Академический Документы
Профессиональный Документы
Культура Документы
CALL-OFF CONTRACT
FOR
FABRICATION OF PLATFORM
DECKS, TOPSIDES, JACKETS
AND ASSOCIATED STRUCTURES
CLIENT:
ADDAX PETROLEUM DEVELOPMENT (NIGERIA) LIMITED
32 OZUMBA MBADIWE AVENUE
VICTORIA ISLAND
LAGOS
NIGERIA.
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
INSPECTION
&
TEST PLAN
INDEX
1.0 INTRODUCTION
a) SCOPE
b) APPLICABLE LEGEND
Page 2 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
SCOPE OF WORK
The WORK which the CONTRACTOR is hereby required to perform is more
particularly described in Sections IV through XII of the CONTRACT and include
but not be limited to:
All necessary interfaces with third parties and company’s other contractors;
The scope of this Inspection and Test Plan is to establish the minimum
Inspection interventions requiring adequate monitoring and documentation
during the execution all phase of Works to be performed during the Call Off
Contract for Fabrication of Platform Decks, Topsides, Jackets and Associated
Structures Project which is being planned to be handled by VANDREZZER
ENERGY SERVICES LIMITED (VESL) for ADDAX.
b) APPLICATION LEGEND
The below inspection intervention legends shall be used and agreed between
the involved organization before implementation of this Inspection Plan.
Page 4 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
Furthermore, the functions responsible for the inspection activities are referred to
under the VANDREZZER Inspection Requirements column.
Where the responsible functions is indicated within the section title, the whole
sections inspection points shall be under the same function’s responsibility.
Where certain inspection points require specific qualified function, this shall be
referred to within each inspection points.
The Quality Control Supervisor remains at all times and in any case responsible or
verifying the fulfilment of this Inspection Plan
INSPECTION CODE:
W - Witness Activity
H – Hold
Page 5 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
RESPONSIBILITY
ITEM ACTIVITY
VENDOR VANDREZZER ADDAX OTHER
1.0 Piping
1.1 Material Certification P M
1.2 Welding Plan and Welding P M W
1.3 Welder’s Performance P M
1.4 Production Test of Weld (if required) P M
1.5 Post Weld Heat Treatment (if required) P M
1.6 Radiographic Examination (as applicable) P M W
1.7 Hydrostatic Test (when required) P M W
Liquid Penetrant and/or Magnetic Particle
1.8 P M W
Examination (if required)
1.9 Dimensional Check and Visual Inspection P M W
1.10 Check of Marking P M
1.11 Flushing and Cleaning of Lines P M W
Inventory and Inspection of Mechanical Equipment
1.12 P M
(Valves, Gaskets, Bolt, etc)
2.0 Concrete
2.1 Raw Material Specification P M
2.2 Mix Design/Laboratory Result P M
2.3 Trial Mix Design for Concrete and Asphalt Surface P M W
2.4 Production Control (Slump and 3 Test Specimens) P M
2.5 Grouting Material, Mix and Pour P M W
3.0 Structural Steel
3.1 Material Certificates P M
3.2 Welding Plans and Welding P M W
3.3 Dimensional Check and Visual Inspection P M W
4.0 Painting
4.1 Painting Material P M
4.2 Surface Check P M
4.3 Surface Preparation Check P M W
4.4 Dry Film Thickness Check P M W
4.5 Final Visual Checks P M
5.0 Electrical/Instrumentation
Field Purchased Material for Compliance to
5.1 P M
Specifications
5.2 Insulation Resistance Check P M
5.3 Earthing resistance check P M
5.4 Terminal connection tightness check (visual) P M W
5.5 Functional check P M W
Page 6 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
6.0 INSPECTION MATRIX
REFERENCE VERIFYING LEVEL OF INSPECTION REQUIRED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
NUMBER REFERENCE VANDREZZER SUBCON ADDAX
NDT NON DESTRUCTIVE TESTING (NDT)
During Operations
%
Page 7 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERENCE VERIFYING LEVEL OF INSPECTION REQUIRED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
NUMBER REFERENCE VANDREZZER SUBCON ADDAX
Identify non-conformities or collect information and raise Non Conformity QC Supervisor W,V,R
NCR.1 non conformity report if any when necessary Report W,V,R
Page 8 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERENCE VERIFYING LEVEL OF INSPECTION REQUIRED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
VANDREZZER SUBCON ADDAX
NUMBER REFERENCE
PI PIPING
Checking if the following date has been marked on Piping Details A
PI.1 Constr. Engr.
isometric or construction drawings and they conform to the Drawings V/R
requirements
a) Weld number
b) W.P.S reference
c) NDT Requirements
d) Material marketing and identification
PI. P I PI N G I N S T A L LA T I ON / E RE C T I ON
Page 9 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERENCE VERIFYING LEVEL OF INSPECTION REQUIRED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
VANDREZZER SUBCON ADDAX
NUMBER REFERENCE
THREADED FITTINGS
a) Check for the state of the thread
b) Check for cleanliness of the thread %
P1.6 V
c) Check for correction application of sealing compound.
d) Check for correct tightening
SUPPORTS
a) Check for correct location of supports
P1.7 V/D,R %
b) Check if the correct type is installed
c) Check Welding and NDT of supports
P1.8 V I S U A L I N S P EC T I ON A N D F I N A L C H E C K S
a) Verify that all installed piping components comply with
applicable isometrics, drawings and P&1 Diagram
V/D,R V/D,R
b) Verify that equipment aligns with piping flanges
c) Verify that the completed system is punch listed
P1.9 Incorporate all As-Built information in isometrics
drawings and diagrams
STR. STRUCTURAL
STR. 1 Alignment and fit-up checklist R. A
STR.2 Before permanent assembly confirm that components are
on a level plan.
Check dimension and fit-up of structures before erection As-Built Piping Mech. Supervisor W
STR.3 Details DWGS V/D
Verify that there is no straining of members during fit-up
STR. 4 Confirm alignment of components after lack Welding V/D W
Page 10 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERNCE VERIFYING LEVEL OF INSPECTION REQUIED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
VANDREZZER SUBCON ADDAX
NUMBER REFERENCE
BOLTED CONNECTION
Carry out the following decks on noticed connections
a) Check that hole dimensions are in such are in
such a way as not to cause damage to both
thread
b) B) Check for alignment of bolt holes
STRS.5 V W
c) After insertion, check that bolt head and nuts
rest squarely no metal that head and nuts rest
squarely on metal face.
d) Verify correct type, length and protrusion of
bolt beyond nut.
e) Confirm that nuts are locked at required
tightening values.
REMOVAL OF TEMPORARY
ATTACHMENTS
a) Check that removal is performed by thermal
cutting.
b) Check that cutting on temporary attachment
STR 6 V/D W
was performed 3mm from joining point
c) Verify that from the cut off location, stud is
ground off to parent metal
d) Ensure that no damage is done to the parent
metal as a result of removal of temporary
structures.
Page 11 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERNCE LEVEL OF INSPECTION REQUIED
VERIFYING
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
REFERENCE VANDREZZER SUBCON ADDAX
NUMBER
Page 12 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
REFERNCE VERIFYING LEVEL OF INSPECTION REQUIED
ITEM DESCRIPTION OF QC ACTIVITY DOCUMENT DOCUMENT
VANDREZZER SUBCON ADDAX
NUMBER REFERENCE
MEC MECHANICAL
Page 13 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
4.0 PRESSURE HYDRO TESTING PLAN
A. INTRODUCTION
This Pressure Hydro Testing Plan is designed for the testing of piping works in a manner to avoid
unnecessary delay during the execution of Construction and Installation of New Ovhor Manifold Skid
and Support Project which is being planned to be handled by VANDREZZER ENERGY SERVICES
LIMITED (VESL) for ADDAX.
B. SCOPE
This Plan pertains to activities related to pressure testing of the Piping Spools, and Pipeline Sections
in order to ascertain its’ integrity and proper installation condition prior to commissioning.
C. REFERENCES
Standard construction specifications base on ISO 9001/9002: For Pressure Testing
D. RESPONSIBILITY
D.1 The Site Construction Manager shall be responsible for the implementation of these
Plans.
D.2 The Site Engineer shall be responsible for correct application of this Plan.
D.3 The QA/QC Engineer shall be responsible for inspection activities related to this Plan by
way of Quality Control inspection personnel and also for collection and filling of Quality
Control documentation.
Testing schedule shall be developed prior to any hydro-testing, detailing the duration and preparing
isometric for each section to be tested and construction of temporary works and test provision.
The test section shall clearly be identified by isometrics and P&I drawings. This is to ensure that each
has sufficient vents and drains.
G. PRE-TEST PREPARATION
Operations prior to introduction of test medium shall be as follows:-
Page 14 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
G.1 Prior to proceeding with any hydrostatic testing of Piping the following
documentation shall be prepared and where appropriate, signed by both
VANDREZZER and ADDAX representatives.
a) Checklist
b) Piping erection Report
c) Erection acceptance Report
d) Pipe Testing Reports
G.2 Two Pressure Gauges (calibrated) shall be installed with pressure rating not
exceeding 1.5times of test pressure. The gauges where possible, shall be at the
lowest and highest elevation but shall be in any case at the maximum distance
possible away from one another.
G.3 All valves in the test section shall be in the open position (Ball valves and plug valves
½ open) unless specifically directed otherwise in writing by ADDAX’s representative.
Relieve valves and bursting discs shall be removed and their connections blanked off.
G.4 It shall be ensured that during pressure testing no movement, thrusts or forces can
occur during the test.
G.5 Prior to flushing of pipe works, all control valves shall be removed and replaced with
spool pieces
G.6 Prior to flushing all isolating valves of the level gauges shall be in the closed position.
After flushing the isolating valves of the level gauges shall be opened where
applicable.
G.7 All safety valves shall be removed before flushing and shall be checked by ADDAX for
piping” and sealing where applicable
G.8 Flow meters shall be removed before flushing and reinstalled upon completion of
the hydro-testing. Where required spool pieces shall be installed.
G.9 Filter elements of strainers shall be removed before flushing and reinstalled before
hydro-testing.
G.10 The open drain/closed drain pumps shall be removed before flushing reinstalled
upon completion of hydro-testing.
G.11 All impulse line shall be disconnected from the process equipment or piping prior to
flushing and reconnected after completion of the hydro-testing.
Page 15 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
G.13 The following items shall either be removed and replaced with temporary spool
pieces or isolated by blanks
- Safety valves
- Control valves
- Equipment/machinery
- Instrumentation
G.14 The items to be tested shall be adequately vented and drain facilities available where
possible.
Page 16 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
Test shall be started and stopped in the presence of the persons authorised to witness these tests on
behalf of ADDAX.
On no account shall closed valves be utilized for pressure containment in a system under test.
The containment shall be effected by suitably rated spades, blind flanges or Welded on dome end
caps.
Upon completion of the hydro-test of the piping system, the leak-free tightness of any valve
specified as “100% tight shut-off” shall be verified.
Safety of all employees and the public during the pressure testing is of paramount importance and
this can be achieved by the following viz:
- Availability of sufficient and efficient Safety Personnel.
- The whole area under test shall be barricaded with rope and appropriate warning signs
e.g. “KEEP OFF PIPING UNDER PRESSURE” shall be put in place.
- Human traffic shall be controlled by dedicated personnel
- Fire watch/extinguisher shall be dedicated and safe hand tools shall always be used.
- Hydro-testing personnel shall at all times be in liaison with CASHES officer.
- The system under test must be adequately vented to exclude any possibility of air
pockets.
- Blanking-off shall be ensured to be of correct rating and that such items, in particular
screwed plugs and connections, are not liable to be ejected during testing, e.g. as a result
of thread failure or inadequate thread engagement.
- System shall not be subjected to any form of shocking loading, such as hammer testing
whilst undergoing strength tests.
- Systems subjected to maximum test pressure should not normally be approached for
close inspection until after a reasonable period of time has elapsed.
- Seawater shall be considered as a testing medium for systems where fresh water is
unavailable. However, this shall be done only with prior written permission of ADDAX.
In all cases where seawater is used this must first be inhibited. There will be cases where
inhibited seawater is unsuitable and in such circumstances special provisions must be
made to obtain clean fresh water.
- Where a pressurising medium other than water is used, care shall be concerned.
K. SAFETY
Safety of all employees and the public during the hydrostatic pressure testing is of paramount
importance and this can be achieved by the following viz:
- Availability of sufficient and efficient Safety Personnel at all times during pressure testing
activities.
- The whole area under test shall be barricaded with hazard tape and appropriate warning
signs e.g. “KEEP OFF PIPING UNDER HYDROSTATIC PRESSURE” shall be put in place.
- Human traffic shall be controlled by dedicated personnel
-
- Fire watch/extinguisher shall be dedicated and safe hand tools shall always be used
provide certified stand by fire extinguisher.
- Hydro-testing personnel shall at all times be in liaison with CASHES officer.
- The system under test most be adequately vented to exclude any possibility of air
pockets.
- Blanking-off shall be ensured to be of correct rating and that such items, in particular
screwed plugs and connections, are not liable to be ejected during testing, e.g. as a result
of thread failure or inadequate thread engagement.
Page 17 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
- System shall not be subjected to any form of shocking loading, such as hammer testing
whilst undergoing strength tests.
- Systems subjected to maximum test hydrostatic pressure should not normally be
approached for close inspection until after a reasonable period of time has elapsed.
- Where a pressurising medium other than water is used, care shall be concerned.
- Follow PTW strictly.
- Toolbox meeting prior to work commencement.
- Strict supervision should be enforced.
- Adhere to Plan.
- Use appropriate PPE.
- Use PFD when servicing close to water bodies.
- Restrict movement around the Hydrotest operation/activities area.
Page 18 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
L. ATTACHMENTS
HYDROTEST PACKAGE
LINE NOS:
FROM POINT:
TO POINT:
TEST PRESSURE:
DURATION OF TEST
REMARKS
SIGNATURE:
TITLE : TITLE :
SIGN: SIGN:
DATE : DATE :
Page 19 of 20
CALL-OFF CONTRACT FOR FABRICATION OF PLATFORM DECKS, TOPSIDES, JACKETS AND ASSOCIATED STRUCTURES
“TECHNICAL BID”
M. HYDROSTATIC TEST AND TEMPERATURE DATA RECORD
PROJECT: LOCATION:
Pressure Recorder
Temperature Recorder
Pressure Gauge
Deadweight Tester
TEST WITNESSED:
VANDREZZER QC PERSONNEL ADDAX REPRESENTATIVE
NAME: NAME:
TITLE : TITLE :
SIGN: SIGN:
DATE : DATE :
Page 20 of 20