In the case of two-step picking, the process is split into two separate steps. It could be bene t for that two step
picking reduces the movements of picking operations.

Giving an example if necessary, multiple warehouse tasks can be created at one time by using wave. You can
create a wave and you can assign the document numbers of the corresponding outbound deliveries to wave you
created for release.

https://blogs.sap.com/2018/09/09/two-step-pick/ 1/18
4/28/2019 EWM : Wave Management | SAP Blogs

As you see on the screenshot 2 that 8 WT created by one time.

I will share the con guration steps with you

1. Set up Two Step-Picking

https://blogs.sap.com/2018/09/09/two-step-pick/ 2/18
4/28/2019 EWM : Wave Management | SAP Blogs

In this screen you can activate two-step picking for a warehouse and make settings for two-step picking.

https://blogs.sap.com/2018/09/09/two-step-pick/ 3/18
4/28/2019 EWM : Wave Management | SAP Blogs

As you see on the screenshot 4 there is a relationship between the storage type and the process type in two-
step picking. If two-step picking is relevant for a wave, the system executes the pick step with the warehouse
process type that you chose.

The process type 2020 has detail that storage type into which the product is put away which is warehouse type
2010.

The logic here is to move the material from the high rack storage to 2010 named Interim Zone 2-Step Picking.

2. SPECIFY STORAGE TYPE SEARCH SEQUENCE

In this step, you create the storage type search sequence for stock removal.

https://blogs.sap.com/2018/09/09/two-step-pick/ 4/18
4/28/2019 EWM : Wave Management | SAP Blogs

I created the storage type search sequence that named PICK for the for stock removal.

https://blogs.sap.com/2018/09/09/two-step-pick/ 5/18
4/28/2019 EWM : Wave Management | SAP Blogs

As you see on the screenshot 8,  the relevant material will be picked from the storage type 0070.

https://blogs.sap.com/2018/09/09/two-step-pick/ 6/18
4/28/2019 EWM : Wave Management | SAP Blogs

The purposes of these steps that the relevant material will be picked from the storage type 0070 to move the
storage type 2010 with using the process type 2020 and then it will be picked from the storage type 2010 to
move the storage type 9020 with using the process type 2010.

      3. Determine Storage Type Search Sequence for Stock Removal

In this step, you can specify the storage type search for the storage type search sequence during stock
removal.

The storage type search sequence contains information about the storage types in which the system will
search for stock during stock removal, and in which sequence the stock should be sorted. The storage type
search that you set up here refers to the storage type search sequence and to the stock removal rule. You can
also use a preference list to specify the sequence of storage types/storage type groups from which the system
should remove stock first, where possible.

The storage type 2010 should not be confused with 2010 here because 2010 is a process type in here.

      4. Optimization of Access Strategies for Stor. Type Determination in Stck. Rmvl

In this step, you can optimize the access strategy for the storage type search.

https://blogs.sap.com/2018/09/09/two-step-pick/ 7/18
4/28/2019 EWM : Wave Management | SAP Blogs

2SP           : If set, the system uses the two-step picking indicator of the product to be moved for the relevant
table entry, in order to access the storage type search table.

Proc. Type: Causes the system to use the warehouse process type to access the table of the storage
determination type for the a ected table entry.

        

      5. Maintain The Two-Step Relevance for The Warehouse Products

You can mantain The Two-Step Relevance for the material by using transaction code /SCWM/MAT1
https://blogs.sap.com/2018/09/09/two-step-pick/ 8/18
4/28/2019 EWM : Wave Management | SAP Blogs

The two-step picking ag is on the Whse Data tab, in the subsection Stock Removal. Enter a 2 for Two-Step via
Two-Step Procedure.

  6. Mantain Conditions for Determining Wave Templates

De ne Wave Template:

You can create Wave Template with the transaction code /SCWM/WAVETMP – Maintain Wave Templates. I
chose work area as 1710 thats why my plant code number is.

https://blogs.sap.com/2018/09/09/two-step-pick/ 9/18
4/28/2019 EWM : Wave Management | SAP Blogs

I created the template 1710 and i chose release method as Manual.

Release Method: Determines the way in which the standalone wave, or wave based on the template, is to be
released.

You can determine that a wave is to be released in one of the following ways:

Automatically – The wave is to be automatically released at the de ned release date and time

Immediately – The wave is to be released at the current time

Manually – The wave is to be released manually from the warehouse management monitor (Release Wave
method)

https://blogs.sap.com/2018/09/09/two-step-pick/ 10/18
4/28/2019 EWM : Wave Management | SAP Blogs

You can go to cctc tab and press f4 in /SCWM/WDGCM – Maintain Conditions for Determining Wave Templates.

I chose condition type ZTSP that i created and i ll in the relevant elds

https://blogs.sap.com/2018/09/09/two-step-pick/ 11/18
4/28/2019 EWM : Wave Management | SAP Blogs

Sample Practice

Step 1 –> Create outbound deliveries .

100000470 – 100000471

Step 2 –> Create wave and assign deliveries. /SCWM/WAVE is used to create waves.

1-Create wave

2-Assign deliveries

https://blogs.sap.com/2018/09/09/two-step-pick/ 12/18
4/28/2019 EWM : Wave Management | SAP Blogs

Step 3 –> Click Release Withdrawal

When i release withdrawal, system creates 2 warehouse task to pick up HU interim storage area (2010 à Storage
type is used to collect pallets that is the rst step of picking)

Con rm WT –> HU will be transfered into 2010 storage area.

https://blogs.sap.com/2018/09/09/two-step-pick/ 13/18
4/28/2019 EWM : Wave Management | SAP Blogs

Step 4 –> Starting of 2 step; release wave then release subdivision.

System will be create WT to transfer HU from interim storage area into picking storage area.

When we complete WT picking , they will be transfer to 9020 storage area. However, picking will be completed.

2 step picking completed.

That’s all the whole con guration steps about two step picking. After that It is the outbound delivery period.
Please ask me if you have any questions. i thanks to Mehmet Ozgur Unal who giving me guidance in this work. I
hope it will help you, please like it if it helps you.

https://blogs.sap.com/2018/09/09/two-step-pick/ 14/18
4/28/2019 EWM : Wave Management | SAP Blogs

Alert Moderator

Assigned tags

EWM - Delivery Processing | EWM - Goods Movement |

Related Blog Posts

REVERSE FOR GOOD ISSUE IN EWM


By Suatcan Pekak , Mar 26, 2019

Related Questions

Wave creation in EWM (S4HANA)


By Brian El e , Dec 06, 2018

Picking for 3 outbound delivery


By Mehmet Ozgur Unal , Jul 31, 2018
SAP EWM one task for 2 delivery items having same material
By João Calinas , Feb 26, 2019

6 Comments

You must be Logged on to comment or reply to a post.

Mehmet Ozgur Unal

September 10, 2018 at 4:56 am


Hello Suatcan Pekak

Good job, it contains two-step picking con gurations and example in EWM.

However, could you change blog name to Wave Management .

https://blogs.sap.com/2018/09/09/two-step-pick/ 15/18
4/28/2019 EWM : Wave Management | SAP Blogs

Keep it up !

Brgds

M.Ozgur Unal

Like (0)

Hendrik Schulte-Bahrenberg

September 19, 2018 at 10:12 am


Thanks for publishing.

There is one small mistake in the paragraph:

“The purposes of these steps that the relevant material will be picked from the storage type 0070 to move the
storage type 2010 with using the process type 2010 and then it will be picked from the storage type 2010 to move
the storage type 9020 with using the process type 2020.”

I think you mixed up the WPTs here. 2010 and 2020 should be exchanged.

Like (1)

Suatcan Pekak | Post author

September 19, 2018 at 2:35 pm


Yes, you are right. I edited the document

Thanks for the correction.

BR

Suatcan Pekak

Like (0)

https://blogs.sap.com/2018/09/09/two-step-pick/ 16/18
4/28/2019 EWM : Wave Management | SAP Blogs

Ashish Kaple

September 24, 2018 at 12:07 pm


Hi Suatcan,

That’s amazing work. Thanks for sharing.

Regards,

Ashish

Like (1)

Suatcan Pekak | Post author

September 24, 2018 at 1:39 pm


Hi Ashish

Thank you. I hope it will be helpful.

BR

Suatcan

Like (0)

Bálint Mészáros

February 15, 2019 at 4:22 pm


Hi Suatcan,

Great post, very much appreciated!

I’m missing some info on storage type 2010, and warehouse process type 2010 though. Can you please help
what are the most important settings with those 2?

 
https://blogs.sap.com/2018/09/09/two-step-pick/ 17/18
4/28/2019 EWM : Wave Management | SAP Blogs

Thanks

Bálint

Like (0)

Share & Follow

Privacy Terms of Use

Legal Disclosure Copyright

Trademark Cookie Preferences

Sitemap Newsletter

https://blogs.sap.com/2018/09/09/two-step-pick/ 18/18

Вам также может понравиться