28-JAN-2019
SADHNA SINGH (8424)
Page 1 of 24
CLIENT : M/s HPCL EIL Job No.
PLANT : CPP BHEL Transmittal/Letter
CONTRACTOR : M/s BHEL no:
28-JAN-2019
SADHNA SINGH (8424)
Page 2 of 24
4 Refer Cl. No. 3.2.2 We have Comment if Noted Combinat In the VC As per Please refer
of design bases considered 8 any will be ion firing meeting tender BHEL reply
(B016-606-02-43- nos. burners. provided with of fuels dtd.09/10/1 combina dtd.25/10/
DB-01), combination Also at a time, write up. to be 8, BHEL tion 18.
firing of (0-100%) of one fuel will be consider informed firing Deviation
any gaseous and fired in one ed. that shall be permit in
liquid fuel is to be burner. Hence, combinatio provided proper
provided. Minimum the minimum n firing of .If BHEL format will
quantity shall be quantity of gas fuels in don’t be raised.
based on turndown that can be different provide
of burner so fired approx. burners is the
accordingly fuel from 2% of MCR possible by same,
0% to turndown limit and minimum sending BHEL to
of burner can’t be quantity of oil gaseous raise
utilised. BHEL to that can be fuel in deviatio
confirm and provide fired will be some n in
write- up meeting approx. 4% of burners proper
the requirement. MCR. Hence, and liquid format
the system fuel in with
designed is in other technica
line with the burners. l
process EIL justificati
requirement informed on.
considering that this
limitation of point will
burner be taken
turndown. The up with
detailed write- Customer
up will be by EIL and
provided will revert
shortly. back.
5 Refer Cl. No. 3.2.2 Point -- -- Same Same as
of CPP-Design Confirmed. noted closed as point point 4
Basis (B016-606-02- The system 4
43-DB-01), During will take care
combination firing, all normal
outage of one fuel disturbances.
other will take-up Detailed write-
the full load up will be
during GTG provided
exhaust as well shortly
as fresh air firing
load and parameters.
BHEL to confirm
and provide write-up
meeting the
requirement. BHEL
to ensure that
all eventuality is
to be considered
while designing the
system
28-JAN-2019
SADHNA SINGH (8424)
Page 3 of 24
Refer Note – 9 , Please refer Pl see
6. fuel selection enclosed Past “BHEL Detailed Please
BHEL to provide reference of Reply to write-up refer Note
sheet point to be 9 in the -- Point
past reference the same to no.6.
be provided. submitte P&ID for closed.
where scheme of dtd.16/8/ d. various
such multi fuel 18”given
permutatio
firing system has i. During below
n and
been provided. auto control combinatio
BHEL to clarify the whether n of
following i. priority of operating
sequence of fuel fuel can be scenario.
when burner is in changed by
auto is not clear. operator?
BHEL to provide -As
write with clarity ii. mentioned if
When all burners NG, RG,
are not in auto and Naphtha
on single fuel. selected
During such ,naphtha will
scenario outage of be under
main fuel may lead active
to trip[ the HRSG control.
outlet / steam However as
temperature. iv. Is per note 9 of
it possible to run P&ID,only 3
with all burners in selector
auto mode? If yes, switch
BHEL to clarify position ie.,
during such only gas,only
scenario if few liquid
burners are on oil oil&gas.BHE
firing mode, which L to clarify
control valve shall whether two
be in action in gases and
case of fuel only liquid
demand changes. fuel or vice
V BHEL to versa can
provide write-up also be
with all selected.
permutation and ii. Not
combination of clarified in
operating scenario enclosed
and its. Vi. sheet wrt
BHEL to clarify HRSG
whether any one tripping
of gas (RING or iii. Not
refinery fuel gas) clarified in
and any of the enclosed
liquid fuels (HSD sheet
or naphtha) can be wrt HRSG
fired outlet steam
simultaneously in parameters
an individual V. To be
burner. provided
28-JAN-2019
SADHNA SINGH (8424)
Page 4 of 24
7. Detail X, Y &Z is not Reflected in The same to Shown in -- -- --- --
applicable to this revised P&ID be shown in concerne
drawing. The same concerned d P&ID
shall be reflected to P&ID
where it is applicable.
28-JAN-2019
SADHNA SINGH (8424)
Page 5 of 24
Speck break shall be a
NRV outlet
(downstream from
gaseous fuel side)
Natural gas drain Natural gas and Point -- -- -- --
13. lines has MOC as fuel gas drain noted closed
A1K while refinery lines MOC is
fuel gas drain lines A1K. Corrected
in revised P&ID
have MOC A1A.
BHEL to check
14. Drains to be shown Location of Drains -- -- --- -
in strainers. Complied drain to be provided
checked at the
outlet of
strainers
Gaseous fuel vent Point -- -- --- -
15. shall be free Indicated in Noted closed
draining to flare revised P&ID
header and shall
have no pocket.
BHEL to provide HC Not done HC BHEL HC detectors
16. HC Complied. As Refer client detectors detectors confirme are provided
analyzers/detectors per BHEL comment. HC shown in shown in d that in individual
in practice, HC detectors to be revised P&ID of HC floors(both
analyzers shown shown in P&ID Naphtha& detectors sides) and
gas forwarding
in the GA P&ID HSD firing as each fuel
area as per bidding drawing and not system.(dwg required forwarding
document in P&ID . No. 0-00- for area.
056-U8001) detecting
Hydrocar
bon on
each
fuel(Nap
htha,
NG,RFG
& HSD)
forwardi
ng
station(c
ommon
for all
burners)
and
control
station
for
individua
l burner
station
shall be
provided.
BHEL to
show
accordin
gly.
17. Flow control valve Tag no. FV- Noted Point -- -- --- --
at refinery fuel gas 7902 indicated closed
RGV-7902 shall be in revised
28-JAN-2019
SADHNA SINGH (8424)
Page 6 of 24
tag as PV-7902 P&ID
18. BHEL has noted Point -- -- -- --
considered single Separate closed
drain valve for individual drain
upstream and valves shown in
revised P&ID
downstream of flow
control valve (FV-
7901 & FV-7902 for
NG & RFG
respectively)
Separate
individual drain
valve shall be
provided. For
control valve Refer
Cl. 9.8.2, page
88/115 of BEDB
part-B (A758-999-
02-41-ODB-1001).
BHEL to check and
confirm.
Shown in Not done. As discussed BHEL 2 nos. valves
19. Refer Cl. 9.8.2., page Complied As commented revised in the VC agreed to with blind
8/15 of BEDB part-B earlier those P&ID meeting provide flange are
(A758-999-02-41- drains and dated double provided for
vents shall be 09/10/18, block all drains and
ODB-1001)
provided with blind flanges and indicated in
Control valves double block indicated in break revised P&ID
bleed/vent, if and break revised flanges and
connected to flare, flanges. P&ID. as per connected to
needs to be provided tender closed system
with double block and need .
and Blinding to be
provided. connecte
d to
closed
system.
20 BHEL to clarify the Normal, Refer our For GT BHEL to BHEL-
HRSG operating minimum and earlier mode provide HPVP
mode/condition and maximum comment. for HRSG clarified in
steam flow for normal flows are BHEL to normal steam the meeting
& Max NG & refinery flow,GTG with EIL at
indicated in clarify the &
fuel gas flow. load, Visakhap-
revised P&ID HRSG maximu ambient atnam dated
BHEL to indicate
operating m conditions 30/10/18 as
Minimum NG &
mode/conditi NG&ref , GTG below:
refinery fuel gas
on and steam inery fuel for
mode/condition and
flow for fuel gas, min/nor/m
stem flow.
normal & steam ax NG Max. Fuel
Max NG & flow flow. The Flow: Fresh
refinery fuel will be same Air Firing &
gas flow. 185 parameter 185 TPH
s to be Steam
TPH.
provided generation
For for in HRSG
fresh air min/nor/m Normal
mode ax flow of Fuel Flow:
28-JAN-2019
SADHNA SINGH (8424)
Page 7 of 24
also, refinery GT
steam fuel gas Operating at
flow also. 100% Base
will be Load
(Ambient
less than
Condition-
185 36°C&80%
TPH. RH) & 185
TPH Steam
Generation
in HRSG
Min. Fuel
Flow: Min.
Turndown
of HRSG
Burners.
As per tender As per our Follow Please note that Please look For fuel gas As per We will
21. document (Refer standard tender flow instruments into the flow tender, raise
cl. 6.6.4, page practice, require requirements are clause measurement, mass flow deviation
41/15 of BEDB we have ment given under Clause properly we shall meter to be permit
part-B considered 9.4 of Basic which provide flow provided. separately.
(A758-999-02- flow engineering design states” Mass orifice
ODB0-1001) orifice for basis. As per clause flow meter assembly only
mass flow meter gas flow 4 & 7 of 9.4.2, for fuel gas as per clause
shall be provided measureme mass flow meters and fuel oil 4& 7 of 9.4.2
for fuel line. nt, flow are indicated for lines”. of Design
BHEL to check orifice is fuel oil lines and Accordingly basis. We
and confirm. sufficient. highly viscous tender shall initiate
Please service only. We requirement Deviation to
accept. have considered to be Cl.6.6.4 of
accordingly mass complied. page 41/15 of
flow meters foe fuel BEDB Part-B.
oil lines as per the Kindly
requirements accept.
specified and as per
our normal practice.
For fuel gas service
flow measurement
using flow orifices
is standard practice
and superior to
mass flow meter
with regard to
availability and
maintenance
aspects. There will
not be any effect in
steam pressure
28-JAN-2019
SADHNA SINGH (8424)
Page 8 of 24
control because of
using mass flow
meters in place of
flow orifices. We
request EIL to
accept Flow orifices
for fuel gas flow
measurement.
BHEL to refer Complied Not Complied in revised -- -- --- ---
22. Standard symbol compli P&ID
and Nomenclature ed.
P&ID BHEL
(P&ID no. A758- to
79-41-00-1192) follow
for sample tender
connection require
details. ment
Refer Line Corrected noted Point closed -- -- --- --
23. No. 14”-FG- in revised
606-7901-A1A P&ID
& 12”-NG-
606-7901-A1A,
Isolation at
upstream of
spectacle joint
shall be
provided. BHEL
to check and
clarify
Refer Line Corrected noted Point closed -- -- -- ---
24. No. 1”-IG- in revised
606-7901-A1A P&ID
& 1”-IG-606-
7902-A1A,
Isolation at
upstream of
spectacle joint
shall be
provided. BHEL
to check and
clarify.
Line designation For noted Point closed -- -- -- --
25. for both natural differentiat
gas and refinery ing NG
fuel gas shall be and
FG. refinery
Accordingly Line fuel gas
no. shall be lines,
provided. different
line
designatio
ns are
shown.
EIL agreed
in the
meeting
28-JAN-2019
SADHNA SINGH (8424)
Page 9 of 24
Line numbers of Corrected Still In the connecting Reducers to In the latest -- Point closed.
26. RLNG and in revised not P&ID also, NG be shown as P&ID by
refinery fuel gas P&ID correct &FG are used for per line sizes BHEL,
lines to be ed RLNG and refinery of Hyderabad,
fuel gas. The same connecting line size of
corrected wrt
are followed by us. P&IDs for NG is 12”and
connecting The line numbers Natural gas line size of
P&IDs. are given as per and Refinery RFG is 12”.
numbering fuel gas. Hence,
philosophy. expander for
RFG is shown
in our revised
P&ID.
Normal/minimu Complied Not done. Corrected in -- Point closed.
27. m/maximum Corrected Normal revised P&ID.
temperature/pres in revised pressur Our values are
sure/flow of P&ID e for given to
refinery BHEL_PESD,
RLNG and
gas to Hyderabad to
refinery fuel be revise in their
gas to be correct connecting
mentioned at ed wrt P&ID.
battery limit. connect
There is ing
mismatch wrt to PID.
connecting
P&IDs.
Refer B/L Steam BHEL Complied --- -- --- --
28. P&ID tracing is to
(B016- required follow
02-43- for high as per
tender.
606- Viscous
Same is
1111), liquid already
steam fuels. For shown
tracing to gaseous in
be fuels, BHEL
provided Steam connect
for the tracing is ing
refinery not P&ID.
fuel gas required Same
as the was
line upto
also
burner. Fuel will
discuss
Line be freely ed in
number to flowing meetin
be without g
Corrected any
according Stagnatio
ly n. Please
accept.
Refer 2 SOVs Noted Point closed -- -- --- --
29. Note- 31 will be
of given
General parallel
note & for each
typical MTV.
Details
28-JAN-2019
SADHNA SINGH (8424)
Page 10 of 24
(A758-
79-41-00-
1192)
Double
solenoid
valve
shall be
provided
for
MTV
(UV-
7901UV-
7905).
28-JAN-2019
SADHNA SINGH (8424)
Page 11 of 24
1.No further technical comments.
2. All applicable HAZOP recomendations shall be incorporated.
3. BHEL to first get approval from HPCL/EIL on it's deviation with
respect to combination firing and after getting the same resubmit the
P&ID.
4. As commented earlier, BHEL to provide mass flow meter in natural gas
and refinery fuel gas as per tender. BHEL deviation is not acceptable.
5. BHEL to provide pressure gauge in between NRV 7906 and isolation valve
BLV 7919 on Nitrogen line (3/4"-IG-606-7903-A1K) connected to pilot gas
(RLNG) in line with other similar connections.
28-JAN-2019
SADHNA SINGH (8424)
Page 12 of 24
Please refer attached file
28-JAN-2019
SADHNA SINGH (8424)
Page 13 of 24
EIL Comment : 1. P&IDs shall be updated based on comments given during Hazop study meeting incorporating Hazop recommendation and instrumentation comment.
INTERLOCK SUMMARY
28-JAN-2019
SADHNA SINGH (8424)
Page 14 of 24
CLIENT : M/s HPCL EIL Job No.
PLANT : CPP BHEL Transmittal/Letter
CONTRACTOR : M/s BHEL no:
28-JAN-2019
SADHNA SINGH (8424)
Page 15 of 24
4 Refer Cl. No. 3.2.2 We have Comment if Noted Combinat In the VC As per Please refer
of design bases considered 8 any will be ion firing meeting tender BHEL reply
(B016-606-02-43- nos. burners. provided with of fuels dtd.09/10/1 combina dtd.25/10/
DB-01), combination Also at a time, write up. to be 8, BHEL tion 18.
firing of (0-100%) of one fuel will be consider informed firing Deviation
any gaseous and fired in one ed. that shall be permit in
liquid fuel is to be burner. Hence, combinatio provided proper
provided. Minimum the minimum n firing of .If BHEL format will
quantity shall be quantity of gas fuels in don’t be raised.
based on turndown that can be different provide
of burner so fired approx. burners is the
accordingly fuel from 2% of MCR possible by same,
0% to turndown limit and minimum sending BHEL to
of burner can’t be quantity of oil gaseous raise
utilised. BHEL to that can be fuel in deviatio
confirm and provide fired will be some n in
write- up meeting approx. 4% of burners proper
the requirement. MCR. Hence, and liquid format
the system fuel in with
designed is in other technica
line with the burners. l
process EIL justificati
requirement informed on.
considering that this
limitation of point will
burner be taken
turndown. The up with
detailed write- Customer
up will be by EIL and
provided will revert
shortly. back.
5 Refer Cl. No. 3.2.2 Point -- -- Same Same as
of CPP-Design Confirmed. noted closed as point point 4
Basis (B016-606-02- The system 4
43-DB-01), During will take care
combination firing, all normal
outage of one fuel disturbances.
other will take-up Detailed write-
the full load up will be
during GTG provided
exhaust as well shortly
as fresh air firing
load and parameters.
BHEL to confirm
and provide write-up
meeting the
requirement. BHEL
to ensure that
all eventuality is
to be considered
while designing the
system
28-JAN-2019
SADHNA SINGH (8424)
Page 16 of 24
Refer Note – 9 , Please refer Pl see
6. fuel selection enclosed Past “BHEL Detailed Please
BHEL to provide reference of Reply to write-up refer Note
sheet point to be 9 in the -- Point
past reference the same to no.6.
be provided. submitte P&ID for closed.
where scheme of dtd.16/8/ d. various
such multi fuel 18”given
permutatio
firing system has i. During below
n and
been provided. auto control combinatio
BHEL to clarify the whether n of
following i. priority of operating
sequence of fuel fuel can be scenario.
when burner is in changed by
auto is not clear. operator?
BHEL to provide -As
write with clarity ii. mentioned if
When all burners NG, RG,
are not in auto and Naphtha
on single fuel. selected
During such ,naphtha will
scenario outage of be under
main fuel may lead active
to trip[ the HRSG control.
outlet / steam However as
temperature. iv. Is per note 9 of
it possible to run P&ID,only 3
with all burners in selector
auto mode? If yes, switch
BHEL to clarify position ie.,
during such only gas,only
scenario if few liquid
burners are on oil oil&gas.BHE
firing mode, which L to clarify
control valve shall whether two
be in action in gases and
case of fuel only liquid
demand changes. fuel or vice
V BHEL to versa can
provide write-up also be
with all selected.
permutation and ii. Not
combination of clarified in
operating scenario enclosed
and its. Vi. sheet wrt
BHEL to clarify HRSG
whether any one tripping
of gas (RING or iii. Not
refinery fuel gas) clarified in
and any of the enclosed
liquid fuels (HSD sheet
or naphtha) can be wrt HRSG
fired outlet steam
simultaneously in parameters
an individual V. To be
burner. provided
28-JAN-2019
SADHNA SINGH (8424)
Page 17 of 24
7. Detail X, Y &Z is not Reflected in The same to Shown in -- -- --- --
applicable to this revised P&ID be shown in concerne
drawing. The same concerned d P&ID
shall be reflected to P&ID
where it is applicable.
28-JAN-2019
SADHNA SINGH (8424)
Page 18 of 24
Speck break shall be a
NRV outlet
(downstream from
gaseous fuel side)
Natural gas drain Natural gas and Point -- -- -- --
13. lines has MOC as fuel gas drain noted closed
A1K while refinery lines MOC is
fuel gas drain lines A1K. Corrected
in revised P&ID
have MOC A1A.
BHEL to check
14. Drains to be shown Location of Drains -- -- --- -
in strainers. Complied drain to be provided
checked at the
outlet of
strainers
Gaseous fuel vent Point -- -- --- -
15. shall be free Indicated in Noted closed
draining to flare revised P&ID
header and shall
have no pocket.
BHEL to provide HC Not done HC BHEL HC detectors
16. HC Complied. As Refer client detectors detectors confirme are provided
analyzers/detectors per BHEL comment. HC shown in shown in d that in individual
in practice, HC detectors to be revised P&ID of HC floors(both
analyzers shown shown in P&ID Naphtha& detectors sides) and
gas forwarding
in the GA P&ID HSD firing as each fuel
area as per bidding drawing and not system.(dwg required forwarding
document in P&ID . No. 0-00- for area.
056-U8001) detecting
Hydrocar
bon on
each
fuel(Nap
htha,
NG,RFG
& HSD)
forwardi
ng
station(c
ommon
for all
burners)
and
control
station
for
individua
l burner
station
shall be
provided.
BHEL to
show
accordin
gly.
17. Flow control valve Tag no. FV- Noted Point -- -- --- --
at refinery fuel gas 7902 indicated closed
RGV-7902 shall be in revised
28-JAN-2019
SADHNA SINGH (8424)
Page 19 of 24
tag as PV-7902 P&ID
18. BHEL has noted Point -- -- -- --
considered single Separate closed
drain valve for individual drain
upstream and valves shown in
revised P&ID
downstream of flow
control valve (FV-
7901 & FV-7902 for
NG & RFG
respectively)
Separate
individual drain
valve shall be
provided. For
control valve Refer
Cl. 9.8.2, page
88/115 of BEDB
part-B (A758-999-
02-41-ODB-1001).
BHEL to check and
confirm.
Shown in Not done. As discussed BHEL 2 nos. valves
19. Refer Cl. 9.8.2., page Complied As commented revised in the VC agreed to with blind
8/15 of BEDB part-B earlier those P&ID meeting provide flange are
(A758-999-02-41- drains and dated double provided for
vents shall be 09/10/18, block all drains and
ODB-1001)
provided with blind flanges and indicated in
Control valves double block indicated in break revised P&ID
bleed/vent, if and break revised flanges and
connected to flare, flanges. P&ID. as per connected to
needs to be provided tender closed system
with double block and need .
and Blinding to be
provided. connecte
d to
closed
system.
20 BHEL to clarify the Normal, Refer our For GT BHEL to BHEL-
HRSG operating minimum and earlier mode provide HPVP
mode/condition and maximum comment. for HRSG clarified in
steam flow for normal flows are BHEL to normal steam the meeting
& Max NG & refinery flow,GTG with EIL at
indicated in clarify the &
fuel gas flow. load, Visakhap-
revised P&ID HRSG maximu ambient atnam dated
BHEL to indicate
operating m conditions 30/10/18 as
Minimum NG &
mode/conditi NG&ref , GTG below:
refinery fuel gas
on and steam inery fuel for
mode/condition and
flow for fuel gas, min/nor/m
stem flow.
normal & steam ax NG Max. Fuel
Max NG & flow flow. The Flow: Fresh
refinery fuel will be same Air Firing &
gas flow. 185 parameter 185 TPH
s to be Steam
TPH.
provided generation
For for in HRSG
fresh air min/nor/m Normal
mode ax flow of Fuel Flow:
28-JAN-2019
SADHNA SINGH (8424)
Page 20 of 24
also, refinery GT
steam fuel gas Operating at
flow also. 100% Base
will be Load
(Ambient
less than
Condition-
185 36°C&80%
TPH. RH) & 185
TPH Steam
Generation
in HRSG
Min. Fuel
Flow: Min.
Turndown
of HRSG
Burners.
As per tender As per our Follow Please note that Please look For fuel gas As per We will
21. document (Refer standard tender flow instruments into the flow tender, raise
cl. 6.6.4, page practice, require requirements are clause measurement, mass flow deviation
41/15 of BEDB we have ment given under Clause properly we shall meter to be permit
part-B considered 9.4 of Basic which provide flow provided. separately.
(A758-999-02- flow engineering design states” Mass orifice
ODB0-1001) orifice for basis. As per clause flow meter assembly only
mass flow meter gas flow 4 & 7 of 9.4.2, for fuel gas as per clause
shall be provided measureme mass flow meters and fuel oil 4& 7 of 9.4.2
for fuel line. nt, flow are indicated for lines”. of Design
BHEL to check orifice is fuel oil lines and Accordingly basis. We
and confirm. sufficient. highly viscous tender shall initiate
Please service only. We requirement Deviation to
accept. have considered to be Cl.6.6.4 of
accordingly mass complied. page 41/15 of
flow meters foe fuel BEDB Part-B.
oil lines as per the Kindly
requirements accept.
specified and as per
our normal practice.
For fuel gas service
flow measurement
using flow orifices
is standard practice
and superior to
mass flow meter
with regard to
availability and
maintenance
aspects. There will
not be any effect in
steam pressure
28-JAN-2019
SADHNA SINGH (8424)
Page 21 of 24
control because of
using mass flow
meters in place of
flow orifices. We
request EIL to
accept Flow orifices
for fuel gas flow
measurement.
BHEL to refer Complied Not Complied in revised -- -- --- ---
22. Standard symbol compli P&ID
and Nomenclature ed.
P&ID BHEL
(P&ID no. A758- to
79-41-00-1192) follow
for sample tender
connection require
details. ment
Refer Line Corrected noted Point closed -- -- --- --
23. No. 14”-FG- in revised
606-7901-A1A P&ID
& 12”-NG-
606-7901-A1A,
Isolation at
upstream of
spectacle joint
shall be
provided. BHEL
to check and
clarify
Refer Line Corrected noted Point closed -- -- -- ---
24. No. 1”-IG- in revised
606-7901-A1A P&ID
& 1”-IG-606-
7902-A1A,
Isolation at
upstream of
spectacle joint
shall be
provided. BHEL
to check and
clarify.
Line designation For noted Point closed -- -- -- --
25. for both natural differentiat
gas and refinery ing NG
fuel gas shall be and
FG. refinery
Accordingly Line fuel gas
no. shall be lines,
provided. different
line
designatio
ns are
shown.
EIL agreed
in the
meeting
28-JAN-2019
SADHNA SINGH (8424)
Page 22 of 24
Line numbers of Corrected Still In the connecting Reducers to In the latest -- Point closed.
26. RLNG and in revised not P&ID also, NG be shown as P&ID by
refinery fuel gas P&ID correct &FG are used for per line sizes BHEL,
lines to be ed RLNG and refinery of Hyderabad,
fuel gas. The same connecting line size of
corrected wrt
are followed by us. P&IDs for NG is 12”and
connecting The line numbers Natural gas line size of
P&IDs. are given as per and Refinery RFG is 12”.
numbering fuel gas. Hence,
philosophy. expander for
RFG is shown
in our revised
P&ID.
Normal/minimu Complied Not done. Corrected in -- Point closed.
27. m/maximum Corrected Normal revised P&ID.
temperature/pres in revised pressur Our values are
sure/flow of P&ID e for given to
refinery BHEL_PESD,
RLNG and
gas to Hyderabad to
refinery fuel be revise in their
gas to be correct connecting
mentioned at ed wrt P&ID.
battery limit. connect
There is ing
mismatch wrt to PID.
connecting
P&IDs.
Refer B/L Steam BHEL Complied --- -- --- --
28. P&ID tracing is to
(B016- required follow
02-43- for high as per
tender.
606- Viscous
Same is
1111), liquid already
steam fuels. For shown
tracing to gaseous in
be fuels, BHEL
provided Steam connect
for the tracing is ing
refinery not P&ID.
fuel gas required Same
as the was
line upto
also
burner. Fuel will
discuss
Line be freely ed in
number to flowing meetin
be without g
Corrected any
according Stagnatio
ly n. Please
accept.
Refer 2 SOVs Noted Point closed -- -- --- --
29. Note- 31 will be
of given
General parallel
note & for each
typical MTV.
Details
28-JAN-2019
SADHNA SINGH (8424)
Page 23 of 24
(A758-
79-41-00-
1192)
Double
solenoid
valve
shall be
provided
for
MTV
(UV-
7901UV-
7905).
28-JAN-2019
SADHNA SINGH (8424)
Page 24 of 24