The inspection checklist is used to ensure the proper application of cement stucco to the exterior of a building. It lists 5 key items to inspect: 1) approvals, 2) surface preparation, 3) application of the stucco base, 4) application of primer, and 5) application of the finish coat. For each item, inspectors from the subcontractor and contractor must verify that proper procedures are followed, such as applying the appropriate thickness of stucco base and allowing coats to dry before proceeding. The inspection aims to guarantee the stucco application meets contract requirements and manufacturer recommendations.
The inspection checklist is used to ensure the proper application of cement stucco to the exterior of a building. It lists 5 key items to inspect: 1) approvals, 2) surface preparation, 3) application of the stucco base, 4) application of primer, and 5) application of the finish coat. For each item, inspectors from the subcontractor and contractor must verify that proper procedures are followed, such as applying the appropriate thickness of stucco base and allowing coats to dry before proceeding. The inspection aims to guarantee the stucco application meets contract requirements and manufacturer recommendations.
The inspection checklist is used to ensure the proper application of cement stucco to the exterior of a building. It lists 5 key items to inspect: 1) approvals, 2) surface preparation, 3) application of the stucco base, 4) application of primer, and 5) application of the finish coat. For each item, inspectors from the subcontractor and contractor must verify that proper procedures are followed, such as applying the appropriate thickness of stucco base and allowing coats to dry before proceeding. The inspection aims to guarantee the stucco application meets contract requirements and manufacturer recommendations.
Project Title : CONSTRUCTION OF FACILITIES AND INFRASTRACTURE TO SUPPORT MH‐60R AIRCRAFT Page No.: 1 of 1 Contract No. : W912ER18C0015 Revision No.: 01 Sub-Contractor : NABA INTERNATIONAL COMMERCIAL ENTERPRISES LTD.
Description : Location : Inspection Date : RFI No. :
Item SUB-CONTRACTOR CONTRACTOR
ITEMS OF INSPECTION DATE REMARKS No. YES NO N/A YES NO N/A
1.0 Approvals
1.1 Shop Drawings
1.2 Materials
2.0 Surface Preparation
Surface shall be free of dust, dirt, grease, oil, laitance, efflorescence, biological residue, existing paint or coatings, curing 2.1 compounds, form release agents or any other contaminants which might affect the bond. 2.2 Reference mark are provided for verticality
2.3 Repair Tie rod holes, pinholes, honeycombs
Check corner beads, horizontal reveal joints 2.4 other accessories carefully for alignment before starting work 3.0 Application of Stucco Base Apply stucco base 10mm to 15mm 3.1 completely embedding the lath Stucco base shall be applied base of 3.2 manufacturer recommendation. 4.0 Application of Primer The base coat substrate must be dry clean, 4.1 sound and free of releasing agents, paint or other residue or coatings. Primer shall be dry to the touch before 4.2 proceeding to the Finish Coat application. 5.0 Application of Finish Coat Allow Tinted Primer to dry before applying 5.1 Finish Coat Finish Coat shall be applied base of 5.2 manufacturer recommendation.
CI-NICE-RFI-002 - Inspection For Grabbing and Cutting of Existing Sub-Grade at Northwest and Southeast Corner Prior To Proof Roll Compaction For Maintenance Hangar Building