DTSS Phase 2 Project | July 2016
2
DTSS Phase 2 Project | July 2016
Scrubber tower
(height ≈ 30 metres)
100% = Emission limits in ‘EU Directive 2010/75/EC’
Acidic gases
IWMF Performance
neutralised in wet
scrubbers before
safe discharge
8
DTSS Phase 2 Project | July 2016
9
DTSS Phase 2 Project | July 2016
reduce land-take
Technology based on advanced automatic systems to sort
metals, paper, cardboard and plastics
2 units x 125 t/d (equipped with trommels, magnetic
separators, eddy current, near-infrared (NIR) etc. )
10
DTSS Phase 2 Project | July 2016
WRP
Goal: To recover more energy from food waste via co-
digestion with used water sludge
Well-proven technology based on screw press High quality
bio-pulp
2 units x 200 t/d based on screw-press technology
11
DTSS Phase 2 Project | July 2016
12
DTSS Phase 2 Project | July 2016
13
CO-LOCATION
SYNERGIES
DTSS Phase 2 Project | July 2016
Dewatered
Recyclables Domestic Industrial
Waste-To- Sludge
sludge Anaerobic Thermal Sludge
Liquid Liquid
hydrolysis
Clean Air Energy Incineration co-digestion Treatment Treatment
Emissions
plant
Module Module
Treated effluents
Bottom Ash Wet Flue Gas External Biogas
NEWater Industrial
Treatment Treatment Superheater
Plant Water Plant
Synergy Case
Food Waste Rejects
Food Waste Incineration
Treatment
Bio-pulp Pre-drying
Biogas
16
DTSS Phase 2 Project | July 2016
17
DTSS Phase 2 Project | July 2016
Base Case
Synergy Case
IWMF Turbine- Electricity export
generator Power Grid
Electricity
Supply
Tuas WRP
18
DTSS Phase 2 Project | July 2016
19
DTSS Phase 2 Project | July 2016
Base Case
Synergy Case
Fluidised Steam to
Pre-drying Bed Turbine-generator
Incineration
Tuas WRP
Dewatered
Sludge
20
DTSS Phase 2 Project | July 2016
21
DTSS Phase 2 Project | July 2016
Thickened Fluidised
Sludge THP Digester Dewatering
Bed Incineration
Biogas
Biogas Engines Electricity
Heat
Synergy Case
Electricity
Fluidised
IWMF Turbine Bed Incineration
Steam
Bleed
Biogas superheater Drying
Biogas
Thickened
Sludge THP Digester Dewatering
22
DTSS Phase 2 Project | July 2016
23
DTSS Phase 2 Project | July 2016
• Food waste
• Grit
• Power supply
• Biogas
• Steam supply
• Water supply
• Sludge drier
condensate • Odour Air
• COST EFFECTIVE
25 In association with
CONTRACT PACKAGING
&
IMPLEMENTATION TIMELINE
DTSS Phase 2 Project | July 2016
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Link Sewers
Consultant Detailed Construction
DEEP TUNNEL SEWERAGE SYSTEM
Tender Design
Tunnels
D&B Tender Design & Construction
Tuas WRP
Consultant Detailed Construction
Tender Design
IWMF
Pre-Q, Pre-Q, EPC Design & Construction
Owner’s Contractor(s)
Engineer & call EPC
(OE) & call Tender(s)
OE Tender
27
DTSS Phase 2 Project | July 2016
CONTACT DETAILS
DTSS Phase 2 Project
Mr Yong Wei Hin Director yong_wei_hin@pub.gov.sg
Mr Herman Ching Deputy Director herman_ching@pub.gov.sg
Mr Geoff Piggott Project Director (B&V+AECOM JV) geoff.piggott@bvaecom.com
DEEP TUNNEL SEWERAGE SYSTEM
28 In association with