Sr.No.

Work Work front Floor


Internal Flat block work 17th
Internal Flat block work 18th
Duct side parapet wall Terrace
Front side Elevation Part Terrace
1 Block work Back side staircse Block work Stilt to 18th
LMR Top Terrace Block work Terrace
Stilt floor lobby Stilt
Staircase Head room upto OHWT Terrace
Lift front wall (4 lift) Stilt to 18th

2 Plaster Back coat to external wall in flat 17th


Back coat to external wall in flat 18th
Parapet wall Terrace
External Plaster (Incl. Elevation) Front
External Plaster (Incl. Elevation) Back
Stilt Floor Column Stilt
Toilet Plumbing groove finishing 13 to 15th

3 Gypsum Plaster Internal Flats 16th


Internal Flats 17th
Internal Flats 18th
Lobby 17th
Lobby 18th
Skirting Butt Finishing 9th
Fire Staircase (front side) 13 to 18th
Fire Staircase (back side) Stilt to 18th

4 Waterproofing All Toilets 15 to 18th


Terrace and Dry Balcony 15 to 18th
% Balance
15%
70%
50%
80%
100%
100%
25%
100%
100%

20%
100%
80%
60%
40%
90%
100%

50%
100%
100%
80%
100%
100%
100%
100%

100%
100%
RFI Detail

Client

Structure
Work Type

Group
Drawing No

Checker Representing
RFI No

Status

 Maker  Entered  Entered  Question  Answer  Remark  Image1  Image2  Checker


Date Time
 Round (1)
 Vithal  16/01/201  10:57 AM  Level and  Conformit  Narendra
Gaikwad 9 flatness of y Patil
erected
slab
shuttering
ok

 Vithal  16/01/201  10:58 AM  Beam  Conformit  Narendra


Gaikwad 9 widths and y Patil
depths,
spacings
and
bottom
levels ok

 Vithal  16/01/201  10:58 AM  Tie bolts  Conformit  Narendra


Gaikwad 9 (if y Patil
specified)
for beams
ok (Type
and
spacing)
 Vithal  16/01/201  10:58 AM  Beam  Conformit  Narendra
Gaikwad 9 bottom y Patil
forms
satisfactor
y (material
and
thickness)

 Vithal  16/01/201  10:59 AM  Runners  Conformit  Narendra


Gaikwad 9 and y Patil
Vertical
Struts for
beam sides
(material,
sizes and
spacings)
correct
and well
tightened

 Vithal  16/01/201  10:59 AM  Adequate  Conformit  Narendra


Gaikwad 9 inclined y Patil
supports
for beam
sides
provided

 Vithal  16/01/201  10:59 AM  Gabdi  Conformit  Narendra


Gaikwad 9 level y Patil
maintaine
d
(excessive
Gabdi
avoided)

 Vithal  16/01/201  10:59 AM  All props  Conformit  Narendra


Gaikwad 9 in good y Patil
condition
with
correct
spacing

 Vithal  16/01/201  10:59 AM  Horizontal  Conformit  Narendra


Gaikwad 9 bracing y Patil
provided
in both
directions
and well
tied to
props

 Vithal  16/01/201  10:59 AM  Cross  Conformit  Narendra


Gaikwad 9 bracings y Patil
provided
correctly
and well
tied
 Vithal  16/01/201  10:59 AM  All  Conformit  Narendra
Gaikwad 9 shuttering y Patil
material
and
componen
ts in
satisfactor
y condition
and
cleaned

 Vithal  16/01/201  10:59 AM  Release  Conformit  Narendra


Gaikwad 9 agent ok y Patil
and
application
is correct

 Vithal  16/01/201  10:59 AM  Top level  Conformit  Narendra


Gaikwad 9 of y Patil
concrete
marked /
ensured

 Vithal  16/01/201  11:00 AM  Formwork  Conformit  Narendra


Gaikwad 9 gaps y Patil
sealed
properly

 Vithal  16/01/201  11:00 AM  Any other  Conformit  Narendra


Gaikwad 9 observatio y Patil
n

Client

Structure
Work Type

Group

Drawing No

Checker Representing
RFI No

Status

 Maker  Entered  Entered  Question  Answer  Remark  Image1  Image2  Checker


Date Time
 Round (1)
 Vithal  18/01/201  10:40 AM  Rebars for  Conformit  Narendra
Gaikwad 9 slab y Patil
portion -
dia and
spacing as
per
drawing
and all
rebars
staight and
free of rust

 Vithal  18/01/201  10:40 AM  Junctions  Conformit  Narendra


Gaikwad 9 of all criss y Patil
crosssing
bars tied
correctly
to avoid
displaceme
nt

 Vithal  18/01/201  10:40 AM  Rebars in  Conformit  Narendra


Gaikwad 9 beams -- y Patil
Nos, dia
and
spacing as
per
drawing
with
spacing
assured

 Vithal  18/01/201  10:40 AM  All laps  Conformit  Narendra


Gaikwad 9 provided y Patil
at correct
locations
with
adequate
over
lapping

 Vithal  18/01/201  10:40 AM  Stirrups in  Conformit  Narendra


Gaikwad 9 beams and y Patil
embedded
column
portion
provided
as per dwg
and tied
correctly
 Vithal  18/01/201  10:40 AM  Bent up  Conformit  Narendra
Gaikwad 9 bars y Patil
provided
as per dwg
with
adequate
supporting
chairs

 Vithal  18/01/201  10:40 AM  Adequate  Conformit  Narendra


Gaikwad 9 projecting y Patil
rebars
provided
near
Constructi
on Joint

 Vithal  18/01/201  10:40 AM  At beam  Conformit  Narendra


Gaikwad 9 column y Patil
junction
beam bars
taken
inside
column
bars

 Vithal  18/01/201  10:40 AM  Projecting  Conformit  Narendra


Gaikwad 9 column y Patil
bars well
tied with
stirrups to
keep in
plumb

 Vithal  18/01/201  10:40 AM  Inserts  NA  Narendra


Gaikwad 9 provided Patil
as per dwg

 Vithal  18/01/201  10:40 AM  Adequate  Conformit  Narendra


Gaikwad 9 cover y Patil
blocks
provided
for beam
sides and
slab
bottom
and no
congestion
of
reinforcem
ent
observed

 Vithal  18/01/201  10:41 AM  Any other  Conformit  Narendra


Gaikwad 9 observatio y Patil
n
Client

Structure
Work Type

Group

Drawing No

Checker Representing
RFI No

Status

 Maker  Entered  Entered  Question  Answer  Remark  Image1  Image2  Checker


Date Time
 Round (1)
 Vithal  19/01/201  11:27 AM  Arrangem  Conformit  Rushikesh
Gaikwad 9 ents made y Kadgaonka
for r
maintainin
g
uninterrup
ted
concreting

 Vithal  19/01/201  11:27 AM  Pour card  Conformit  Rushikesh


Gaikwad 9 available y Kadgaonka
at site and r
filled
satisfactori
ly

 Vithal  19/01/201  11:27 AM  Vibrator,  Conformit  Rushikesh


Gaikwad 9 Slump y Kadgaonka
Cone with r
Tamping
rod &
Cube
Moulds
available
at site

 Vithal  19/01/201  11:27 AM  Mixer &  NA  Rushikesh


Gaikwad 9 Weigh Kadgaonka
Batcher in r
proper
condition
and placed
properly
 Vithal  19/01/201  11:28 AM  Site Mix  NA  Rushikesh
Gaikwad 9 Concrete Kadgaonka
made as r
per Mix
Design
with
moisture
correction

 Vithal  19/01/201  11:28 AM  RMC  Conformit  Rushikesh


Gaikwad 9 received y Kadgaonka
and r
delivered
as per
norms

 Vithal  19/01/201  11:28 AM  Concrete  Conformit  Rushikesh


Gaikwad 9 poured / y Kadgaonka
pumped r
and
vibrated
correctly
before
setting

 Vithal  19/01/201  11:28 AM  No  Conformit  Rushikesh


Gaikwad 9 leakages y Kadgaonka
observed r
through
form work
gaps

 Vithal  19/01/201  11:28 AM  Concretin  Conformit  Rushikesh


Gaikwad 9 g carried y Kadgaonka
out to r
correct
level and
trowelling
of top
surface
done
satisfactori
ly

 Vithal  19/01/201  11:28 AM  Cubes cast  Conformit  Rushikesh


Gaikwad 9 as agreed y Kadgaonka
r

 Vithal  19/01/201  11:28 AM  Any other  Conformit  Rushikesh


Gaikwad 9 observatio y Kadgaonka
n r
: Konark Project : Konark
Builders Virtue
: Tower 4 Stage : Floor 9
: Stage/Floo Check List : Slab
r Wise
: Formwork Coverage : part 1st
: 150006 Maker : G.N Infra
Representi Projects
ng
: Konark Builders
: KNB/KN Raised : ###
V/T4/1838 Date
-1/4
: Cleared   within 3 day

 Checked  Checked  Answer  Remark  Image1  Image2


Date Time

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9
 18/01/201  10:06 AM  Ok
9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9
 18/01/201  10:06 AM  Ok
9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

 18/01/201  10:06 AM  Ok


9

: Konark Project : Konark


Builders Virtue
: Tower 4 Stage : Floor 9
: Stage/Floo Check List : Slab
r Wise
: Reinforce Coverage : part 1st
ment
: 150006 Maker : G.N Infra
Representi Projects
ng
: Konark Builders
: KNB/KN Raised : ###
V/T4/1838 Date
-2/4
: Cleared   within 1 day

 Checked  Checked  Answer  Remark  Image1  Image2


Date Time
 18/01/201  10:52 AM  Ok
9

 18/01/201  10:52 AM  Ok


9

 18/01/201  10:52 AM  Ok


9

 18/01/201  10:52 AM  Ok


9

 18/01/201  10:52 AM  Ok


9
 18/01/201  10:52 AM  Ok
9

 18/01/201  10:52 AM  Ok


9

 18/01/201  10:52 AM  Ok


9

 18/01/201  10:53 AM  Ok


9

 18/01/201  10:53 AM  Ok


9

 18/01/201  10:53 AM  Ok


9

 18/01/201  10:53 AM  Ok


9
: Konark Project : Konark
Builders Virtue
: Tower 4 Stage : Floor 9
: Stage/Floo Check List : Slab
r Wise
: During Coverage : part 1st
Concreting

: 150006 Maker : G.N Infra


Representi Projects
ng
: Konark Builders
: KNB/KN Raised : ###
V/T4/1838 Date
-3/4
: Cleared   within 1 day

 Checked  Checked  Answer  Remark  Image1  Image2


Date Time

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9
 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9

 19/01/201  Ok
9