Customer: ARMPOWER CJSC Cpy n.

: 8001-00001001-PP-148001 Cls 2
Plant Location: Yerevan - Armenia Ctr n.: 8001-03303812-PP148001 Rev 00

Project: Armenia 250 MW CCGT Page 1 of 9

Vdr n. 27/12

Supply schedule

Return Status Code by Renco SPA

The document is:

Code A Accepted Without Comments


Code AC Accepted With Comments
Code R Rejected
Approval and/or compliance with comments does not relieve
supplier/subcontractor from responsibility for the correctness of his work or of any
requirements, warranties stated in the order.

Signed by Renco SPA:

Name:

REVISION DESCRIPTION SHEET

REV. N. REVISION DESCRIPTION

00 Issued for Information 21.02.2020 O.Babayan V.Yenokyan V.Hayrapetyan


Rev. Description Date Prepared Checked. Approv.

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 2 of 9

0 Issued for Information

HOLD RECORD

Pos. Sheet Paragraph Description

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 3 of 9

CONTENTS

1 INTRODUCTION....................................................................................................................................... 4
1.1 Definitions......................................................................................................................................... 4
1.2 Site Location..................................................................................................................................... 6
1.3 The Project........................................................................................................................................ 6
1.4 References....................................................................................................................................... 6
2 Scope........................................................................................................................................................ 7

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 4 of 9

1 INTRODUCTION

Ministry of Energy (MOE) of Republic of Armenia has planned, inside a wider program of develop of
production of Energy in the Country, to improve the total efficiency of the existing power plant by replacing
the older and lower efficient power units with the most modern steam gas combined cycle power generation
technology.
To partially reduce the gap between the offer and demand of electric Energy foreseen in the Republic of
Armenia for the next years, the MOE has signed for the construction of a new 250 MW (nominal) combined
cycle type power plant, gas fired, to be built on the clean and empty field adjacent to the existing YCCPP-1,
in the vicinity of Yerevan city.

1.1 DEFINITIONS
For the purpose of this specification the following definition shall apply:
 PROJECT YCCPP2 : 250 MW COMBINED CYCLE POWER PLANT
 COMPANY ARMPOWER CJSC, a company incorporated under the Armenian
Law
 CONTRACTOR Renco SPA
 Contract Contract agreement entered between Company and EPC
Contractor for the execution of the Work
 Work The detail design, procurement, manufacturing and transportation,
installation, construction, pre-commissioning, commissioning, start-
up and performance test of YCCPP2, inclusive of any other activity
and service required to achieve the operation of the Project.
 EPC Engineering, Procurement and Construction activities, nominally all
the necessary activities to execute and complete the Work with
best quality and following all HSE contractual requirement
 Site means the lands, waters and other places on, under, in or through
which the Works are to be performed
 Best Quality Designed or purchased to meet contractual requirements
 Supply: Equipment, material and/or services included in the Work.
 Supplier: Party which supplies equipment, material and/or services of the
Work, according to the documents specified by Company.
 Shall: Use of the word “shall” implies a mandatory requirement, which
can be relaxed only with the written confirmation by Company.
 Should: The use of the word “should” implies a recommendation based
upon the judgment of experienced people within the Company

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 5 of 9

organization, but recognizes that some discretion may be


appropriate.

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 6 of 9

1.2 SITE LOCATION

The new 250MW Yerevan Combined Cycle Power Plant (“YCCPP2”) will be located in the vicinity of Yerevan
city, in the area adjacent (on the west side lot) to the existing Yerevan CCPP-1, currently managed by the
Yerevan TPP CJSC.

1.3 THE PROJECT

The YCCPP2 Project consists of a nominal 250MW power output power plant, combined cycle as per latest
state-of-the art, located in the vicinities of the existing power plant sharing some of the utilities and facilities
necessary for its operation. The power output will be assured by a single gas turbine driven electric
generator train, which flue gas will be used to produce high pressure stem for additional power recovery
through a steam turbine driven electric generator. The Project will be designed for more efficient operation
and for higher reliability and availability.

1.4 REFERENCES
COMPANY Specifications
ID REFERENCE TITLE
[1]
[2]

CONTRACTOR Specifications
ID REFERENCE TITLE
[1]
[2]

Codes and Standards


ID REFERENCE TITLE
Series of standards related to joining of thermoplastic
[1] DVS2207
materials
[2]

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 7 of 9

2 SCOPE

Scope of this document is to describe the process of PE pipes


welding.

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 8 of 9

Joining Methods of PE Pipes


Etectrofusion Welding
E[ectrofusion welding process of polyethylene pipes are carried out
pursuant to internationaI standard such as DVS 2207. Welding is
carried out with heating resistors at the muff section in electrofusion
welding method. After placing the pipes into the muff, ends of the
welding machine are connected to the heating element ends of the
Coupler inside the hole and heating elements are heated by
current.
Since wall thickness of the Coupler is thicker than the wall thickness
of the pipe, temperature of the pipe wall is higher than the
temperature of Coupler wall, Pressure is generated inside the pipe
due to this temperature difference. Fusion is reaLized with the
pressure on the pipe and pressure generated in the pipe.
Eiectrofusion welding machines used for welding process are Light
and they also ensure welding with variable welding parameters or
usage of information documents of the Performed welds.

. Pipes made of same rawmaterial can be weIded in electrofusion


welding process.
. Melting ftowrate is at the range of 0.2-1.ag110 min. ['190"C/5 kg)
for HDPE-etectrofusion welding. Melting ftowrate of pipes and
couplers to be welded shall be between these values. Pipes with
identical melting flowrate can be welded.
. Welding area shall be protected against adverse weather
condtttons( for instance: Snow, rain, wind and strong sun rays etc)
. Temperature of the welding environment shall be between 5°C
and 50°C.
. Electrofusion welding machines generally bear barcode scanners
and etectrofusion fiitings contain barcodes which indicate welding
parameters. Welding parameters are loaded to the machine through
the barcode and welding parameters inscribed on the fitting can

8001-00001001-GS-148001-00-IFI-20200221-EN
Cpy n.: 8001-00001001-PP-148001 Cls 2
Ctr n.: 8001-01181921-PP-148001 Rev 00
Page 9 of 9

be loaded manualty to the welding machine for welding.

Welding Parameters
Latest welding machines have barcode Scanners attached to them.
Welding parameters of EF fitting to be welded are inscribed as a
barcode or attached on the Coupler or contained in the package.

Optimal Welding times of HDPE Pipes under 20° C Ambient


Temperature

Pipe wall thicknes Welding pressure Heating time Heating ironer Pipe welding
(mm) 0.15N/mm2 Removal time Removal time pressure working
Bead up height(mm) (Sec) (sec) Time(Sec)

…4.5 0.5 45 …5 …5
4.5…7 1.0 45…70 5…6 5…6
7…12 1.5 70…120 6…8 6…8
12…19 2.0 120…190 8…10 8…11
19…26 2.5 190…260 10…12 11…14
26…37 3.0 260…370 12…16 14…19
37…50 3.5 370…500 16…20 19…25
50…70 4.0 500…700 20…25 25…35