Prepared by: ABDELHADI Amine 00384828 abdelhadi.amine@huawei.

com
Approved by : Li Hui l00214892 evan.lihui@huawei.com
Version:V1.0 (November 2018)
HUAWEI TECHNOLOGIES CO., LTD. www.huawei.com
01 Installation preparation
01-01 Installation tools check
Photo
01 The required tools Sample

screwdriver pliers Adjustable wrench Clamp


Electric driller Hammer Measuring tape Level instrument
multimeter

ladder Marker Pipe cutter


Expander Pressure gauge Vacuum pump
Page 3 HUAWEI TECHNOLOGIES CO., LTD.
03 D.G. Installation
03-01 New D.G. fixation
01 The DG installation overall

Left side Right side

Page 5 HUAWEI TECHNOLOGIES CO., LTD.


03-02 New D.G. dismantle transport protection bracket
01 Bracket dismantled(red color)
Radiator Front view Radiator rear view

Remark: member to fix back radiator screws after bracket removed

Page 6 HUAWEI TECHNOLOGIES CO., LTD.


03-03 New D.G. auxiliary
01 Coolant

Page 7 HUAWEI TECHNOLOGIES CO., LTD.


03-03 New D.G. auxiliary
02 Oil

45L Oil on site

Page 8 HUAWEI TECHNOLOGIES CO., LTD.


03-03 New D.G. auxiliary
03 Fuel

300 L

Remark:
Page 9 make sure fuel tank is filled at least 300L
HUAWEI TECHNOLOGIES CO., LTD.
03-04 New or reuse D.G. Power cable connection and labeling
01 DG battery charger cable

New DG Reuse DG

Page 10 HUAWEI TECHNOLOGIES CO., LTD.


03-04 New or reuse D.G. Power cable connection and labeling
02 DG Heater power cable

L: Phase
N: Neutre

New DG Reuse DG

Page 11 HUAWEI TECHNOLOGIES CO., LTD.


03-05 New or reuse .D.G signal cable connection and labeling
01 DG communication cable
For Reuse DG
use twisted cable RJ-45

New DG Reuse DG

Page 12 HUAWEI TECHNOLOGIES CO., LTD.


04 ICC Cabinet Installation
04-01 ICC cabinet installation
01 The ICC cabinet (door open)

Outdoor Indoor
Page 14 HUAWEI TECHNOLOGIES CO., LTD.
04-01 ICC cabinet installation
02 The ICC cabinet(door close)

Outdoor Indoor

Page 15 HUAWEI TECHNOLOGIES CO., LTD.


04-04 ECC500S installation
01 ECC500S

Page 16 HUAWEI TECHNOLOGIES CO., LTD.


04-05 Inverter:DJN1000/DJN3000 installation
01 Inverter overview

DJN1000 DJN3000

Page 17 HUAWEI TECHNOLOGIES CO., LTD.


04-06 PVDU60/PVDU200 installation Solar

01PVDU60/PVDU200 overview

PVDU60 PVDU200

Page 18 HUAWEI TECHNOLOGIES CO., LTD.


04-07 ATS installation
01 ATS open cover

To DCDU
To
Mains

To DG
To TGBT

GND

To SMU CAN

Page 19 HUAWEI TECHNOLOGIES CO., LTD.


04-08 DGHCU installation
01 DGHCU overview

To Inverter

To BCU
Gro
undi
ng To UIM
ALM2
To ACDU

Page 20 HUAWEI TECHNOLOGIES CO., LTD.


04-09 ACDU-125 installation
01 ACDU-125 open cover

To DGHCU
AC output

Neutre

To UIM
To DG Power DIN06
heater

Page 21 HUAWEI TECHNOLOGIES CO., LTD.


04-10 Lithium battery(ESM-4850A1) installation Only: Grid-Battery V2

01 Lithium battery overview

GND Battery cable


Power + _

RJ45

Page 22 HUAWEI TECHNOLOGIES CO., LTD.


05 Battery Installation
05-01 Battery cabinet/Rack installation
01 The battery cabinet/Rack(Door open)

Copper bar

Indoor Outdoor

Page 24 HUAWEI TECHNOLOGIES CO., LTD.


05-01 Battery cabinet/Rack installation
02 The battery cabinet/Rack(Door close)
Front Rear

Indoor Outdoor

Page 25 HUAWEI TECHNOLOGIES CO., LTD.


05-02 Signal cable connection and labeling
01 Battery cabinet cooling signal cable and label

Type Type Type


01 02 03

Page 26 HUAWEI TECHNOLOGIES CO., LTD.


06 DC Air conditioner Installation
06-01 DC A/C installation overview
01 The indoor unit

Use PVC for Power cables,


Alarm and GND

Pipes output hole should not be


behind the split unit

Page 28 HUAWEI TECHNOLOGIES CO., LTD.


06-01 DC A/C installation overview
02 The outdoor unit Route pipes straight and secure them closely to the wall.
Seal cracks by applying sealing mud neatly.

Priority 01 Priority 02
Fix on concrete if space available Fix on Wall

Page 29 HUAWEI TECHNOLOGIES CO., LTD.


06-02 DC A/C exhaust the air in the copper pipe
01 The refrigerant exhaust air in pipe

1. Open thin copper valve half-way


2. Open Air outlet bonnet 1
3. Push the valve to exhaust air for 10 to 15 seconds
4. Fully open the valve plugs of the thick pipe valve and
thin pipe
5. Reinstall and tighten the bonnets

Page 30 HUAWEI TECHNOLOGIES CO., LTD.


06-03 DC A/C leakage test
01 Pipe connect position test

Outdoor unit Indoor unit

1- Apply soapy water around every connector.


2- Keep the soapy water on for at least 10 seconds. If bubbles appear, tighten the nuts.
3- After checking for refrigerant leaks, remove the soapy water from the copper pipes.

Page 31 HUAWEI TECHNOLOGIES CO., LTD.


06-04 DC A/C cable connection and labeling
01 The cables connection and labeling

Page 32 HUAWEI TECHNOLOGIES CO., LTD.


07 TS-3000 air condition installation
07-01 TS-3000 installation overview
01 The indoor unit

Shelter sealing

Drainage

Page 34 HUAWEI TECHNOLOGIES CO., LTD.


07-01 TS-3000 installation overview
02 The outdoor unit

• Cable tray or PVC


• Hole Sealing

TS pipes must be always down

Page 35 HUAWEI TECHNOLOGIES CO., LTD.


07-02 TS-3000 exhaust the air in the copper pipe
01 The Exhaust with vacuum pump

1. Connect pump to outdoor valve


2. Pump out the air from both pipes

Page 36 HUAWEI TECHNOLOGIES CO., LTD.


07-03 TS-3000 leakage test
01 Open valve

1
2

TS Indoor unit TS Outdoor unit

Page 37 HUAWEI TECHNOLOGIES CO., LTD.


07-03 TS-3000 leakage test
02 Pipe connect position test

Page 38 HUAWEI TECHNOLOGIES CO., LTD.


07-04 TS-3000 cable connection and labeling
01 The cables connection and labeling

Power
XT1 DCDU 63A

Outdoor FAN
XT2  outdoor unit power

RS485
XT3  SCC800 COM2

Page 39 HUAWEI TECHNOLOGIES CO., LTD.


08 Smart site Installation
08-01 SCC800 controller installation
01 SCC800 overview

Grounding

Page 41 HUAWEI TECHNOLOGIES CO., LTD.


08-02 Indoor infrared sensor installation
01 Indoor infrared sensor

Page 42 HUAWEI TECHNOLOGIES CO., LTD.


08-03 Environment sensors installation
01 Temperature/Humidity sensor

Page 43 HUAWEI TECHNOLOGIES CO., LTD.


08-03 Environment sensors installation
02 Smoke sensor

Page 44 HUAWEI TECHNOLOGIES CO., LTD.


08-03 Environment sensors installation
03 Water sensor

PVC

Page 45 HUAWEI TECHNOLOGIES CO., LTD.


09 AC SPD Box Installation
09-01 AC SPD box installation
01 The AC SPD box open door

2x Grounding

Neutral

Page 47 HUAWEI TECHNOLOGIES CO., LTD.


09-01 AC SPD box installation
02 The AC SPD box close door

Page 48 HUAWEI TECHNOLOGIES CO., LTD.


10 Installation inspection
10-01 Bolt tighten inspection
01 The marked bolts of battery

Page 50 HUAWEI TECHNOLOGIES CO., LTD.


10-02 Entrance hole sealing
01 The sealed holes of cabinet/box

ICC200 Cabinet Battery rack

Page 51 HUAWEI TECHNOLOGIES CO., LTD.


11 Site cleaning
11-01 Site cleaning
01 Cleaning after Installation

Indoor Outdoor

Page 53 HUAWEI TECHNOLOGIES CO., LTD.


Thank you
www.huawei.com

Copyright©2015 Huawei Technologies Co., Ltd. All Rights Reserved.


The information in this document may contain predictive statements including, without limitation, statements regarding the future
financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual
results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such
information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the
information at any time without notice.

Page 54 HUAWEI TECHNOLOGIES CO., LTD.