Assessment Report

Learners name: Florin Petre Date:01/10/2018


Assessor’s name: Ionut Mirea Location: London
Qualification: Occupation Work Supervision - Level 3

Assessment details: Learning Assessment


outcomes criterion
T/503/2723 – Implementing and Maintaining Health, Safety and Welfare.
R/503/2924 – Confirming the Occupational Method of Work
M/503/2915 – Developing and maintaining good occupational working
relationships
F/503/2725 – Co-ordinating and organising work operations
A/503/2723 – Confirming work activities and resources for an occupational
work area
J/503/2743 – Confirming work meets quality standards
L/503/ 2744 – Implementing Procedures to Support the team’s
performance

On arrival in site, Florin was waiting for and he was very


happy to have me there, observing his work. He was a
supervisor for drylines an had a small team under his
supervision. I was invited on site, where I did a risk assessment
myself, to take part to an induction as there were new workers
that came to work for the same company, where Florin was
working.
Florin has been given information from the site managers in
form of RAMS and he presented all the workers all the relevant
information about the site rules and requirements, about the
criteria for the project, statutory requirements, clients needs
and other environmental considerations. During the induction,
Florin also mentioned about the personal protective equipment
and that is compulsory at all times when working or in areas
where there are signs to follow. (R/503/2924 – 1.1, 2.1, 3.1, R/503/2924 1.1, 2.1, 3.1,
3.2, 4.1, 4.2) 3.2, 4.1, 4.2
They were also instructed about the tools and equipment they
need to use correctly and only if trained. Florin also mentioned
that he and another colleague are first aiders, if any problems
appear then they can help. Florin, also mentioned that all
problems need to be addressed and be able to solve. This was
part of promoting the culture of health and safety and welfare
activities. He also mentioned all the facilities they have on site, 1.1, 1.2, 1,5,
T/503/272
canteen, changing rooms, lockers, toilets, water (T/503/2723 – 2.1, 2.5, 2.6,
1.1, 1.2, 1,5, 2.1, 2.5, 2.6, 3.1, 3.3, 3.4) After everyone 3 3.1, 3.3, 3.4
considered all the information from the induction, the tasks
were allocated for the job is a new area and this time internal
walls were put up to a basement are and they need to consider
the partitioning, in order to divide it smaller spaces for some
storage rooms. Florin instructed them that some parts of the
area is not available for partitioning because some plumbers
still work to some pipes. Florin showed the available area. He
was able to allocate work despite the fact that specific area was
not available and avoid delays (M/503/2915 –2.1, 2.2, 3.1, 3.2, 2.1, 2.2, 3.1,
4.1, 4.2, 5.1) (A/503/2725 – 1.1, 1.2, 2.1, 2.2, 3.1, 6.5, 6.6, 7.2, M/503/29 3.2, 4.1, 4.2,
8.1, 8.2) 15 5.1
After the first break, Florin received some information from the
site manager in regards with dust control and environment 1.1, 1.2, 2.1,
protection and he had to pass the information. He mentioned 2.2, 3.1, 6.5,
once again the mandatory PPE and masks that they need to 6.6, 7.2, 8.1,
A/503/272 8.2
wear whenever they need to cut plasterboard. He also
mentioned measures on how to control the dusty area to other 5
traders as well (A/503/2772 – 1.2, 2.1, 3.1, 4.1, 4.5, 4.6, 5.1, 1.2, 2.1,
5.3) 3.1, 4.1,
After they have finished work for the day, Florin instructed that
4.5, 4.6,
the tools are in place and the area is clean and prepared for
5.1, 5.3
tomorrow. During the day, I could observe Florin, concerned
A/503/277
about the quality of the job his team was doing, checking and
2
asking for information whenever was possible. He needed to
report to the site managers and everything had to be the 1.1, 1.2, 1.4,
standards expected (J/503/2743 – 1.1, 1.2, 1.4, 2.1, 2.2, 3.2, 2.1, 2.2, 3.2,
3.4, 4.2) (L/503/2744 – 1.1, 2.1, 2.5, 3.2) 3.4, 4.2
Florin proved good communication skills during the observation J/503/274
in the sense that he not only spoke with his team but also 3 1.1, 2.1, 2.5,
asked for their opinion, they could share their suggestions and 3.2
other problems. They had the opportunity to feel valued and
appreciated for their work. Florin praised them and offered
good and constructive feedback at all times.
L/503/274
4

Feedback Assessor
Well done, Florin! You have showed good knowledge and experience in working with people,
delegating tasks and dealing with problems, delays and conflicts. You have proved good
communication and management skills. Continue the good work!

During this holistic observation you have achieved all the LO from the units below.
T/503/2723 – Implementing and Maintaining Health, Safety and Welfare
1.1, 1.2, 1,5, 2.1, 2.5, 2.6, 3.1, 3.3, 3.4
R/503/2924 – Confirming the Occupational Method of Work
1.1, 2.1, 3.1, 3.2, 4.1, 4.2
M/503/2915 – Developing and maintaining good occupational working relationships
2.1, 2.2, 3.1, 3.2, 4.1, 4.2, 5.1
F/503/2725 – Co-ordinating and organising work operations
1.1, 1.2, 2.1, 2.2, 3.1, 6.5, 6.6, 7.2, 8.1, 8.2
A/503/2723 – Confirming work activities and resources for an occupational work area
1.1, 1.2, 1,5, 2.1, 2.5, 2.6, 3.1, 3.3, 3.4
J/503/2743 – Confirming work meets quality standards
1.1, 1.2, 1.4, 2.1, 2.2, 3.2, 3.4, 4.2
L/503/ 2744 – Implementing Procedures to Support the team’s performance
1.1, 2.1, 2.5, 3.2

Assessor Signature Ionut Mirea Date: 01/10/2018


Next observation Date: 29/01/2019