STEEL B.B.S.

FOR BHUPINDER
Cutting
Dia of Total
Sl. Location Bar No of Length
Shape of Bar 1 2 3 4 5 Bar No. of Bar No. Remarks
No. of Bar Mkd. bend of Bar
(mm) of Bar
(inch)

` (inch.) (inch.) (inch.) (inch.) (inch.) items x bars f 8 f 10 f 12 f 16 f 20 f 25


A FOUNDATIONS

1 F-1 MAIN 2 12 53 12 10 76 1 X 11 11 69.7

DIST. 2 12 53 12 10 76 1 X 11 11 69.7

1 F-2 MAIN 2 12 56 12 10 79 3 X 12 36 237.0

DIST. 2 12 56 12 10 79 3 X 12 36 237.0

1 F-3 MAIN 2 12 62 12 10 85 2 X 13 26 184.2

DIST. 2 12 62 12 10 85 2 X 13 26 184.2

1 F-4 MAIN 2 12 68 12 10 91 3 X 14 42 318.5

DIST. 2 12 68 12 10 91 3 X 14 42 318.5

1 F-5 MAIN 2 12 74 12 10 97 1 X 15 15 121.3

DIST. 2 12 74 12 10 97 1 X 15 15 121.3

1 F-6 MAIN 2 12 81 12 10 104 1 X 17 17 147.3

DIST. 2 12 81 12 10 104 1 X 17 17 147.3

1 F-7 MAIN 2 12 66 12 10 89 1 X 16 16 118.7

DIST. 2 12 80 12 10 103 1 X 14 14 120.2

1 F-8 MAIN 2 12 74 12 10 97 1 X 18 18 145.5

DIST. 2 12 86 12 10 109 1 X 15 15 136.3


1 F-9 MAIN 2 12 20 12 10 43 4 X 9 36 129.0

DIST. 2 12 44 12 10 67 4 X 4 16 89.3

1 F-10 MAIN 2 12 32 12 10 55 1 X 14 14 64.2

DIST. 2 12 68 12 10 91 1 X 7 7 53.1

1 CF-1(Lift wall) MAIN 2 12 120 12 12 142 2 X 25 50 591.7

DIST. 2 12 122 12 12 144 2 X 24 48 576.0

4 RW-1 MAIN 2 12 144 12 10 167 1 X 41 41 570.6

DIST. 202 0 8 202 1 X 18 18 303.0

ADDITIONAL FOR LAP LENGTH 21.2 250.8 93.4 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR RETAINING WALL
TOTAL QUANTITY FOR RETAINING WALL
Total Steel Required
Foundation 1.2 MT
B COLUMNS (UPTO PLINTH)

1 C-1 (upto Plinth) 1 18 35 16 52 10 X 10 100 433.3

TIES a 4 6 15 6 8 46 10 X 9 90 345.0

4 6 7 6 8 30 10 X 9 90 225.0

2 0 15 0 8 35 10 X 9 90 262.5

2 C-2 (upto Plinth) 1 18 35 20 52 4 X 6 24 104.0

1 18 35 16 52 4 X 4 16 69.3

TIES a 4 6 15 10 8 50 4 X 9 36 150.0

4 6 7 6 8 30 4 X 9 36 90.0

2 0 15 0 8 35 4 X 9 36 105.0

ADDITIONAL FOR LAP LENGTH 94.2 0.0 0.0 40.2 10.4 0.0
TOTAL QUANTITY FOR COLUMNS (UPTO PLINTH)

Total Steel Required


Column (upto plinth) 0.5 MT

B COLUMNS ABOVE PLINTH


C-1 (PLINTH TO
1 BASEMENT 120 20 120 10 X 16 160 1600.0
ROOF)

TIES a 4 6 15 6 8 46 10 X 9 90 345.0

4 6 7 6 8 30 10 X 9 90 225.0
2 0 15 0 8 35 10 X 9 90 262.5

C-2 (PLINTH TO
2 135 20 135 4 X 6 24 270.0
BASEMENT ROOF

1 18 35 16 52 4 X 4 16 69.3

TIES a 4 6 15 10 8 50 4 X 9 36 150.0

4 6 7 6 8 30 4 X 9 36 90.0

2 0 15 0 8 35 4 X 9 36 105.0

ADDITIONAL FOR LAP LENGTH 82.4 0.0 0.0 5.5 187.0 0.0
TOTAL QUANTITY FOR COLUMNS (UPTO PLINTH)

Total Steel Required


Column (upto plinth) 1.8 MT

C PEDESTAL

1 C-1 (upto Plinth) 1 18 35 16 52 10 X 10 100 433.3

TIES a 4 12 21 12 8 70 10 X 5 50 291.7

4 12 13 12 8 54 10 X 5 50 225.0

2 0 21 0 8 47 10 X 5 50 195.8

2 C-2 (upto Plinth) 1 18 35 20 52 4 X 6 24 104.0

1 18 35 16 52 4 X 4 16 69.3

TIES a 4 12 21 10 8 68 4 X 5 20 113.3
4 12 13 12 8 54 4 X 5 20 90.0

2 0 21 0 8 47 4 X 5 20 78.3

ADDITIONAL FOR LAP LENGTH 79.5 0.0 0.0 40.2 10.4 0.0
TOTAL QUANTITY FOR COLUMNS (UPTO PLINTH)

Total Steel Required


Column (upto plinth) 0.5 MT
RETAINING WALL

1 RW-1 a 2 18 120 3 10 140 1 X 400 400 4666.7

b 2 18 120 3 10 140 1 X 334 334 3896.7

DIST. BARS c 2 6 2000 6 8 2011 1 X 12 12 2011.0

d 2 6 2000 6 8 2011 1 X 12 12 2011.0

B RW-2 a 2 18 120 3 10 140 1 X 123 123 1435.0

b 2 18 120 3 10 140 1 X 103 103 1201.7

DIST. BARS c 2 6 615 6 8 626 1 X 12 12 626.0

d 2 6 615 6 8 626 1 X 12 12 626.0

ADDITIONAL FOR LAP LENGTH 369.2 784.0 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR LIFT WALL
TOTAL QUANTITY FOR LIFT WALL

Total Steel Required Lift 3.1 MT

STITCH FLOOR
1 a 442 8 442 1 X 67 67 2467.8

a 535 8 535 1 X 56 56 2496.7

2 a 391 8 391 1 X 67 67 2183.1

a 121 8 121 1 X 56 56 564.7

ADDITIONAL FOR LAP LENGTH 539.9 0.0 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR STITCH FLOOR
TOTAL QUANTITY FOR STITCH FLOOR
Total Steel Required
Stitch Floor 1.0 MT
LIFT WALL UPTO PLINTH

1 LIFT WALL a 2 18 93 10 110 1 X 18 18 165.0

b 2 18 93 10 110 1 X 18 18 165.0

DIST. BARS c 2 6 121 6 8 132 1 X 12 12 132.0

d 2 6 121 6 8 132 1 X 12 12 132.0

ADDITIONAL FOR LAP LENGTH 18.5 23.1 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR LIFT WALL
TOTAL QUANTITY FOR LIFT WALL

Total Steel Required Lift 0.1 MT

LIFT WALL ABOVE PLINTH

1 LIFT WALL a 2 18 120 10 137 1 X 18 18 205.5

b 2 18 120 10 137 1 X 18 18 205.5

DIST. BARS c 2 6 121 6 8 132 1 X 15 15 165.0

d 2 6 121 6 8 132 1 X 15 15 165.0

ADDITIONAL FOR LAP LENGTH 23.1 28.8 0.0 0.0 0.0 0.0
TOTAL LENGTH REQUIRED FOR LIFT WALL
TOTAL QUANTITY FOR LIFT WALL

Total Steel Required Lift 0.1 MT


18460.4 16610.2 1261.1 1160.6 2285.8 0.0
5628.2 5064.1 384.5 353.9 696.9 0.0
0.395 0.617 0.888 1.580 2.469 3.858
2223.1 3124.5 341.4 559.1 1720.6 0.0
total weight kg 7968.8
add 2% for misllenious kg 159.38

total weight of steel req. kg 8128.2


total weight of steel req. mt 8.1281759714939
ESTIMATION STEEL QUANTITY ( SOHANA HOTEL)
DIA 8MM 10MM 12MM 16MM 20MM 25MM
QUANTITY 2223.1 3124.5 341.4 559.1 1720.6 0.0
WASTAGE (2%) 44.462555 62.490942 6.8282868 11.181776 34.41244 0
TOTAL QTY (KG) 2267.6 3187.0 348.2 570.3 1755.0 0.0
TOTAL QTY (TONNE) 2.27 3.19 0.35 0.57 1.76 0.00

TOTAL STEEL QTY. 8.13 TONNE