Doc No : BMI/IV/QC/17

PAINTING Issued Date : 05 Juni 2015


INSPECTION REPORT Revision : 02
Page : of

Client Name : PT. KRAKATAU ENGINEERING


Project Name : Steel Structure Subtrate Coil Yard Building
Location :

SURFACE PREPARATION PROCESS COATING LAYER TEMPERATURE HUMUDITY


SA 1 Wire Brush Spray Gun Standard : Standard :
SA 2 Sweep Blast Brushing Actual : Actual :
SA 2,5 Steel Blast
Blasting Date :
PAINTING SPECIFICATION
COAT NO DESCRIPTION TYPE COLOUR THINNER THICKNESS COATING DATE
COAT 1 PRIMER Micron
COAT 2 INTERMEDIATE Micron
COAT 3 FINISH COAT Micron
TOTAL THICKNESS Micron
PAINTING INSPECTION
MARKING CHECK Thickness
COAT TYPE POINT DFT Remarks
COMPONENT I II III IV V
A
Primer B
C
A
.................................. Intermediate B
C
A
FINISH COAT B
C

Sketch :

Prepared and inspected by : INSPECTED By : Witnessed / Approved by


Company PT. BAKRIE METAL INDUSTRIES PT. KRAKATAU ENGINEERING PT. KRAKATAU NIPPON STEEL SUMIKIN

Signature &
Name
Date
Doc No : SKM/III/QC/15
VISUAL WELDING Issued Date : 20 Mei 2015
INSPECTION REPORT Revision :0
Page : 1 of 1

Client Name : FORMWORK HIRE (S.E.A) PTE., LTD Report No. : SKM-VWIR/179-01/III/17/24T-001
Project Name : MILLENNIUM CENTENNIAL CENTER Date : 18 March 2017
Location : PT.SENTRA KARYA MANDIRI Part No. : P-24-T

DRAWING NO : 2018-C-JF-451
TITLE : TOP PLATFORM
REV : A
QTY : 4 EA

Sketch :

NO INSPECTION QTY Welder Stamp WPS NO RESULT REMARKS


DATE
1 7-Mar-17 2 EA 398 06/WPS-AWS/SKM/2017 ACC
2 7-Mar-17 2 EA 308 06/WPS-AWS/SKM/2017 ACC

Inspected by, Reviewed by, Witnessed/ Approved by,


Company PT. SENTRA KARYA MANDIRI FORMWORK HIRE (S.E.A) PTE., LTD

Signature &
Name
Name

Date March 18, 2017


Doc No : SKM/III/QC/15
VISUAL WELDING Issued Date : 20 Mei 2015
INSPECTION REPORT Revision :0
Page : 1 of 1

Client Name : FORMWORK HIRE (S.E.A) PTE., LTD Report No. : SKM-VWIR/179-01/III/17/24W-001
Project Name : MILLENNIUM CENTENNIAL CENTER Date : 18 March 2017
Location : PT.SENTRA KARYA MANDIRI Part No. : P-24-W

DRAWING NO : 2018-C-JF-452
TITLE : WORKING PLATFORM
REV : A
QTY : 2 EA

Sketch :

NO INSPECTION QTY Welder Stamp WPS NO RESULT REMARKS


DATE
1 5-Mar-17 2 EA 398 06/WPS-AWS/SKM/2017 ACC

Inspected by, Reviewed by, Witnessed/ Approved by,


Company PT. SENTRA KARYA MANDIRI FORMWORK HIRE (S.E.A) PTE., LTD

Signature &
Name
Name

Date March 18, 2017


Doc No : SKM/III/QC/15
VISUAL WELDING Issued Date : 20 Mei 2015
INSPECTION REPORT Revision :0
Page : 1 of 1

Client Name : FORMWORK HIRE (S.E.A) PTE., LTD Report No. : SKM-VWIR/179-01/III/17/24R-001
Project Name : MILLENNIUM CENTENNIAL CENTER Date : 18 March 2017
Location : PT.SENTRA KARYA MANDIRI Part No. : P-24-R

DRAWING NO : 2018-C-JF-454
TITLE : RECOVERY PLATFORM
REV : 0
QTY : 4 EA

Sketch :

NO INSPECTION QTY Welder Stamp WPS NO RESULT REMARKS


DATE
1 6-Mar-17 4 EA 309 06/WPS-AWS/SKM/2017 ACC

Inspected by, Reviewed by, Witnessed/ Approved by,


Company PT. SENTRA KARYA MANDIRI FORMWORK HIRE (S.E.A) PTE., LTD

Signature &
Name
Name

Date March 18, 2017