Вы находитесь на странице: 1из 27

Republic of the Philippines

Department of Environment and Natural Resources


NATIONAL CAPITAL REGION

VSR Prepartion and Approval


DENR Standards and
Procedures

Prepared by: ENGR. IGNACIO R. ALMIRA JR., CESE


The Role of the DENR

DENR shall pursue as a priority, the


unification, synchronization and
regulation of all surveys on, but not
limited to, agricultural lands, mineral
lands, forestlands, protected areas, civil
and military reservations, road networks
and lands for other purposes and
expedite the conduct, verification and
approval of surveys thereon.
LEGAL BASES

o The Revised Regulations on Land


Surveys
DAO 2007-29
July 31, 2007
o The Manual on Land Survey
Procedures
DMC 2010-13
June 23,2010
o Other Related Policies/
Amendments
DLSD policy:
DENR Admin. Order No. 2016-01
dated Jan 22, 2016
Adoption of Digital Land
Departm Rep

Survey Data (DLSD) ent of E ublic of the Phili


n
Visaya vironment
Tel Nos s Avenue, D and Natural
. (632) 92
929-66-2
ilim
9-66-26 an, Quezon C
0 · 929-
929-70-4
to 29 · (6
66 -3 3 to
ppines

32) 929-
Resourc
ity
62 -52
es

LAND M 1 to 43 35
E

Lodgment as a Standard NO.-____ MORANDUM


________

SUBJEC
______

T
CIRCUL

:
AR

Adoption
standard of Digital Land

Format for the Con


recogniz sistent with R
data in format for the urvey Data (DL
di
ent Syste
m (LAM
su
S
Managem gital form un bmission and ex D) Lodgment as
der the
S)
S
ch
Land A ange of surv
dministr
ation an
ey
a

in ep d
building g the vital role ublic Act 8792

submission and exchange Regiona


Circular
is
an
enforcin d pursuant to
g the us
e
specifical
Departm hereby issued in on Section 6
en
ly
se
th
of inform

ware in
pa
“The E
e object ion and comm ctronic Comm
at

en t
le
l Offices of LAMS applic ives of Departm unications tech erce Act of
ation soft Adm nology
(IC
the Land inistrative Ord T) in nation
M er N
2000”

harmoniz t with the use of tting the digital ragraph 3 of the anagement Burea o. 2010-18

of Survey Data in Digital


e fo u
integratio and facilitate th the e-Survey Pl rmat for sharing said Order, this (LMB) and
n of the an M
different e data exchange program unde land information emorandum
land info w ithin th r th e LAMS th ro ughout th
rmation
systems. e DENR and . This e
other stak will also help
eholders
in the
Sec
Office, L tion 1. Objectiv

Form under the Land MB and

1. Provi

2. Impr
sion of a

ovement
es
all Regio The use of DL
nal Offic

uniform
es throug

format in
SD aims

the subm
to
h the adop improve the se
tion of th

ission of
rvic
e follow es of DENR C
ing: entral
Survey pl in the Survey da

Administration and an applic turnaround time ta as inpu


ations. particular t to LAM
ly in the S.
3. Estab submissi
lishment on and pr
agencies of a ocessing
requiring standard format of
land info fo
4. Pre-r rmation. r use in data ex
equisite change w
ith other
Inspectio as interim phas

Management System
governm
n, e ent
module of Verification an towards paperl
LAMS P d Appro ess subm
hilippines val of S ission of
ur veys (IV S
.(See Ann
ex B) AS) usin urvey application
Sec g the web fo
and all R tion 2. Scope T applicatio r
egional O his Order n
from LM ffices us

(LAMS)
covers th
B in e
as well as /DENR Regiona g LAMS. This w use of DLSD th
other stak lO ould roug
eholders ffices that can be provide standa h the e-Survey
. shared to rd di Plan
national gital data exchan in LMB
and loca
Section l govern ge format
3. Defin m ent office
ition of T s
erms
a. Digit
al Lodgm
manual da ent –
ta-entry submission of da
and to re
duce the tasets in digital
use of pa fo
per form rm to eliminate
s. the
Claimant CENRO Regional
Office
Request of Survey Field Investigation
Authority Acceptance/Init
ial Verification
Investigation
Report
No O Yes
K
No O
Geodetic K Verification
Yes
Engineer and Approval

Issuance of S.A.
No O Yes
Survey of the Land K
Acceptance of SR
Filing of the
Submittal of Release of Original
Survey Returns Endorsement by
Duplicate Approved
CENRO to RO Copy Plan
Regional
Geodetic Office
Engineer
Acceptance/Init
Survey of the Land ial Verification

Submittal of Survey
No O Yes
Returns
K

Verification
and Approval

No O Yes
K

Release of Filing of the


Duplicate Original
Copy Approved
Plan
MANUAL IVAS
Projecti
Receiving Preliminary Verifica on Initial of Recommen
ding Approval Reco
Releasing Verification tion Chief,
Unit head OSS Approval
Projection CSD
Drafting

Final Verification

LAMS PHILIPPINES IVAS


Front Records
Desk Verification Initial of Recommending Approval
Verificati
Chief, OSS Approval
•Receiving on •
• Releasing •Encoding
•Uploading
of Projection
• Approval by Approval
of DLSD
Assignment of Reference Chief of by
Transaction
Lot Surveys ARDTS
Number Unit Head
Projection
Division

KIOSK
• Inquiry Drafting

•Uploading
of DLSD
Final Verification
by GE
LAMS IVAS
FEATURES
1. Implementation of the First-in
First-out (FIFO) within LAMS
Philippines IVAS
2. Digital Cadastral
Database (DCDB) Cleansing
• The DCDB is a database of land records
containing textual, scanned documents,
maps, and spatial data created and stored
within LAMS Philippines.
• It provides the basic and authoritative
layers of cadastre information with all
parcels and political boundary information
covering a municipality, city, or any
political unit.
• It also covers and provides land transaction
information and the recording of any
property rights and information. The
DCDB also creates different thematic
layers on land uses, land tenure status, and
other themes used for better land
management, planning and decision
making.
3. E-surveyPlan as medium to online
digital submission of survey returns (for
paperless verification) and online access
to land records and information
e-
– DAO
2016-01 SurveyP
lan

TEXT FILE
An XML file LAMS
(DLSD)
Philippine
s IVAS
GIS/CA
D
applicati
database stores up to this number of
characters. “Unlimited” means no maximum
length constraint for the
element value.

The paragraph that describes the data value


Data Value Constraint constraint for the element.
Maximum times a set of elements may be

on
Max Occur repeated. The maximum
occurrence is 1, if not specified.

DATA Type Constraints

Each entry in the data type column of the tables will be one of these values

Data
Type Constraints
boolean Indicate a “true” value with either a “1” or the word “true.”
Indicate a “false” value with either a “0” or the word “false.”
A Boolean element may not have a null or blank value.
Must be of the format YYYY-MM-DD. A date element may not have a null or blank
date value.
Only valid characters are 0-9. Cannot contain commas, a minus sign, a dollar sign, or
integer
parentheses.
string Should be no longer than the prescribed length

Data Model and Relationships

The elements of the XML file are classified and grouped according to the
following table definitions.

• Header
• Survey
• ResultantLot
• ResultantLotDetail
• MotherLot
• MotherLotDetail
• Boundary
• BoundaryDetail
• AdjacentParcel
• Label

Every element or field is classified according to the Data Type, Optionality, Description and
Index information relating to other table in the dataset. Where tables are related, the fields
are referred by the FK (Foreign Key) of the related table to the PK (Primary Key) of the
main table.

As discussed above, a single DLSD file may contain multiple Survey and Parcel definitions.
Codes for Region, Province, Municipality, and Barangay follow the coding standard set by
the Philippine Standard Geographic Code http://www.nscb.gov.ph/activestats/psgc/.
E-SURVEY LICENSE
Determine the credentials used to authenticate the
user. Authentication comes in the form of License
Certificates.
- License certificates are
files generated by
LAMS. They contain the
information on the
identity of the geodetic
engineer as well as the
connection information
to the regional LMS
offices. Digital
signatures are also
embedded in the file.
GE Information
database
Preliminary Verification
4. SMS (text messaging) and online
status verification of land
transactions
5. Online LAMS Monitoring
IVAS Gis Functions

Thru the use of


Gaps and Manifold
overlaps are Runtime, Lams is
automatically able to
determined to
check the automatically
correctness of determine the
the submitted relative location
surveys. The
figure shows the of the parcel on
gap when the a properly
new lots are
projected on the georeferenced
Lams can automatically
motherlot by map image
determine the adjacent lots and
simply clicking
on the Gap project the relative position of
button. the parcel on the map
Report generation
Examples of Isolated Surveys ( DENR-NCR )

Kind of Survey Survey Symbol


Private Land Surveys Psd, Pcn, Pcs, Rs, Rel
Public Land Subdivision Pls

Survey of Public Lands Ap, As, Ccs, Ccn, Csd,

Amendment Surveys Survey symbol (Amd)


Government Land Surveys Fls

Conversion Survey Cvn


Requirements for Isolated Surveys (Titled Properties)
• PSD, PCS, PCN
– Survey envelope
– Survey verification fee payment
– Transmittal letter of survey return
– Original drafting-film plan and blueprint copy
– Lot data computation
– Traverse computation
– Reference computation
– Boundary computation
– Field notes cover with cover duly notarized
– Field notes inside
– Documentary stamp on field notes
– Certified Xerox copy of title by ROD
– Print copy of LRA approved plan
– Supporting documents
– Conformity of the owner / co-owner on plan
• RS
– Survey envelope
– Survey verification fee payment
– Transmittal letter of survey return
– Improvements (lat/long) etc.
– Original drafting-film plan and blueprint copy
– Lot data computation
– Traverse computation
– Reference computation
– Field notes with cover duly notarized
– Survey notification letter
– Documentary stamp on field notes
– GE certificate duly notarized
– Print copy of previous approved plan
– GE narrative report duly notarized
• REL
– Survey envelope
– Survey verification fee payment
– Transmittal letter of survey return
– Original drafting-film plan and blueprint copy
– Lot data computation
– Traverse computation
– Reference computation
– Boundary computation
– Field notes with cover duly notarized
– Survey notification letter
– Documentary stamp on field notes
– GE certificate duly notarized
– Certified extracts of computation
– Print copy of previous approved plan
– GE narrative report duly notarized
Requirements for Original / Untitled / Undeeded Surveys
• CSD, CCS, CCN
– Survey envelope
– Survey verification fee payment
– Transmittal letter of survey return
– Original drafting-film plan and blueprint copy
– Copy of latest tax declaration
– Lot data computation
– Traverse computation
– Reference computation
– Boundary computation
– Field notes over with cover duly notarized
– Documentary stamp on field notes
– Survey authority w/ copy of inspection report from LMD
– LRA certification that the lot is not or has not been subject of a land
registration case
– Payment of cadastral survey cost if cad lot and proportional survey cost for
PLS if needed
– Supporting documents (waiver of rights if not listed claimant)
– Conformity of the owner on plan
Requirements for Complex Subdivisions
• PSD & PCS
– Survey envelope
– Survey verification fee payment
– Transmittal letter of survey return
– Original drafting-film plan and blueprint copy
– Copy of latest tax declaration
– Lot data computation
– Traverse computation
– Reference computation (certified)
– Boundary computation (certified if untitled)
– Astronomical computation
– Field notes duly notarized with documentary stamps on field notes
– Settings computation
– GE certificate duly notarized
– Certified cerox copy of title of ROD
– HLURB/LGU approval of subdivision plan scheme
– Print copy of previous approved plan
– PPA clearance certification when area surveyed is adjacent to sea/ocean
– (includes all original surveys adjacent to sea/ocean)
– Approved scheme of subdivision by LGU/HLURB
– Conformity of the owner/co-owner on plan
I. FRONT DESK
a. Compleness of the
Survey Returns

II. Verification
a. Boundary Computation
b. Lot Data Computations
c. Reference Computations

III. Projection
IV. Initial of Unit Head of
Projection Unit
V. Drafting
1. Standard Format Illustration:
2. Conventional Survey
Signs and Symbols
Psd-03-000141(Amd)

3. Signing Authorities where:

4. G.E. Information Psd - survey symbol


5. Standard Scale 03 - regional code
6. Standard Notations 000141 - serial or control

7. Standard Numbering number of survey based on


Registry Book
of Survey Plan for Amd - subdivision survey was
Isolated Surveys amended.
VI. Final Verification
a. Final Check of Documents

VII. Initial of the Section Chief, Original and Other


Surveys Section

VIII. Recommending Approval by the Chief of Surveys


and Mapping Division

IX. Approval of Assistant Regional Director for


Technical Services

X. Draftsman
a. Inscription of Survey Symbol and Number

XI. Front Desk


a. Releasing of Sepia
THANK YOU !

Вам также может понравиться