Вы находитесь на странице: 1из 2

e-cigre Technical Brochures Downloads

November 2013
No. of
Ref SC WG Year Title downloads
566 C4 C4.605 2013 Modelling and Aggregation of Loads in Flexible Power Networks 100
567 B3 B3.25 2013 SF6 Analysis for AIS, GIS and MTS Condition Assessment 95
564 C1 C1.14 2013 Review of Transmission Planning Access Requirements 88
563 B4 B4.38 2013 Modelling and Simulation Studies to be performed during the lifecycle of HVDC 84
Systems
556 C4 C4.502 2013 Power System Technical Performance Issues Related to the Application of Long 76
HVAC Cables
565 C5 C5.10 2013 Regulatory Incentives for Capital Investments in Electricity Systems 67
553 B4 B4.47 2013 Special Aspects of AC Filter Design for HVDC Systems 63
559 B1 B1.23 2013 Impact of EMF on Current Ratings and Cable Systems 63
513 A3 A3.06 2013 Final Report of the 2004 - 2007 International Enquiry on Reliability of High 60
Voltage Equipment - Part 5 - Gas Insulated Switchgear
560 B1 B1.29 2013 Guideline to Maintaining the Integrity of XLPE Cable Accessories 58
Jan - Nov 2013
533 B4 B4.52 2013 HVDC Grid Feasibility Study 708
531 B1 B1.30 2013 Cable Systems Electrical Characteristics 679
537 A2 A2.33 2013 Guide for Transformer Fire Safety Practices 597
542 C4 C4.306 2013 Insulation Coordination for UHV AC Systems 590
540 B5 B5.36 2013 IEC 61850 Standard to Protection Schemes 588
528 A2 A2.36 2013 Transformer Procurement Process: Guide to Preparation of Specifications for 585
Power Transformers
529 A2 A2.36 2013 Transformer Procurement Process: Guide to Design Review for Power 582
Transformers
530 A2 A2.36 2013 Transformer Procurement Process: Guide to the Assessment of the Capability of 575
a Transformer Manufacturer
525 D1 D1.03 2013 Risk Assessment on Defects in GIS based on PD Diagnostics 558
535 C4 C4.208 2013 EMC within power plants and substations 555

e-cigre Publications Sales


Jan - Nov 2013
Ref SC WG Year Title No. of sales
CD12 CD-ROM 2012 CIGRE SESSION - SET OF PAPERS 11
490 B1 B1.27 2012 Recommendations for testing of long AC submarine cables with extruded insulation for system
voltage above 30 (36) to 500 (550) kV (This TB replaces electra article ELT_189_1)
9
529 A2 A2.36 2013 Transformer Procurement Process: Guide to Design Review for Power Transformers 8
CDE CD 30 years of ELECTRA 6
533 B4 B4.52 2013 HVDC Grid Feasibility Study 5
283 B1 B1.18 2005 Special bonding of high voltage power cables 5
426 B2 B2.26 2010 Guide for Qualifying High Temperature Conductors for Use on Overhead Transmission Lines
4
445 A2 A2.34 2011 Guide for Transformer Maintenance 4
204 12 12.22 2002 Guidelines for conducting design reviews for transformers 100 MVA and 123 kV and above.
4
528 A2 A2.36 2013 Transformer Procurement Process: Guide to Preparation of Specifications for Power Transformers
4

www.e-cigre.org
29/11/2013
e-cigre Publications All Sales
November 2013
Ref SC WG Year Title No. of sales
044 23 23.10 1993 Earthing of GIS. An application guide 1
11-201_2000 11 2000 Guide to evaluate the need to rebuild hydroelectric generators 1
147 22 22.14 1999 High voltage overhead lines. Environmental concerns, procedures, impacts and mitigations 1
Report on the 2nd international survey on high voltage gas insulated substations (GIS) service
150 23 23.02 2000
experience
1
21-02_1974 21 1974 The 420 kV AC Submarine Cable Connection Denmark-Sweden 1
21-05_1982 21 1982 Repair of 400 kV AC submarine cable 1
21-07_1986 21 1986 Thermomechanical stresses in extruded HV cables 1
21-101_1994 21 1994 Thermomechanical modelling of extruded Insulation HV Cables in Ducts 1
22-06_1968 22 1968 The Use of Soil Mechanics Methods for Adapting Tower Foundations to Soil Conditions 1
22-102_1994 22 2000 Performance evaluation of transmission tower foundations 1
Risk assessment to improve reliability of transmission facilities exposed to subtropical high wind
22-104_2000 22 2000
storm events
1
256 B2 B2.16 2004 Current Practices regarding frequencies and magnitude of high intensity winds 1
279 B1 B1.04 2005 Maintenance for HV cables and accessories 1
283 B1 B1.18 2005 Special bonding of high voltage power cables 1
31-02_1976 31 1976 The AEP-ASEA UHV project - Progress up to 1975 1
381 B3 B3.17 2009 GIS: State of the Art 2008 1
426 B2 B2.26 2010 Guide for Qualifying High Temperature Conductors for Use on Overhead Transmission Lines 1
445 A2 A2.34 2011 Guide for Transformer Maintenance 1
456 A3 A3.22 2011 Background of Technical Specifications for Substation Equipment exceeding 800 kV AC 1
457 C6 C6.11 2011 Development and Operation of Active Distribution Networks 1
476 B1 B1.22 2011 Cable Accessory Workmanship on Extruded High Voltage C&acirc bles 1
485 B2 B2.29 2012 Overhead Line Design Guidelines for Mitigation of Severe Wind Storm Damage 1
Recommendations for Testing DC Extruded Cable Systems for Power Transmission at a Rated Voltage
496 B1 B1.32 2012
up to 500 kV (This TB replaces TB 219)
1
529 A2 A2.36 2013 Transformer Procurement Process: Guide to Design Review for Power Transformers 1
546 B5 B5.37 2013 Protection, Monitoring and Control of Shunt Reactors 1
547 C1 C1.9 2013 Planning Issues for newly industrialized and developing countries (Africa) 1
ELT_260_1 B2 B2.39 2012 Overhead Line Design Guidelines for Mitigation of Severe Wind Storm Damage 1
ELT_267_2 A2 A2.36 2013 Transformer Procurement Process 1
ELT_029_2 23/33 1973 Phase to ground and phase to phase air clearances in substations 1

www.e-cigre.org
29/11/2013

Вам также может понравиться