TATA PROJECTS LTD.

TPL-340077-83-GVSCCL-DES-03
precast panel on manifold(Designed as oneway slab)-Gravity Loads
Fy = 500 N/mm²
Fck = 30 N/mm² Lx = 0.600 m FOR M30 & FY 500
Clearcover 40 mm Scbc 10 N/mm²
Sst 130 N/mm²
Slab thickness = 125 Beam width 75 mm m 9.3
D.L.of slab = 3.13 k 0.42
water load= 38.00 j 0.86
Filling load= 35.80 dx= 80
Total 76.925 kN/m² dy= 70
Ast Required Ast Provided
Ast 10 mm 10
M=(W*Lx²/12)= 2.308 kN-m 150 476 c/c 100
Depth required 33.969 mm O.K 8 mm 8
Distribution steel=0.12*1000*d/100= 150 335 c/c 150

Check for deflection


fs = 55
Pt = 0.98 Modification factor = 2.00
d required = 15.0
d provided = 80.0 O.K

Precast Panel on manifold(Designed as oneway slab)-backwash Loads


Backwash water Pressure = 1.8 kg/cm2 Filling Load
Air pressure = 0.4 kg/cm2 anthracite 600 = 4.8 kN/m2
Total pressure upwards = 2.2 kg/cm2 sand 1000 = 22 kN/m2
220 kN/m2 pebbles 500 = 9 kN/m2
35.8 kN/m2
Fy = 500 N/mm²
Fck = 30 N/mm² Lx = 0.600 m FOR M30 & FY 500
Clearcover 40 mm Scbc 10 N/mm²
Sst 130 N/mm²
Slab thickness = 125 mm Beam width 75 mm m 9.3
D.L.of slab = 3.13 kN/m² k 0.42
filling load= 35.80 kN/m² dx= 80 j 0.86
Total net pressure 181.075 kN/m² dy= 70
Ast Required Ast Provided
6.52 kNm Ast 10 mm 10
M=(W*Lx²/12)= 5.432 kN-m 162 202 c/c 100
Depth required 10 52.116 mm O.K 8 mm 8

6*6*10^6 = 134.16 mm overall thk is reqd,


Distribution steel=0.12*1000*d/100= 150 335 c/c 150

Check for deflection 2 x 1000


fs = 60 so pls adopt 150 mm
Pt = 0.98 Modification factor = 2.00
d required = 15.0
d provided = 80.0 O.K