CONDENSATE PUMP MOTOR 4B

CUSTOMER : GLOBAL BUSINESS POWER-TOLEDO POWER COMPANY DATE : January 28, 2020
ADDRESS : BRGY. DAANLUNGSOD TOLEDO CITY CEBU JOB ORDER NUMBER : 16141
QUOTATION : 2019-21520 PURCHASE NO. : 7817
SPECIFICATION:
RATING : 630A TRIP UNIT FAMILY : EKIP TOUCH MOUNTING : HORIZONTAL
RATED VOLTAGE : 690V TRIP UNIT TYPE : LSIG BRAND : ABB
RATED CURRENT : 630A INTERUPT RATING : 42kA SERIAL NUMBER : 9NE0140510115000
FREQUENCY : 60HZ BREAKER FAMILY : EMAX 2 USAGE : CONDENSATE PUMP 4B
POLE : 3 BREAKER TYPE : ACB

ELECTRICAL FINDINGS
A. INSULATION TEST
Instrument Used : UNI-T 513A Insulation Tester
PARTICULARS (BREAKER OPEN) Results @ 1 min (GΩ) Minimum Value Applied Voltage (kV) REMARKS
L 1 LINE - L1 LOAD 17.5GΩ 100MΩ 1.0 PASSED
L 2 LINE - L2 LOAD 40.6GΩ 100MΩ 1.0 PASSED
L3 LINE - L3 LOAD 1000GΩ 100MΩ 1.0 PASSED
PARTICULARS (BREAKER CLOSE) Applied Voltage (kV) REMARKS
L1 LINE - L2 LINE 1000GΩ 100MΩ 1.0 PASSED
L2 LINE - L3 LINE 1000GΩ 100MΩ 1.0 PASSED
L3 LINE - L1 LINE 1000GΩ 100MΩ 1.0 PASSED
PARTICULARS Results @ 1 min (GΩ) Minimum Value Applied Voltage (kV) REMARKS
L1 - G 1.40GΩ 100MΩ 1.0 PASSED
L2 - G 1.58GΩ 100MΩ 1.0 PASSED
L3 - G 1.37GΩ 100MΩ 1.0 PASSED

B. CONTACT RESISTANCE
Instrument Used : Teldar Winding Resistance Tester TRM-5

PARTICULARS (BREAKER CLOSE) Results @ 1 min (Ω) Current (A) REMARKS


L1 LINE - L1 LOAD 0.0228mΩ 5.08A
L2 LINE - L2 LOAD 0.0235mΩ 5.08A BALANCE
L3 LINE - L3 LOAD 0.0210mΩ 5.08A

Remarks/ Evalaution:
Test Result obtained on ACB Trip unit Shows Satisfactorily result.

Obtained Result are within acceptable limits


Test Result obtained on ACB shows satisfactorily results. Contact Resistance for each phases are balanced and no significant deviations are
observed

Reference:

Acceptable value for insulation resistance test is not less than 100MΩ ACCORDING ANSI NETA ATS 2009 p.204 TABLE 100.1

See ANSI/NETA ATS Acceptable for having a value not deviating more than 50% to it's adjacent pole.

See ABB Emax 2 Manual p.30 Summary Table of Standard protection

Recommendation:
Continue Trending of Test Results to monitor insulation condition, retest after one(1) year

Retest after One(1) year to monitor ACB contact condition