Академический Документы
Профессиональный Документы
Культура Документы
[65/VI S/115]
OR [April-15]
6. Estimate the following quantities of the following items of the [AURAR-601]
Annexure-I B. Architecture Degree Examination
a) Brick work in Super Structure 4
b) Plastering 20mm Thick 4
VI SEMESTER
c) Wood work for Door Frames 2 ESTIMATING, COSTING AND SPECIFICATIONS
(Effective from the admitted batch 2011–12)
UNIT-IV Time: 3 Hours Max.Marks: 50
7. Give detail specifications of Pile foundation with neat sketch 10 ----------------------------------------------------------------------------------------------------
Instructions: Each Unit carries 10 marks.
OR Answer all units choosing one question from each unit.
All parts of the unit must be answered in one place only.
8. Discuss in detail the analysis of rates with standard data book 10 Figures in the right hand margin indicate marks allotted.
UNIT-V ---------------------------------------------------------------------------------------------------
[65/VI S/115]