6. Estimate the following quantities of the following items of the [AURAR-601]


Annexure-I B. Architecture Degree Examination
a) Brick work in Super Structure 4
b) Plastering 20mm Thick 4
VI SEMESTER
c) Wood work for Door Frames 2 ESTIMATING, COSTING AND SPECIFICATIONS
(Effective from the admitted batch 2011–12)
UNIT-IV Time: 3 Hours Max.Marks: 50
7. Give detail specifications of Pile foundation with neat sketch 10 ----------------------------------------------------------------------------------------------------
Instructions: Each Unit carries 10 marks.
OR Answer all units choosing one question from each unit.
All parts of the unit must be answered in one place only.
8. Discuss in detail the analysis of rates with standard data book 10 Figures in the right hand margin indicate marks allotted.
UNIT-V ---------------------------------------------------------------------------------------------------

9. Discuss in detail the types of Contracts 10 UNIT-I

OR 1. a) Write about details of measurements and calculation of


quantities 7
10. Write the detail specifications of any two items of Super Structure 10 b) State the purpose of Estimation 3
OR
2. Discuss any five main items of quantities of general construction
work 10
UNIT-II
3. a) Write about different methods of approximate estimate 5
b) What is Bill of quantities and it’s significance? 5
OR
4. Discuss Measurement form and Abstract of estimate form in detail
and its differences 10
UNIT-III
5. Estimate the quantities of the following items of the drawing of
Day Care School
a) C.C. Bed of 1:2:4 for foundation 2
b) Brick work in 1st and 2nd footing 4
c) R.C.C. for slab and Lintels 4

[65/VI S/115]
OR [April-15]
6. Estimate the following quantities of the following items of the [AURAR-601]
Annexure-I B. Architecture Degree Examination
a) Brick work in Super Structure 4
b) Plastering 20mm Thick 4
VI SEMESTER
c) Wood work for Door Frames 2 ESTIMATING, COSTING AND SPECIFICATIONS
(Effective from the admitted batch 2011–12)
UNIT-IV Time: 3 Hours Max.Marks: 50
7. Give detail specifications of Pile foundation with neat sketch 10 ----------------------------------------------------------------------------------------------------
Instructions: Each Unit carries 10 marks.
OR Answer all units choosing one question from each unit.
All parts of the unit must be answered in one place only.
8. Discuss in detail the analysis of rates with standard data book 10 Figures in the right hand margin indicate marks allotted.
UNIT-V ---------------------------------------------------------------------------------------------------

9. Discuss in detail the types of Contracts 10 UNIT-I

OR 1. a) Write about details of measurements and calculation of


quantities 7
10. Write the detail specifications of any two items of Super Structure 10 b) State the purpose of Estimation 3
OR
2. Discuss any five main items of quantities of general construction
work 10
UNIT-II
3. a) Write about different methods of approximate estimate 5
b) What is Bill of quantities and it’s significance? 5
OR
4. Discuss Measurement form and Abstract of estimate form in detail
and its differences 10
UNIT-III
5. Estimate the quantities of the following items of the drawing of
Day Care School
a) C.C. Bed of 1:2:4 for foundation 2
b) Brick work in 1st and 2nd footing 4
c) R.C.C. for slab and Lintels 4

[65/VI S/115]