HOJA DE METRADO

OBRA: EDIFICIO XYZ


PROPIETARIO: UNIGEST CONSULTORES
FECHA: 5/4/2015
ELABORADO POR: L.L.P.V REVISADO POR:

ID DESCRIPCION UNIDAD N° DE VECES


01 TRABAJOS PRELIMINARES
01.01 LIMPIEZA DE TERRENO M2 1.00
01.02 TRAZO NIVELES Y REPLANTEO
01.02.01 TRAZO Y REPLANTEO DURANTE LA OBRA M2 1.00
02 ESTRUCTURAS
02.01 ELIMINACION DE OBSTRUCCIONES
02.01.01 EXCAVACION M3
CIMIENTOS
CC-1 EJE 1 y 2 2.00
CC-1 EJE A,B 2.00
02.01.02 RELLENO
02.01.02.01 RELLENO CON MATERIAL PROPIO M3
CIMIENTOS
CC-1 EJE 1 y 2 2.00
CC-1 EJE A,B 2.00
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 FACTOR DE ESPONJAMIENT
VOLUMEN DE EXCAVACION EN V.N. 1.00
VOLUMEN DE RELLENO CON MAT PROPIO 1.00

02.02 CONCRETO SIMPLE


02.02.01 CONCRETO CIMIENTO CORRIDO M3
CIMIENTOS
CC-1 EJE 1 y 2 2.00
CC-1 EJE A,B 2.00
02.02.02 SOBRECIMIENTO
02.02.02.01 ENCOFRADO PARA SOBRECIMIENTO M2
CC-1 EJE 1 y 2 4.00
CC-1 EJE A 2.00
CC-1 EJE B 2.00
CC-2 EJE B 2.00
TAPAS 8.00
TAPAS 2.00
02.02.02.02 CONCRETO SOBRECIMIENTOS M3
CC-1 EJE 1 y 2 2.00
CC-1 EJE A 1.00
CC-1 EJE B 1.00
CC-2 EJE B 1.00
04.02.03 CONCRETO FALSO PISOe=0.10m M3
AREA TOTAL (+) 1.00
F.J.L.A.

LARGO ANCHO ALTO PARCIAL TOTAL

3.05 1.95 5.95

3.05 1.95 5.95

3.20

1.95 0.50 0.80 1.56


2.05 0.50 0.80 1.64

0.56

1.95 0.35 0.20 0.27


2.05 0.35 0.20 0.29
FACTOR DE ESPONJAMIENTO 0.25 3.75
3.20 1.25 4.00
0.56 1.56 -0.88

2.40

1.95 0.50 0.60 1.17


2.05 0.50 0.60 1.23

7.67
1.30 0.50 2.60
2.40 0.50 2.40
1.70 0.50 1.70
0.70 0.20 0.28
0.15 0.50 0.60
0.15 0.30 0.09
0.52
1.30 0.15 0.50 0.20
2.40 0.15 0.50 0.18
1.70 0.15 0.50 0.13
0.70 0.15 0.20 0.02
0.31
1.30 2.40 0.10 0.31
METRADO CONCRETO ARMADO CONCRETO (m3) ENCOFRADO (m2
ID DESCRICION # VECES L A H PARCIAL CANT.

VA-3 EJE 1 /(C-H) 11.6 0.3 0.2 2


1

VA-3 EJE 1 /(C-H) 7.3 0.3 0.2 2


1

VA-3 EJE 9 /(G-H) 1.9 0.3 0.2 2


1

VP-101 EJE 9 /(G-H) 1.9 0.25 0.4 2


1
ENCOFRADO (m2) ACERO (Kg)
1/4" 1/2"
L A PARCIAL CANTIDAD LONGITUD DIAMETRO
0.250 0.994

11.6 0.2 4.64


5 0.25 0.83

7.3 0.2 2.92


7.3 0.25 1.615

1.85 0.2 0.74


1.85 0.25 0.4625

1.85 0.2 0.74


1.85 0.25 0.4625
3/8" 5/8" 3/4" PARCIAL
0.55 1.55 2.235
ID
03
03.01
03.01.01
04.03.02.01.01
04.03.02.01.02
04.03.02.01.03
03.02
04.03.02.02.01
04.03.02.02.02
04.03.02.02.03
DESCRIPCION UNIDAD
CONCRETO SIMPLE
COLUMNAS
COLUMNA RECTANGULAR
CONCRETO f'c=175kg/cm2 PARA COLUMNAS m3
ENCOFRADO PARA COLUMNAS RECTANGULARES m2
ACERO DE REFUERZO fy=4200kg/cm2 PARA COLUMNAS RECTANGULARES kg
VIGAS
CONCRETO f'c=175kg/cm2 PARA VIGAS m3
ENCOFRADO PARA VIGAS m2
ACERO DE REFUERZO fy=4200kg/cm2 PARA VIGAS kg
METRADO

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
ID DESCRIPCION UNIDAD N° DE VECES
01 ARQUITECTURA
01.01 MUROS Y TABIQUES DE ALBAÑILERIA
01.01.01 MUROS DE 0.15m DE ESPESOR, MORTERO e=1.5cm M2
EJE 1 y 2 2.00
PARTE DE FORMA TRIANGULAR 2.00
EJE A 1.00
EJE B 1.00
PUERTA (-) 1.00
VENTANA (-) 1.00
LARGO ANCHO ALTO PARCIAL TOTAL

12.80
1.30 1.75 4.55
0.26 0.52
2.40 2.15 5.16
2.40 1.75 4.20
1.95 0.70 -1.37
0.90 0.30 -0.27
ARQUITECTURA

ITEM DESCRIPCION
1.00 MUROS Y TABIQUERIA DE ALBAÑILERIA
1.01 muros kk soga 18 huecos 0.9x12.5x23.2 cm, 1:5, J=1,5cm
2.00 REVOQUES ENLUCIDOS Y MOLDURAS
2.01 tarrajeo interiores
2.02 tarrajeo columnas
2.03 tarrajeo vigas, 1:5 E=1.5