively Vus/d = 13.374 provide Y12-4L-100
19
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Beam Mkd. SB1 & SB5 size (mm) 500 x 900 deff. = 845 min Ast 761
_SB2 19537 TO 19555 18873 TO 18877 SB2 18878 TO 18882 19494 TO 19507
span - ve BM ™ 65 Mu/bd2 1.682 pt 0.411 Ast 2285 10-Y25 BOT
supp +ve BM ™ 110 Mu/bd2 2.847 pt 0.731 Ast 4065 10-Y25 TOP
SF (t) 45 Tv 0.81 beta 5.56 Tc 0.498
** +ve & -ve BM supp and span respectively Vus/d = 2.494 provide Y10-2L-200
Beam Mkd. SB3 4.NO.S size (mm) 500 x 1000 deff. = 945 min Ast 851
20
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT ANALYSIS AND DESIGN OF WAGON TIPPLER
21
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP) PACKAGE
22
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP) PACKAGE
Beam Mkd.TB9,10,11 ,12 size (mm) 300 x 900 deff. = 845 min Ast 456
_TB9,TB10 21093 to 21142 21156 to 21203
span - ve BM ™ 41 Mu/bd2 1.914 pt 0.472 Ast 1197 4-Y25(ST) BOT
supp +ve BM ™ 20 Mu/bd2 0.934 pt 0.222 Ast 562 4-Y20(ST) TOP
SF (t) 62 Tv 2.45 beta 8.61 Tc 0.415
** +ve & -ve BM supp and span respectively Vus/d = 6.093 provide Y10-4L-150
Beam Mkd.TB15 TB24 400 x 1000 deff. = 945 min Ast 680
_TB13 20037 to 20050,20129 TO 20131,20134,20135 ,19161 TO19162,20121 20122 20125
span - ve BM ™ 65 65 Mu/bd2 1.820 pt 0.447 Ast 1690 4-Y25(ST) BOT
supp +ve BM ™ 80 Mu/bd2 2.240 pt 0.560 Ast 2116 4-Y32(ST TOP
70 Tv 1.85 beta 7.26 Tc 0.446
** +ve & -ve BM supp and span respectively Vus/d = 5.6244 provide Y10-4L-200
Beam Mkd.TB17, TB26, TB18,TB27 400 x 900 deff. = 845 min Ast 608
_TB17,18TB26,27 58497 TO 58512
_TB18,TB27 20063 TO 20071,20009,20010,20014,20111 TO20115
span - ve BM ™ 45 Mu/bd2 1.576 pt 0.383 Ast 1296 4-Y25(ST) BOT
supp +ve BM ™ 81 Mu/bd2 2.836 pt 0.728 Ast 2461 4-Y32(ST TOP
SF (t) 25 25 Tv 0.74 beta 5.58 Tc 0.497
** +ve & -ve BM supp and span respectively Vus/d = 0.972 provide Y10-4L-200
Beam Mkd.TB19,TB28 400 x 1825 deff. = 1770 min Ast 1274
21218 TO 21221,19965 21254 TO 21258
_TB19,TB28
span - ve BM ™ 201 Mu/bd2 1.604 pt 0.391 Ast 2766 4-Y32(ST BOT
supp +ve BM ™ 111 Mu/bd2 0.886 pt 0.210 Ast 1487 4-Y25(ST) TOP
SF (t) 70 Tv 0.99 beta 10.40 Tc 0.383
** +ve & -ve BM supp and span respectively Vus/d = 2.425 provide Y8-4L-200
Beam Mkd.TB31 400 x 600 deff. = 545 min Ast 392
_TB31 20326 TO 20331
span - ve BM ™ 5 Mu/bd2 0.421 pt 0.098 Ast 214 4-Y20(ST) BOT
supp +ve BM ™ 5 Mu/bd2 0.421 pt 0.098 Ast 214 4-Y20(ST) TOP
SF (t) 5 Tv 0.23 beta 41.40 Tc 0.205
** +ve & -ve BM supp and span respectively Vus/d = 0.096 provide Y8-2L-200
Beam Mkd.TB13, TB14 TB22 TB23 TB20 TB29 600 x 1250 deff. = 1195 min Ast 1291
_TB13 20037 to 20050,20129 TO 20131,20134,20135 ,19161 TO19162,20121 20122 20125
span - ve BM ™ 90 90 Mu/bd2 1.050 pt 0.251 Ast 1797 6-Y25(ST) BOT
supp +ve BM ™ 130 Mu/bd2 1.517 pt 0.368 Ast 2641 6-Y32(ST TOP
SF (t) 120 Tv 1.67 beta 11.03 Tc 0.373
** +ve & -ve BM supp and span respectively Vus/d = 7.8042 provide Y10-4L-125
RAIL SUPPORTING BEAMS
Beam Mkd.RB4,5 500 x 1350 deff. = 1295 min Ast 1166
_TB31 20326 TO 20331
span - ve BM ™ 160 Mu/bd2 1.908 pt 0.470 Ast 3046 8-Y32(ST) BOT
supp +ve BM ™ 245 Mu/bd2 2.922 pt 0.753 Ast 4876 8-Y32(ST) TOP
SF (t) 201 Tv 3.10 beta 5.40 Tc 0.504
** +ve & -ve BM supp and span respectively Vus/d = 13.003 provide Y10-6L-125
Beam Mkd.TB34 600 x 800 deff. = 745 min Ast 805
_TB31 20326 TO 20331
span - ve BM ™ 96 Mu/bd2 2.883 pt 0.742 Ast 3315 5-Y32(ST) BOT
supp +ve BM ™ 98 Mu/bd2 2.943 pt 0.759 Ast 3394 5-Y32(ST) TOP
SF (t) 85 Tv 1.90 beta 5.35 Tc 0.505
** +ve & -ve BM supp and span respectively Vus/d = 8.378 provide Y10-6L-200
Beam Mkd.RB2,3 650 x 750 deff. = 695 min Ast 813
_TB31 20326 TO 20331
span - ve BM ™ 28 Mu/bd2 0.892 pt 0.212 Ast 955 5-Y25(ST) BOT
supp +ve BM ™ 23 Mu/bd2 0.733 pt 0.173 Ast 780 5-Y25(ST) TOP
SF (t) 41 Tv 0.91 beta 19.21 Tc 0.292
** +ve & -ve BM supp and span respectively Vus/d = 4.002 provide Y8-4L-150
23
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) ,COAL HANDLING PLANT (CHP) PACKAGE
Beam Mkd.HB1&HB2 size (mm) 700 X 1600 deff. = 1545 min Ast 1947
_HB1 HB2 18524 TO 18573, 19854 TO 19859,19961 TO19964 ,20033 TO20036
M T MT Total Design Moment
span - ve BM ™ 196 7 209.5294 209.53 Mu/bd2 1.254 pt 0.301 Ast 3260 6-Y32(ST) BOT
supp +ve BM ™ 70 10 89.32773 89.33 Mu/bd2 0.535 pt 0.125 Ast 1354 6-Y25(ST) TOP
SF (t) 86 9 106.5714 106.57 Tv 0.99 beta 13.48 Tc 0.342
additional moment due to monrail load of 5t = 1.25*5 = 6.25t , 6.25*13/4 *1.5 =30.5tm at supports, SF = 3.125t
** +ve & -ve BM supp and span respectively Vus/d = 4.506 provide Y10-4L-200
Beam Mkd.HB3&HB4 size (mm) 1000 X 1600 deff. = 1545 min Ast 2781
_HB3 HB4 19580 TO 19658
M T MT Total Design Moment
span - ve BM ™ 401 31 448.4118 448.41 Mu/bd2 1.879 pt 0.463 Ast 7148 8-Y32(ST)+4-Y32(X) BOT
supp +ve BM ™ 370 31 417.4118 417.41 Mu/bd2 1.749 pt 0.428 Ast 6619 8-Y32(ST)+4-Y32(X) TOP
SF (t) 145 32 196.2 196.20 Tv 1.27 beta 8.78 Tc 0.411
additional moment due to monrail load of 5t = 1.25*5 = 6.25t , 6.25*13/4 *1.5 =30.5tm at supports, SF = 3.125t
** +ve & -ve BM supp and span respectively Vus/d = 8.586 provide Y12-4L-125
Beam Mkd.HB5,HB7 2.nos 500 x 1600 deff. = 1545 min Ast 1391
_HB5 19976 TO 19983, 20067,20004 TO 20013 HB7 19984 TO19991,20080,20015 TO 20024
span - ve BM ™ 60 Mu/bd2 0.503 pt 0.118 Ast 908 5-Y25(ST) BOT
supp +ve BM ™ 285 Mu/bd2 2.388 pt 0.601 Ast 4641 5-Y32(ST)+2-Y25(X) TOP
SF (t) 62 Tv 0.80 beta 6.76 Tc 0.459
** +ve & -ve BM supp and span respectively Vus/d = 1.718 provide Y8-4L-200
Beam Mkd.HB6 2.nos 500 x 1600 deff. = 1545 min Ast 1391
_HB6 18488 TO 18497,19095 19099,19109,19112,19115
span - ve BM ™ 6 Mu/bd2 0.050 pt 0.012 Ast 89 5-Y25(ST) BOT
supp +ve BM ™ 270 Mu/bd2 2.262 pt 0.566 Ast 4373 5-Y32(ST)+2-Y25 TOP
SF (t) 60 Tv 0.78 beta 7.18 Tc 0.448
** +ve & -ve BM supp and span respectively Vus/d = 1.644 provide Y8-4L-200
Beam Mkd.HB 8 2104 x 1600 deff. = 1545 min Ast 5851
_HB7 19984 TO19991,20080,20015 TO 20024
span - ve BM ™ 330 Mu/bd2 0.657 pt 0.155 Ast 5024 14-Y32(ST) BOT
supp +ve BM ™ 590 Mu/bd2 1.175 pt 0.282 Ast 9151 14-Y32(ST) TOP
SF (t) 328 Tv 1.01 beta 14.44 Tc 0.332
** +ve & -ve BM supp and span respectively Vus/d = 14.254 provide Y12-6L-150
SAC Beam
Beam Mkd. size (mm) 2250 X 1500 deff. = 1445 min Ast 5852
SAC beam 23139 TO 23253
M T MT Total Design Moment
span - ve BM ™ 167 66 231.7059 231.71 Mu/bd2 0.493 pt 0.115 Ast 3750 20-Y20
supp +ve BM ™ 167 66 231.7059 231.71 Mu/bd2 0.493 pt 0.115 Ast 3750 20-Y20
SF (t) 84 32 106.7556 106.76 Tv 0.33 beta 35.24 Tc 0.221
** +ve & -ve BM supp and span respectively Vus/d = 2.407 provide Y10-6L-200
24
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
25
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
Design of Pivot Piller ( 1150x1600) (Refer drg no RTPP-CHP-WT-CVL-001)
A
Load position -I
2.5
Mx 30 tm
1.6
x My 16.5 tm
MY 105.3 tm
Mx 76.8 tm
1.15 P L1 206.3525 t ( down ward)
Fy across rail 39 t (lateral)
A
P y
0.7
1.6
1.2
1.2
1
2.5
179.47
0.44
CG
beam/column
0.63
0.85
Beam/column
Mu/fckb
Case P My Mx My' Mx' pu/fckbd Mu/fckdb^2 d^2 p/fck p Ast Min As Prov
2 206 105 77 261.52 FALSE 0.060 0.064 0.000 0.03 0.9 18450 16400 27032
A
Load position -I
2.5
Mx 30 tm
1.6
x My 16.5 tm
MY 162.7 tm
Mx 217.2 tm
1.15 P L1 225.41 t ( down ward)
Fy across rail 39 t (lateral)
A
P y
0.7
1.6
4.8
4.8
1
2.5
179.47
0.44
CG
beam/column
0.63
0.85
Beam/column
Mu/fckb
Case P My Mx My' Mx' pu/fckbd Mu/fckdb^2 d^2 p/fck p Ast Min As Prov
1 225 163 217 FALSE 290.77 0.055 0.000 0.035 0.01 0.3 6150 16400 27032
28
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
Configuration and loading
along rail 3.3225
across B = 45 T B = 45.T B= 45 T 3.5t due to r.w
593
248 C=16.7T
C=16.7 T 850
1900
C=16.7 T
1059
0.56
1400
421
669
wall 2 /C2/C3
593
Section A-A
Design
Loading( Refer load data drawing no
A - 15t( )
B - 45t ( + or - along railway track)
C - 16.7t (+ or - across railway track)
load combinations
Case 1) Wagon tippler at rest with wagon ie wagon just kept on tippler table - (A, B and C) loading
Case 2) Wagon just lift from rest position but it is still connected to load cell - (A) & (C) loading
Horizontal load along the rail is not critical for design
Total Moment = 0.5*0.33*2.1*2.215*(2.215/3)+3.5*1.5+45*1.5 73.316669
= 73.32 109.98 (Factored Moment) = 110 t-m
M/Bd^2 = 110*10000000/1890/1685^2 0.2049892
Provide Min steel 15-Y25(T) through along 3.8m direction
15-Y20(B) through along 3.8m direction
stirups Y10-4L-125mm c/c veritcal
4 no.s of Y12-4L horizantal
Compare with staad analysis and results
size (mm) 1890 x 1685 deff. = 1635 min Ast 5562
29
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
30
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Designed ( type-1)
3.6
3.6
5.2
4.5
6.1 4.5
Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
N/mm2 % mm² mm² mm 31 mm mm²
1.99 0.49 985.64 240 16 150 1340.41
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Designed ( type-3)
4.7
6.5
4.7
Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
N/mm2 % mm² mm² mm mm mm²
2.12 0.53 1055.98 240 16 150 1340.41
Designed ( type-4)
4
5.45 32
Design BM = 5.90 T-m
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
N/mm2 % mm² mm² mm mm mm²
1.93 0.48 950.77 240 16 150 1340.41
UDL = DL+LL 4 t
Mid landing Beam LB1 & LB2 ( cantilever)
( span 2.0m) BM = 8.75 t-m
Mu = 2.16 N/sq.mm 2.6
(300x500) Bd^2
Pt = 0.54
Ast 807.47 sq.mm
Hence Provide 3-Y20 at top and 3-Y20 at bottom ( shear reinf. Y8- 2l-150)
33
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
34
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
SUBJECT DESIGN OF WAGON TIPPLER COMPLEX -
Check for stability
As the wall is resting on 300 thick solid raft/slab which is monolithk with main Wt structure
and supported on PCC back fill over a compacted earth fill and hence the stability of retaining wall is not critical for design.
Force LA Moment
earth pressure 3.22331625 1.016666667 3.28
LL surcharge pressure 2.013 1.525 3.07
5.23631625 6.35 @ bottom of wall
earth pressure +
ll surcharge pressure
Total designed ht = 3.05 m
Wall design
slab
BM = 6.35 t-m 15.9 T-m
Thickness of wall= 300 mm
Clear cover to reinforcemen= 50 mm
Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
2
N/mm % mm² mm² mm mm mm²
Wall design (acted upon by horizontal thrust L7 of +or- 5 T, vertical not critical for wall design )
5 t acting at 3.00 m width I.e 5 /3.0 = 1.67 t
Design BM due to thrust = 1.67 * 3.05 = 5.1 tm
Total design BM = 6.35 + 5.1 = 11.45 tm/m
M/bd2 = 0.85, pt = 0.24, Ast = 0.24*1000*450/100 = 1080 sqmm
Hence provide Y16-150 c/c for retaining wall acted upon by thrust of 5 t on e/f
(For 500 mm thick wall provide Y16-150 mm c/c on Either face)
As the wall is resting on 500 thick solid raft (slab) which is monolith with main Wt structure
Hence the stability of retaining wall is not critical for design.
35
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Wall design
Mu/bd² Pt Ast reqd Min Ast Dia of bar Spacing Ast pro
2
N/mm % mm² mm² mm mm mm²
36
PROJECT RAYALASEEMA THERMAL POWER PROJECT(1X600MW) , COAL HANDLING PLANT (CHP) PACKAGE
Hopper wall
Hopper wall
Considered 10t point load per wheel is considered on grating beams (4x 10 = 40t < 35T.0 as per spec)
Beam Mkd. GB1 500 x 750 deff. = 695 min Ast 626
bot - ve BM ™ 48 Mu/bd2 1.987 pt 0.492 Ast 1708 5-Y25(ST) BOT
top +ve BM ™ 0 Mu/bd2 0.000 pt 0.000 Ast 0 5-Y20(ST) TOP
SF (t) 30 Tv 0.86 beta 8.27 Tc 0.422
37