Вы находитесь на странице: 1из 7

MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)

Prepared On 5/26/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct 9/Dec B R02 Submitted to the Client.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 Submitted to the Client.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 Input and Basis for ECS Design Sunil Gupta 18-Jun 28-Jun 6-Sep 23-Sep 20-Nov B R02 Submitted to the Client.

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov 10-Dec B R02 Submitted to the Client.

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the Client

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the Client

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Draft I/O Schedule of BKC station received from I2ST.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised BOQ required for Pumps & ECS Fans urgently.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 4.00 1.00 18-Nov 20.00% 80.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00% Submittal required for Servers, Desktop etc.
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

Status B received on ECS - Fire & Non-Fire Dampers, OTE Dampers, Grille &
2 Submittals 2 2
Diffusers, MS&GI Pipes, GI Ducting, MOV's Submittals.

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/27/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct 9/Dec B R02 Submitted to the Client.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 Submitted to the Client.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 Input and Basis for ECS Design Sunil Gupta 18-Jun 28-Jun 6-Sep 23-Sep 20-Nov B R02 Submitted to the Client.

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov 10-Dec B R02 Submitted to the Client.

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the Client

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the Client

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Draft I/O Schedule of BKC station received from I2ST.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised BOQ required for Pumps & ECS Fans urgently.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 4.00 0.00 18-Nov 0.00% 100.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00% Submittal required for Servers, Desktop etc.
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

Status B received on ECS - Fire & Non-Fire Dampers, OTE Dampers, Grille &
2 Submittals 2 2
Diffusers, MS&GI Pipes, GI Ducting, MOV's Submittals.

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/27/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct B R02 avsailable with STEC for submission.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 shall be uploaded tomorrow.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 ECS Design Basis Report Mahendra Singh 18-Jun 28-Jun 6-Sep 23-Sep 18-Nov B Under Preparation

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov B Under Preparation

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the GC.

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the GC.

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Document Awaited.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised BOQ required for Pumps & ECS Fans urgently.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 4.00 0.00 18-Nov 0.00% 100.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00% Submittal required for Servers, Desktop etc.
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

2 2 2

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/27/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct B Comments Received from GC on R01 Submission.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 shall be uploaded tomorrow.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 ECS Design Basis Report Mahendra Singh 18-Jun 28-Jun 6-Sep 23-Sep 18-Nov B Under Preparation

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov B Under Preparation

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the GC.

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the GC.

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Document Awaited.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised Heat Load Estimations recievd on 22-Nov-19. May affect equipment selections.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 1.00 0.00 18-Nov 0.00% 100.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00%
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

2 2 2

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/26/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct B Comments Received from GC on R01 Submission.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 shall be uploaded tomorrow.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 ECS Design Basis Report Mahendra Singh 18-Jun 28-Jun 6-Sep 23-Sep 18-Nov B Under Preparation

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov B Under Preparation

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the GC.

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the GC.

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Document Awaited.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised Heat Load Estimations recievd on 22-Nov-19. May affect equipment selections.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 1.00 0.00 18-Nov 0.00% 100.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00%
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

2 2 2

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/27/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov C R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct B Comments Received from GC on R01 Submission.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep 4/Dec B R02 shall be uploaded tomorrow.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 ECS Design Basis Report Mahendra Singh 18-Jun 28-Jun 6-Sep 23-Sep 18-Nov B Under Preparation

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov B Under Preparation

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B R01 Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct 19-Nov B Under Preparation

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the GC.

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B R01 Submitted to the GC.

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Document Awaited.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 10.00 18-Nov 3-Dec 37.04% 62.96% Revised Heat Load Estimations recievd on 22-Nov-19. May affect equipment selections.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 1.00 0.00 18-Nov 0.00% 100.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00%
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

2 2 2

3 3 3

4 4 4
MUMBAI METRO RAIL CORPORATION (CONTRACT REF : MM3-CBS-TVE-P1)
Prepared On 5/26/2020
DAILY PROGRESS REPORT Updated On 5/27/2020
KD - 1 (CONCEPT DESIGN STAGE)
R00 R01 R02 R03
Current
S.No Document Author
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status Remarks/Dependancies

1 Design Basis for TVS Simulation Studies Walter Chuk 31/May 4/Jun 7/Jun 18/Jun 5/Aug 14/Aug 13/Nov A R03 Submitted to the Client.

2 IDA Tunnel Software- Functionalities & Validation Results SMH Adil 18/Jun 6/Jul C Approved.

3 IDA Tunnel Simulation Report SMH Adil 2/Aug 16/Aug 25/Oct 11/Nov B Sent for IDA Review

4 CFD Tunnel & Trackway SMH Adil 2/Aug 16/Aug 23/Oct 11/Nov A Sent for IDA Review

5 SRS - ECS, TVS & Electrical Sunil Gupta 9/Aug 14/Aug 14/Oct 31/Oct B Comments Received from GC on R01 Submission.

6 SRS - SCADA Vasu Mohan 9/Aug 16/Aug 11/Sep 23/Sep B R02 shall be submitted to GC.

KD - 2 (PRELIMINARY DESIGN STAGE)


COMMON DESIGN DOCUMENTS PROGRESS REPORT
R00 R01 R02 R03
Current
S.No Document Author Remarks/Dependancies
Subm. GC Response Subm. GC Response Subm. GC Response Subm. GC Response Status

1 ECS Design Basis Report Mahendra Singh 18-Jun 28-Jun 6-Sep 23-Sep 18-Nov B Under Preparation

2 Design Basis for Electrical Calculations Gursheen Kaur 3-Sep 17-Sep 11-Oct 11-Nov B Under Preparation

3 CFD Concourse & Platform SMH Adil 19-Oct 8-Nov B Sent for IDA Review

4 Heat Load Calculations Sunil Gupta 29-Oct - Under GC Review

5 Ventilation Calculations & Fresh Air Calculation Sunil Gupta 3-Sep 9-Sep 11-Oct 22-Oct B Under Preparation

6 Control strategies for ECS Vasu Mohan 3-Sep 16-Sep 16-Nov B R01 Submitted to the GC.

7 Preliminary Interface details Mahendra Singh 28-Aug 23-Sep 21-Nov B Under Preparation

8 Fire Safety Report Walter Chuk - Inputs provided to Mr Walter, feedback on report awaited.

9 Preliminary Electrical Load Sheet Jafar Zaidi 3-Sep 17-Sep 17-Oct 11-Nov B Under Preparation

DRAWING PROGRESS REPORT


Aarey Status B Seepz Status B MIDC Status B Marol Naka Status B CSIA International Status B Sahar Road Status B
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 7 7 7 7 19 19 19 19 19 19 19 19 22 22 22 22 18 18 18 18 19 19 19 19
Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Total 9 9 9 9 21 21 21 21 21 21 21 21 24 24 24 24 20 20 20 20 21 21 21 21
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -

CSIA Domestic Status B Mid Vent Shaft Status B Santa Cruz Status B Vidyanagri Status B BKC Status B
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 18 18 18 18 6 6 6 6 18 18 18 18 18 18 18 18 23 23 23 23 187 187 187 187


Electrical 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
SCADA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11
Total 20 20 20 20 8 8 8 8 20 20 20 20 20 20 20 20 25 25 25 25 209 209 0 209
Pending 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 209 0
Progress 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - - 100.00% - -
KD - 3 (DETAILED DESIGN STAGE)
COMMON DESIGN DOCUMENTS PROGRESS REPORT
Preparation IDA Certification Submission
S.No Document Author Remarks/Dependancies
Plan Actual Delay Plan Actual Delay Plan Actual Delay
1 Heat Load Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

2 Ventilation Calculations Mahendra Singh 7-Oct 21-Oct 23-Oct To be submitted if there are any major changes to the existent design.

3 System Pressure Drop Calculation - TVS Sunil Gupta + Nitesh 21-Sep 249.00 5-Oct 7-Oct Under Preparation.

4 System Pressure Drop Calculation - ECS Sunil Gupta + Nitesh 28-Sep 242.00 12-Oct 14-Oct Under Preparation.

5 Pump Head Calculation Sunil Gupta + Imran 10-Oct 230.00 24-Oct 26-Oct Draft Completed.

6 Acoustic Calculation - TVS Nitin Chauhan + BD 28-Sep 242.00 12-Oct 14-Oct

7 Acoustic Calculation - ECS Nitin Chauhan + BD 10-Oct 230.00 24-Oct 26-Oct

8 Pneumatic System Calculation Akash Gupta 21-Sep 29-Oct 38.00 5-Oct 7-Oct Revised Draft for Package 1 submitted for Internal Review.Comments Awaited.

9 Electrical Calculations (cable sizing, earthing, etc) Gursheen Kaur 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Electrical Design. Design works have been initiated.

10 Detailed Electrical Load Sheet Gursheen Kaur + Akash 10-Oct 11/18/2019 230.00 24-Oct 26-Oct Draft Details prepared and submitted for initial review.

11 TVS Nozzle Size Calculation SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

12 CFD Analysis - Nozzle SMH Adil +Jafar 21-Sep 249.00 5-Oct 7-Oct Commenced.

13 SCADA I/O Schedule Vasu Mohan 10-Oct 230.00 24-Oct 26-Oct Document Awaited.

14 ECS & TVS Equipment Support Structure Calculations Akash Gupta 10-Oct 230.00 24-Oct 26-Oct Input Typical Structure Layouts required for Proceeding with the preparation.

15 Interface Test Plan Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.

16 Detailed Interface Details Mahendra Singh 21-Sep 249.00 21-Sep NA NA 23-Sep Document Preparation under process.
Pressure Drop Calculations have to be finalized, for Fan Selection.
17 TVS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 28-Sep 242.00 12-Oct 14-Oct
Pressure Drop Calculations & Fan Schedule have to be finalized, for Fan Selection.
18 ECS Equipment Selection Jafar Zaidi + Nitin Chauhan + Akash 10-Oct 230.00 24-Oct 26-Oct

19 Electrical and SCADA Equipment Selection Manish Mohan + Vasu 10-Oct 230.00 24-Oct 26-Oct Load Details provided for initiation of Equipment Selection.

TECHNICAL SUBMITTAL
Scope Submission Dates Progress
S.No Document Author Remarks/Dependancies
Scope Prep IDA Cert Submit Plan Actual Delay Comp Pending

1 ECS Akash Gupta 27.00 15.00 NA 9 18-Nov 3-Dec 33.33% 66.67% Revised Heat Load Estimations recievd on 22-Nov-19. May affect equipment selections.

2 TVS Akash Gupta 7.00 1.00 0.00 18-Nov 0.00% 100.00%


3 Electrical Manish Mohan 5.00 1.00 1.00 18-Nov 20.00% 80.00%
4 SCADA Vasu Mohan 1.00 1.00 1.00 18-Nov 100.00% 0.00%
DRAWING PROGRESS REPORT
Aarey Status Seepz Status MIDC Status Marol Naka Status CSIA International Status Sahar Road Status
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit

ECS-TVS 5 34 38 43 43 45
Electrical & 0 19 19 22 25 25
SCADA
Spare 0 4 4 4 4 4
Total 5 57 61 69 72 74
Pending 5 5 5 57 57 57 61 61 61 69 69 69 72 72 72 74 74 74
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -

CSIA Domestic Status Mid Vent Shaft Status Santa Cruz Status Vidyanagri Status BKC Status
Grand Total
Discipline
Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert Submit Scope Prep IDA Cert 4

ECS-TVS 42 7 37 36 42 372.00 - - -
Electrical &
25 0 19 20 19 193.00 - - -
SCADA
Spare 4 0 4 4 4 36.00 - - -
Total 71 7 57 57 57 601.00 - - -
Pending 71 71 71 7 7 7 57 57 57 57 57 57 57 57 57 601.00 601.00 601.00
Progress 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - - 0.00% - -
Remarks Remarks Remarks
S.No Discipline Description S.No Discipline Description S.No Discipline Description

ECS/TVS
1 Status B received on Preliminary Design drawings of all stations. 1 1
Drawings

2 2 2

3 3 3

4 4 4

Вам также может понравиться