Академический Документы
Профессиональный Документы
Культура Документы
FABRICATION WORK
INDEX
1. PURPOSE
2. SCOPE
3. REFERENCES
4. DEFINITIONS
5. RESPONSIBILITIES
6. PROCEDURE
8. SAFETY INSTRUCTION
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
1. PURPOSE
The purpose of this method statement is to define the procedure for fabrication of alloy
steel piping under the DPC project specification.
2. SCOPE
Material handling
Fabrication
Welding
NDE
Inspection
3. REFERENCE
4. DEFINITIONS
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
CL Client
PM Project Manager
SPE Senior Piping Engineer
PS Piping Supervisor
ITP Inspection and Test Plan
QC Quality Control
QCE Quality Control Engineer
PQP Project Quality Plan
PPE Personal Protection Equipment
PMI Positive Material Identification
NCR Non-Conformance Report
5. RESPONSIBILITIES
The piping raw material received from client shall be offloaded in designated
lay down yard.
During offloading, pipes shall not be dropped off the transport. A crane and
suitable certified slings shall be used.
The pipes shall be placed on wooden bar and they shall be adequately
supported to minimize sagging.
The piping end covers shall be kept in place to prevent foreign particle entry
into the pipes.
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
6.2 PAINTING
The piping isometrics shall be marked into number of spools to facilitate the
fabrication & erection work.
Each spool shall be marked with a piping tag number.
Each joint on the isometric will be given a unique number preparing a welding
map for traceability. Separate numbering system will be followed for butt welds,
fillet welds and threaded joints etc.
The details of piping isometric breakdown into spools and joints will be recorded
for reference.
Material will be shifted from lay down yard to work shop as per relevant piping
isometric drawings.
Carbon steel, stainless steel and alloy steel fabrication work will be done in
separate area. Tools & equipment compatible with the material in fabrication
shall be used.
The piping material is to be used in appropriate and economical way. All cuttings
should be collected separately as per material code and place in order to make
best use of these.
The pipe for welded sockets joint shall be ground to remove burrs
due to cutting. A gap between end of pipe & bottom of socket will
be maintained as per project specification.
6.5 WELDING
All Welding work will be according to approved WPS and only qualified welders
shall be employed.
Heat treatment will be indicated on NDT matrix, where required.
The welding work piece will be shielded against high winds and rain.
The weld surface shall be cleaned with wire brush or grinding prior to welding
operations to give a surface free from rust, scale or mill coating.
Between each layer of welding any cracks, pores or welding spatters shall be
removed by grinding the surface before application of next layer.
The appearance of finished welds shall conform to ASME B 31.3 code & WPS
and shall exclude any under cut, spatters and cracks.
All branch connections shall be joined to headers with full penetration welding.
The bore side shall be ground smooth, free from cracks.
Preheating shall be done in accordance with the welding requirement related to
each class of piping base metal material.
Welding shall be performed to ensure complete fusion of the weld deposit and
the base metal in order to obtain homogeneous bound over the entire cross
section area of the weld.
Welding current and polarities shall comply with the approved WPS.
6.6.1 GENERAL
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
Before starting any heat treatment process, it will be checked that
welding has been completed.
The temperature can be checked with the aid of thermochrome
crayons or thermocouples.
The preheating temperature shall be maintained throughout the
welding cycle and it should be done over sufficient width on either
side of welds.
6.6.3 PRECAUTIONS
6.7 INSPECTION
The fabricated pipe spool shall be checked against project drawings to verify its
compliance.
The dimensions, angle and direction of spool and allowances for field welding
shall be according to the isometrics & project specification.
NDE shall be performed as per approved NDT matrix sheet.
The acceptance criteria for visual inspection shall be done according to the
ASME b 31.3
NDE tests shall be performed & recorded as per approved NDT matrix sheet.
The NDE result shall be interpreted by qualified inspectors
All welding records for each joint shall be maintained throughout the fabrication
work.
6.8 IDENTIFICATION
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
Each fabricated spool shall be clearly marked with a number. This number
include line number & spool number as shown on the piping isometric drawing.
6.9 STORAGE
7.1 EXECUTION
Hand tools
Cold cutting machine
Cutting & grinding machine
Overhead crane
Forklift/ Boom loader
Welding machine
PWHT machine
7.2 SAFETY
Safety helmet
Safety Goggles
Gloves
Safety Shoes
Welding Helmet
Ear Plug
Dust Mask
7.3 TESTING
Radiography
Document No:
Method Statement for Alloy steel POFSC-MS-P-A-01
pipe fabrication Work
Rev 0
8. SAFETY INSTRUCTION
During execution of the job all measure shall be adopted to ensure safe working.
POFSC will ensure that, PTW system shall be implemented as per client requirement at
site.