Report No 006

Date 09/02/2011 Depth 2,087 ft


Spud Date Rig Activity
Daily Drilling Fluid Report 08/28/2011 POOH DP 5" @ 669 ft
Operator Report For Well Name
CEPCOLSA LENIS CERON BAQUIANO 1
Contractor Report For Rig Name Unit System
PARKER JAIME CAMACHO 121 API pre-defined system
Country State/Province/Region Geographic Area/County Field or Block
Colombia Casanare Llanos Orientales Los Ocarros
Bit Information Drill String ( in) / (ft) in Casing ft Circulation/Hydraulics Data
Bit Size in OD ID Length OD Set MD Model PZ-10 PZ-10 PZ-10
Make/Type 13.375 @ 2,082 Bore in 6.000 6.000 6.000
Jets Strokes in 10.000 10.000 10.000
TFA sq-in Eff(%) 95 95 95
Jets Velocity ft/sec bbl/strk 0.083 0.083 0.083
Jet Impact Force lbf SPM 0 0 0
Bit HHSI hhp/in2 gpm|bbl/min
Press Drop @ Bit psi Total GPM AV, Riser Circ Press psi
Bit Depth ft Open Hole 18.500 5 Total Circ Time AV min DP Tot Pres Loss
ECD @ Csg Shoe ppg BU Time , min AV max DC Press Drop DP
ECD @ Bit ppg Total Strokes BU Strokes Press Drop An
Properties 1 2 3 4 Targets Program Fluid Treatments
Source Succion Succion Fluid Type AQUAGEL Mud
Time 5:00 15:00 Durante corrida de revestimiento chequeo
Depth ft 2,087 2,087 volumen desplazado: ok. Lodo en optimas
FL Temp Deg F condiciones previo a trabajo de cementacion. Se
Density @ Deg F ppg 9.00 @ 100 9.00 @ 120 8.30 10.00
recomienda disponer de dos frac tank
FV @ Deg F sec/qt 43 @ 120 42 @ 120 35 60
PV @ Deg F cP 10 @ 120 10 @ 120 5 20 adicionales para disponer de mayor capacidad
YP lbs/100 ft2 12 12 10 25 de almacenamiento de lodo en superficie debido
GELS lbs/100 ft2 4/6/7 4/6/7 a la limitada capacidad de los tanques de
600/300 32.0/22.0 32.0/22.0 reserva del taladro. Envio a dewatering 485 bbl
200/100 17.0/12.0 17.0/12.0 de lodo.---------------------------------------- Bajo csg
6/3 5.0/4.0 5.0/4.0 13 3/8" (1893' - 2072'). @ 2072' se disparo la
API Filt ml/30 min
presion de 300 hasta 3000 psi afectando stand
HTHP @ Deg F ml/30 min
Cake API/HTHP 32nd in pipe. Reciproco sarta mientras reparo satnd
Corr Solid % by Vol 5.0 5.0 pipe. Trabajo sarta @ 2058' circulando.
NAP/Water % by Vol -/94.8 -/94.8
Sand % by vol 0.50 0.50 Rig Activity
MBT ppb Eq. 20.0 Bajo csg (2072' - 2082'). Asento shoe. Circulo a
pH @ Deg F 8.80 @ 90 8.65 @ 90 limpios. Rig down htas running csg. Acondiciono
ALK Mud Pm 0.30 0.30 mesa para bajar stinger con dp 5". Baj'o stinger
ALK Filt Pf/Mf 0.80/2.50 0.80/2.50
con dp 5". Rig up htas cementacion. Reunion
Chlorides mg/l 200 200
Tot. Hardness mg/l 45 40 preopercional. Probo lineas 2". Realizo
LGS/HGS % by Vol 4.9/0.1 4.9/0.1 cementacion bombeando: 30 bbl espaciador,
LGS/HGS ppb 44.25/1.54 44.25/1.54 487 bbl bbl de lechada 13.6 ppg, 220 bbl
ASG SG 2.634 2.634 lechada 15.8 ppg, 30 bbl agua. No retorno
cemento a sfcie. POOH dp 5". @ 1874' encendio
bombas y observo desbalance de la columna.
Additional Properties
Bajo gpm sin exito. Apago bomba. Encendio
n (HB) - 0.661 0.661
K (HB) lb*s^n/100ft2 0.305 0.305 bomba nuevamente. Circulo a diferentes gpm
Tau 0 lbs/100 ft2 3.46 3.46 sin exito. Apago bomba. Observo columna
estable. Continuo sacando dp 5" (1874' - 669').
Product Name Units Start Rec Used End Cost Solids Control Equipment Time
Drilling Fluids Engineer day(s) 2 $1,692.90 Shaker Screens Hrs Drilling
AKTAFLO-S 55 gal drum 4 4 FLC 2000 3-P 70 70 70 10.0 Circulating 1.5
aluminum stearate 20 kg bag 6 6 FLC 2000 3-P 70 70 70 10.0 Trips
AQUAGEL 50 lb bag 360 360 FLC 2000 3-P 70 70 70 10.0 Rig
BARACARB DF 150 110 lb bag 40 40 Surveys
BARACARB DF 600 (10-40) 110 lb bag 40 40 Fishing
BARAZAN D PLUS 55 lb bag 80 80 Run Casing 11.5
barite 100 lb bag 1,722 1,722 Coring
BAROFIBRE 25 lb bag 100 100 Reaming
BAROFIBRE COARSE 40 lb bag 60 60 Hydrocyclone Cones Screens Hrs Testing
bicarbonate of soda 55 lb bag 20 20 Derrick Mud Cleaner 20 4 140 140 140 Logging
Black Magic SFT 55 lb bag 40 40 Derrick Degasser 00 Dir Work
caustic soda 25 kg bag 40 40 Repair
Cesco CG 50 lb bag 250 250 Other 11.0
CLAY GRABBER 5 gal can 64 64 Centrifuge Speed Feed Rate Hrs Total 24.0
CLAYSEAL PLUS 55 gal can 25 25 Sharples 5400 2,200 80.00 Rotating
Glutaraldehido 5 gal can 21 21 SHARPLES/ 3400 2,560 150.00 ROP
Kwikseal Coarse 40 lb bag 50 50 Dil Rate 0.00
Kwikseal Medium 40 lb bag 50 50 Fluid Volume Breakdown AQUAGEL Mud
lime 55 lb bag 44 44 Active bbl Additions bbl Losses bbl
PAC - L 50 lb bag 80 80 Annulus Base Fluid Dumped
PAC R. 50 lb bag 80 80 Pipe Cap Drill Water Transferred
THERMA-THIN 5 gal can 32 32 Active Pits 1048.5 Dewatering SCE
WALL-NUT 50 lb bag 96 96 Total Hole 336.9 Sea Water Evaporation
Total Circ 1048.5 Whole Mud 55.0 Trips
Reserve 374.5 Barite Other
Prev Vol 1347.9 Chemicals Total Surface
Net Change 55.0 Other Downhole
Total Vol 1759.9 Total 55.0 Total Losses
Fluid Types Vol bbl Deviation Information
Daily Products Cost $0.00 Total Daily Cost $1,692.90 Survey MD ft
Cumulative Products Cost $6,389.96 Total Cumulative Cost $25,011.86 Survey TVD ft
Baroid Representatives LABRADOR GABRIEL Edwin Villalba Angle Deg
Office Cra 7 # 71-52 Torre B Piso 7 Telephone 57-1-3264000 Direction
Warehouse 3000 N Sam Houston Pkwy E Telephone 1-866-803-6593 Horiz Displ. ft
This report, the software, any data contained in this report and any interpretations based on this report are offered “AS-IS” and ”WHERE-IS.” THERE ARE NO REPRESENTATIONS OR WARRANTIES, EXPRESSED OR INMPLIED, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND/OR FITNESS AND/OR FITNESS
FOR A PARTICULAR PURPOSE AND OR NON-INFRINGEMENT. IN NO EVENT WILL HALLIBURTON OR ITS AFFILIATES OR SUPPIERS BE LIABLE FOR ANY DAMAGES, WHATSOEVER, INCLUDING, BUT NOT LIMITED TO DIRECT, INDIRECT, CONSEQUENTIAL, INCIDENTAL, SPECIAL, PUNITIVE OR EXEMPLARY
DAMAGES (INCLUDING, WITHOUT LIMITATION, LOSS OF DATA, PROFITS OR USE OF HARDWARE OR SOFTWARE). Customer uses at their own risk.

Вам также может понравиться