Shear wall Shaft

Reference ( E*,D)
Ground floor -- Fourth floor
shaft shaft shaft shaft TOTAL CENTER CENTER TL*X TL*Y
No. Length Width Height Weight LOAD MASS MASS
(m) (m) (m) (KN/m3) (KN) (X) (Y)

2.70 0.20 3.20 25.00 43.20 1.37 18.36 59.18 793.15


2.70 0.20 3.20 25.00 43.20 3.24 19.94 139.97 861.41
2.05 0.20 3.20 25.00 32.80 1.59 20.00 52.15 656.00
2.05 0.20 3.20 25.00 32.80 3.19 18.09 104.63 593.35

Deduct Shaft Door

1.20 0.20 2.10 -25.00 -12.60 3.19 18.09 -40.19 -227.93

TOTAL 139.40 315.74 2675.98

CENTER OF MASS = Sum( TL*X)


Total Load

X(bar) 315.74 = 2.27 m


139.40

Y(bar) 2675.98 = 19.20 m


139.40

Roof level
shaft shaft shaft shaft TOTAL CENTER CENTER TL*X TL*Y
No. Length Width Height Weight LOAD MASS MASS
(m) (m) (m) (KN/m3) (KN) (X) (Y)

2.70 0.20 1.50 25.00 20.25 1.37 18.36 27.74 371.79


2.70 0.20 1.50 25.00 20.25 3.24 19.94 65.61 403.79
2.05 0.20 1.50 25.00 15.38 1.59 20.00 24.45 307.50
2.05 0.20 1.50 25.00 15.38 3.19 18.09 49.05 278.13

TOTAL 71.25 166.85 1361.21

CENTER OF MASS = Sum( TL*X)


Total Load

X(bar) 166.85 = 2.34 m


71.25

Y(bar) 1361.21 = 19.10 m


71.25

Shaft cover at +17.50


shaft shaft shaft shaft TOTAL CENTER CENTER TL*X TL*Y
No. Length Width Height Weight LOAD MASS MASS
(m) (m) (m) (KN/m3) (KN) (X) (Y)

2.70 2.05 0.10 25.00 14.07 2.33 19.10 32.79 268.78

TOTAL 14.07 32.79 268.78

CENTER OF MASS = Sum( TL*X)


Total Load

X(bar) 32.79 = 2.33 m


14.07

Y(bar) 268.78 = 19.10 m


14.07
Seismic Analysis

CALCULATE SEISMIC BASE SHEAR

Fb =
Sd(T1)W [EBCS 8 - 2.3.3.2.2]

Sd(T1) = a b g [EBCS 8 - 1.4.2.2]


a = a oI [EBCS 8 - 1.4.2.2]
I = 1 [EBCS 8 - TABLE 2.4]
a o
= 0.05 [EBCS 8 - TABLE 1.1]

a = 0.05

b = 1.2S <= 2.5 [EBCS 8 - 1.4.2.2]


T2/3
S= 1.2 [EBCS 8 - TABLE 1.2]
T = C1H
3/4
[EBCS 8 - 2.3.3.2.2]
H= 13.5 m
C1 = 0.075

T = 0.53

b = 2.20 use 2.20

g = goKDKRKw <= 0.7 [EBCS 8 - 3.3.2.1]


go = 0.2
KD = 1.5
KR = 1
Kw = 1

g = 0.3 use 0.3

Sd(T1) = 0.033