Hydraulic Mining Shovels

Cat® 6060 FS

05. Attachment Functions FS

Dixio Torrez - 2016


RH Joystick Service Training

RH Joystick

Boom Down
(Float)
Horn Boom
(Power)
Down

Bucket Curl Bucket Curl


Close Open

Boom Up

2
LH Joystick Service Training

LH Joystick

Stick
Out
Stick In Spare
(Power)

Swing Swing
Left Right

Stick in
(Float)

3
Pedals Service Training

4
Main Pump Assembly Service Training

P8

P7
P6
P5

P4

P3
P2

P1

5
Filter Block Assembly Service Training

P 1/7
P 2/8
P 3/5

P 4/6

6
Travel Supply: P1/P7 and P2/P8 (P3/5 and P4/6 Attachment) Service Training

Tank return lines P3/P5 – direct routing to attachment

Tank return lines

P4/P6- direct routing to attachment

P1/P7- routing to travel function (RH)

P2/P8 - routing to travel function (LH)

7
Service Training
Travel Supply: P1/P7 and P2/P8 (P3/5 and P4/6 Attachment)
Main Pump supply
P1/7
To Attachment P3/5
Control -RH- To
only if Toggle Attachment
Valve -2Y46 Control -RH-
switched
to –X- position

Travel
Valve RH

Travel
Valve LH

P2/8
P4/6
To Attachment
To
Control -LH-
Attachment
only if Toggle
Control -LH-
Valve -2Y46
switched to
-X- position

Main Pump supply


8
Rotary Joint and Main Valves (side views) Service Training

*The High pressure routing from Pump 3/5 and 4/6 leads direct to the attachment functions

*The High pressure routing from Pump 1/7 and 2/8 leads direct via Rotary Joint to the travel functions

9
Main Valves on FS Attachment Service Training

P3/P5

P1/P7

P4/P6

P2/P8 Clam

10
Main Valves on FS Attachment Service Training

11
Main Control Valves (Triple – Spool Valve) Service Training

Secondary- and
Anti Cavitation
Valves

Main
Valve
Spool

Load
Check
Valves

12
Secondary Relief Valves with Anti Cavitation Function Service Training

Valve short before opening Valve open due to high pressure Anti cavitation function

13
Attachment Main Valves Service Training

14
Functions – Proportional Valve Banks - Attachment
FS-Version Service Training

-2Y36 Valveblock Pre Heating


-2Y1 Bucket Cylinder in(Bucket fill)
-2Y5 Boom Cylinder out (Boom up)

-2Y36

-2Y10
-2Y8 Stick Cylinder out (Stick out)

-2Y1
-2Y5
-2Y8
-2Y10 Clam Cylinder out (Clam close)

Tank Return

Tank Return
-2Y37 Valveblock Pre Heating
Stick Float Valve Tank Return (no electrical signal)
-2Y37 -2Y7 Stick Cylinder in- Float (Stick float)

-2Y7
-2Y4
-2Y4 Boom Cylinder in- Float (Boom float)
Boom Float Valve Tank Return (no electrical signal)

-2Y38 Valveblock Pre Heating


-2Y6 Stick Cylinder In (Stick power in)
-2Y38
-2Y6
-2Y3
-2Y2
-2Y9
-2Y3 Boom Cylinder in (Boom power down)
-2Y2 Bucket Cylinder out (Bucket fill)
-2Y9 Clam Cylinder in (Clam open)

Tank 35 bar

15
Proportional Valve Banks – Installation Service Training

P - 35 bar

16
Proportional Valve Banks – Routing Servo-Control Hoses Service Training

17
Main Valves – Front View with Servo-Control Hoses Service Training

18
Condition: Boom Up Service Training

19
Condition: Boom Down (Floating) Service Training

Stick

Bucket

Boom

Tank

35 bar Servo

20
Condition: Boom Down (Floating) Service Training

35b

21
Condition: Boom Down (Floating) Service Training

22
Condition: Boom Power Down Service Training

23
Condition: Close Clam Service Training

24
Condition: Open Clam Service Training

25
Condition: Open Clam Service Training

26
Clam Valve and Secondary's plus Safety Valve Service Training

P2/P8 to Main Valbe Block 161 / 2

P2/P8

27