PREAMBLE
This design note has been prepared after the information received for P2 well
foundation in Dec 2011 as per following details:
The Final and Actual Tilt and Shift at Site as on Dec 2011 after cutting edge is
reached at final level, i.e. RL 14.7 m:
The various documents have been collected from site including the design
document, tilt and shift record, latest drawings (soft copy) and geo-technical
investigations.
The well foundation is found safe for the stability in longitudinal seismic as well
transverse seismic case. The steining stresses in reinforcement are safe and
within allowable limits of Fe500.
Page 1
Page 2
Design By : KM Job: Design of Pier Well Foundation, P2, Doc No. TTS/2012/DN/17, R0
Checked By: SP Kopili Bridge. Date: Dec, 2011.
DESIGN SUMMARY
Page 3
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Vertical Loads
1 Load From Super Structure
Live Load
3 Well Foundation
Page 4
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Moment at bearing level from super structure with 70R = 13.21 ton.m Annexure A
Moment due to braking at founding level = 1569.23 ton.m Annexure D
Moment at bearing level from super structure with class A = -35.84 ton.m Annexure A
Moment due to braking at founding level = 1363.08 ton.m Annexure D
3 From Foundation
Page 5
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
3 From Foundation
Page 6
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
2
= 61.74 + 0.00 = 61.74 T/m
2
Pallow = Allowable base pressure = 100 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 7
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
2
= 59.17 + 0.00 = 59.17 T/m
2
Pallow = Allowable base pressure = 100 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 8
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
2
= 62.20 + 0.00 = 62.20 T/m
2
Pallow = Allowable base pressure = 100 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 9
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
2
= 59.62 + 0.00 = 59.62 T/m
2
Pallow = Allowable base pressure = 100 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 10
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Annexure A
LOADS AND FORCES FROM SUPER STRUCTURE
Dead Load of PSC Box Girder, Left Span P2 to A2 Dead Load of PSC Box Girder, Right Span P2 to P1
C/C of span, Pier C/c = 37.810 m C/C of span, Pier C/c = 45.515 m
C/C of Bearing at Pier = 3.325 m C/C of Bearing at Pier = 3.325 m
C/C of Bearing of Super Structure = 34.485 m C/C of Bearing of Super Structure = 42.190 m
Maximum Depth of Super Structure = 2.500 m Maximum Depth of Super Structure = 2.500 m
Base width of Super Structure = 5.000 m Base width of Super Structure = 5.000 m
2
C/S Area at mid span = 5.600 m C/S Area at mid span = 5.600 m2
Distance of mid section from mid span = 9.051 m Distance of mid section from mid span = 12.903 m
2
C/S Area at Thickening = 7.760 m C/S Area at Thickening = 7.760 m2
Distance between thickened and mid span section = 4.892 m Distance between thickened and mid span section = 4.892 m
Distance of uniform thickened section = 3.900 m Distance of uniform thickened section = 3.900 m
2
C/S of slab = 3.588 m C/S of slab = 3.588 m2
Distance of uniform slab section = 1.038 m Distance of uniform slab section = 1.038 m
Weight of length considered = 37.760 m Weight of length considered = 45.465 m
3
Density of concrete = 2.500 ton/m Density of concrete = 2.500 ton/m3
Weight of Box Structure = 586.74 ton Weight of Box Structure = 694.61 ton
Weight of future stressing block = 11.37 ton Weight of future stressing block = 11.37 ton
Weight of End Diaphragm = 19.38 ton Weight of End Diaphragm = 19.38 ton
Weight of intermediate Diaphragm = 5.55 ton Weight of intermediate Diaphragm = 5.55 ton
Total Weight of Box Structure = 623.04 ton Total Weight of Box Structure = 730.91 ton
Dead Load Reaction of Box Structure = 311.52 ton Dead Load Reaction of Box Structure = 365.45 ton
SIDL Load intensity = 4.10 ton/m SIDL Load intensity = 4.10 ton/m
SIDL Reaction = 77.51 ton SIDL Reaction = 93.31 ton
Total Dead Load Reaction = 389.03 ton Total Dead Load Reaction = 458.76 ton
Page 11
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Live Load
70 R Wheeled (at Pier End) = 89.97 ton 70 R Wheeled (at Pier End) = 12.30 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at Pier End) for 1 lanes = 89.97 ton 70 R Wheeled (at Pier End) for 1 lanes = 12.30 ton
70 R Wheeled (at other End) = 10.03 ton 70 R Wheeled (at other End) = 53.70 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at other End) for 1 lanes = 10.03 ton 70 R Wheeled (at other End) for 1 lanes = 53.70 ton
Class A (at Pier End) = 44.30 ton Class A (at Pier End) = 20.22 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at Pier End) for 2 lanes = 88.60 ton Class A (at Pier End) for 2 lanes = 40.43 ton
Class A (at other End) = 11.10 ton Class A (at other End) = 23.78 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at other End) for 2 lanes = 22.20 ton Class A (at other End) for 2 lanes = 47.57 ton
Total DL + LL Reaction with Class 70R = 479.00 ton Total DL + LL Reaction with Class 70R = 471.06 ton
Total DL + LL Reaction with Class A = 477.63 ton Total DL + LL Reaction with ClassA = 499.19 ton
Page 12
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Annexure B
Weight of Pier Abutment Structure
3
Density of Concrete = 2.4 t/m HFL = 58.88 m
3
Density of Earth = 1.64 t/m LWL = 47.70 m
Sr. Description of Shape Nos. Area Depth Weight
No. Structure (A) m2 (D) m Tons
1 Piercap Rectangle 1 32.400 0.80 62.21
2 Piercap Piramid 1 23.400 0.70 39.31
3 Pier (HFL) Octagonal 1 13.542 11.472 221.42
4 (LWL) Octagonal 1 13.542 11.472 372.84
Total at (HFL) 322.94
Total at (LWL) 474.36
Page 13
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Annexure C
DESIGN OF WELL FOUNDATION P2
1 Bottom Plug
3
Density = 2.20 T/m
volume :- V1 = (Ab + Ad + Sqrt( Ab x Ad )) x Ht /3
= 96.77 m3
V2 = Ad x 0.6
= 15.31 m3
3
Total volume = 112.08 m
weight = 246.57 T
2 Sump (Add 15.00 % )
3
Total volume = 16.81 m
weight = 36.99 T
Page 14
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
3 Curb
3
Density = 2.50 T/m
3
volume = Ab x curb Ht. - Vplug + Ad x 0.3 = 51.90 m
weight = 129.74 T
4 Steining
3
Density = 2 50 t/m
2.50
height of steining = 28.34 m
3
Volume = 884.99 m
weight = 2212.46 T
5 Material filling
3
Density
y = 1.80 T/m
filling height = 12.84 m
3
Volume of filling = 327.67 m
weight of filling = 589.81 T
6 Water fill
3
Density = 1.00 T/m
filli height
filling h i ht = 14.90
14 90 m
weight of filling = 380.19 T
8 Wellcap
3
Density = 2.50 T/m
3
volume = 113.49 m
weight = 283.73 T
Page 15
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Weight of well structure above scour level (dry) including well cap = 1867.32 T
Weight of well structure above scour level (dry) excluding well cap = 1583.59 T
47.70 m
1
48 00
48.00
14.79 m
14.70 m
Page 16
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Page 17
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure D
A Live Load (Longitudinal Direction )
For Maximum Reaction and Maximum Longitudinal Moment
C of pier
x
Proj
Effective span
C A span B
RA = 89.97 T RC = 12.30 T
RB = . 3 T
10.03 RD = 53.70 T
53.7
Page 18
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
RA = 44.30 T RC = 20.22 T
RB = 11.10 T RD = 23.78 T
Total Reaction, R = 64.52 T
Fh = 20 100 10 0
= 20 T
Contribution in Normal Case = 100 %
mR Component atcting at bearing = 23.95 T
Fh in Normal Condition = 33.95 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1569.23 ton.m
Fh = 20 55.4 10 0
= 11.08 T
Contribution in Normal Case = 100 %
mR Component atcting at bearing = 23.95 T
Fh iin N
Normall C
Condition
diti = 29 49
29.49 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1363.08 ton.m
Page 19
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
One Span Loaded 10.42 0.00 10.42 17.32 4.07 42.39
Both Span Loaded 10.42 10.42 20.83 0.00 4.07 84.78
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
Both Span Loaded 77.51 93.31 170.82 -26.26 1.09 185.64
Page 20
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Annexure E
EVALUATION OF WATER CURRENT FORCES Foundations
Data
Scour level for pier condition = 30.50 m
Water current velocity ( mean ) V = 2.12 m/s
Water current velocity ( max.) = 2 V = 3.00 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Foundingg level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 43 m
58.88 HFL
17.20
Page 21
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Page 22
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Annexure F
Moments due to tilt and shift
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1895.91 T
(LWL case) = 1895.91 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 612.22 T-m
(LWL case) = 612.22 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 1613.17 T-m
(LWL case) = 1717.28 T-m
Page 23
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17 R0
Checked By: SP Date: Dec, 2011.
Actual tilt 1 in T = 1 in 48
Actual shift = 918 mm
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1895.91 T
(LWL case) = 1895.91 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 612.22 T-m
(LWL case) = 612.22 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 2802.91 T-m
(LWL case) = 3046.02 T-m
Page 24
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 47.70 m
30.50 30.50 1.80 0.800 0 40.0 0.184 0.000 0.000 0.000 0.000 0.000 8.50 2.0 0.00 0.00 0.00
30.50 28.00 1.80 0.800 0 40.0 0.184 0.000 2.001 0.368 2.501 2.501 8.50 2.0 1.96 28.83 27.66
28.00 27.00 1.80 0.800 0 40.0 0.184 0.000 2.801 0.516 1.000 1.000 8.50 2.0 1.88 27.47 23.99
27.00 26.00 1.80 0.800 0 40.0 0.184 0.000 3.601 0.663 1.000 1.000 8.50 2.0 2.50 26.48 29.49
26.00 25.00 1.80 0.800 0 40.0 0.184 0.000 4.401 0.810 1.000 1.000 8.50 2.0 3.13 25.48 33.75
25.00 24.00 1.80 0.800 0 40.0 0.184 0.000 5.201 0.957 1.000 1.000 8.50 2.0 3.76 24.49 36.75
24.00 23.00 1.80 0.800 0 40.0 0.184 0.000 6.001 1.104 1.000 1.000 8.50 2.0 4.38 23.49 38.50
23.00 22.00 1.80 0.800 0 40.0 0.184 0.000 6.801 1.252 1.000 1.000 8.50 2.0 5.01 22.49 39.00
22 00
22.00 21 00
21.00 1 80
1.80 0
0.800
800 0 40
40.0
0 0
0.184
184 0.000
0 000 7.601
7 601 1.399
1 399 1.000
1 000 1.000
1 000 8.50
8 50 2
2.0
0 5
5.63
63 21.49
21 49 38.25
38 25
21.00 20.00 1.80 0.800 0 40.0 0.184 0.000 8.401 1.546 1.000 1.000 8.50 2.0 6.26 20.49 36.25
20.00 19.00 1.80 0.800 0 40.0 0.184 0.000 9.201 1.693 1.000 1.000 8.50 2.0 6.88 19.49 32.99
19.00 18.00 1.80 0.800 0 40.0 0.184 0.000 10.001 1.841 1.000 1.000 8.50 2.0 7.51 18.49 28.49
18.00 17.36 1.80 0.800 0 40.0 0.184 0.000 10.513 1.935 0.640 0.640 8.50 2.0 5.13 17.68 15.29
17 36
17.36 17 36
17.36 1 80
1.80 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 10 513
10.513 1 935
1.935 0 000
0.000 0 000
0.000 8 50
8.50 2 0
2.0 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 14.70 1.80 0.800 0 40.0 0.184 0.000 12.641 2.327 2.660 2.660 8.65 2.0 24.51 15.99 31.60
78.55 412.01
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
2
Nφ = ttan ( π/4
/4 + φ/2 ) 3) FOS in
i assessing
i the
h allowable
ll bl pressure shall
h ll b
be taken
k as per A
Appendix
di 44, IRC : 78
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 25
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T-m ) @ R.L.
2
From p
upto gm/cm
g 3
gm/cm
g 3
Kg/cm
g Degree
g T/m2 T/m2 ((Z)) m m m T m 14.70
30.50 30.50 1.8 0.800 0 40.0 12.764 0.000 0.000 0.000 0.000 0.000 8.50 2.0 0.00 0.00 0.00
30.50 28.00 1.8 0.800 0 40.0 12.764 0.000 2.001 25.538 2.501 2.501 8.50 2.0 135.72 28.83 1918.27
28.00 27.00 1.8 0.800 0 40.0 12.764 0.000 2.801 35.749 1.000 1.000 8.50 2.0 130.23 27.47 1663.37
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 3.601 45.960 1.000 1.000 8.50 2.0 173.63 26.48 2045.22
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 4.401 56.171 1.000 1.000 8.50 2.0 217.03 25.48 2340.28
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 5.201 66.382 1.000 1.000 8.50 2.0 260.42 24.49 2548.54
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 6.001 76.593 1.000 1.000 8.50 2.0 303.82 23.49 2670.00
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 6.801 86.804 1.000 1.000 8.50 2.0 347.22 22.49 2704.68
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 7.601 97.015 1.000 1.000 8.50 2.0 390.61 21.49 2652.56
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 8.401 107.226 1.000 1.000 8.50 2.0 434.01 20.49 2513.65
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 9.201 117.437 1.000 1.000 8.50 2.0 477.41 19.49 2287.94
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 10.001 127.648 1.000 1.000 8.50 2.0 520.80 18.49 1975.44
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.640 0.640 8.50 2.0 356.09 17.68 1060.20
17 36
17.36 17 36
17.36 1 8
1.8 0 800
0.800 0 40 0
40.0 12 764 0.000
12.764 0 000 10 513
10.513 134 183
134.183 0 000
0.000 0 000
0.000 8 50
8.50 2 0
2.0 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.50 2.0 0.00 17.36 0.00
17 36
17.36 14 70
14.70 1 8
1.8 0 800
0.800 0 40 0
40.0 12 764 0.000
12.764 0 000 12 641
12.641 161 344
161.344 2 660
2.660 2 660
2.660 8 65
8.65 2 0
2.0 1699 94
1699.94 15 99
15.99 2191 66
2191.66
5446.95 28571.81
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 26
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
30.50 30.50 1.8 0.800 0 40.0 0.184 0.000 0.000 0.000 0.000 0.000 8.50 2 0.00 0.00 0.00
30.50 28.00 1.8 0.800 0 40.0 0.184 0.000 2.001 0.368 2.501 2.501 8.50 2 1.96 28.83 27.66
28.00 27.00 1.8 0.800 0 40.0 0.184 0.000 2.801 0.516 1.000 1.000 8.50 2 1.88 27.47 23.99
27.00 26.00 1.8 0.800 0 40.0 0.184 0.000 3.601 0.663 1.000 1.000 8.50 2 2.50 26.48 29.49
26.00 25.00 1.8 0.800 0 40.0 0.184 0.000 4.401 0.810 1.000 1.000 8.50 2 3.13 25.48 33.75
25.00 24.00 1.8 0.800 0 40.0 0.184 0.000 5.201 0.957 1.000 1.000 8.50 2 3.76 24.49 36.75
24.00 23.00 1.8 0.800 0 40.0 0.184 0.000 6.001 1.104 1.000 1.000 8.50 2 4.38 23.49 38.50
23.00 22.00 1.8 0.800 0 40.0 0.184 0.000 6.801 1.252 1.000 1.000 8.50 2 5.01 22.49 39.00
22 00
22.00 21
21.00
00 1.8
1 8 0.800
0 800 0 40.0
40 0 0
0.184
184 0.000
0 000 7.601
7 601 1.399
1 399 1.000
1 000 1.000
1 000 8
8.50
50 2 5.63
5 63 21.49
21 49 38.25
38 25
21.00 20.00 1.8 0.800 0 40.0 0.184 0.000 8.401 1.546 1.000 1.000 8.50 2 6.26 20.49 36.25
20.00 19.00 1.8 0.800 0 40.0 0.184 0.000 9.201 1.693 1.000 1.000 8.50 2 6.88 19.49 32.99
19.00 18.00 1.8 0.800 0 40.0 0.184 0.000 10.001 1.841 1.000 1.000 8.50 2 7.51 18.49 28.49
18.00 17.36 1.8 0.800 0 40.0 0.184 0.000 10.513 1.935 0.640 0.640 8.50 2 5.13 17.68 15.29
17 36
17.36 17 36
17.36 1 8
1.8 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 10 513
10.513 1 935
1.935 0 000
0.000 0 000
0.000 8 50
8.50 2 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 10.513 1.935 0.000 0.000 8.50 2 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 0.184 0.000 12.641 2.327 2.660 2.660 8.65 2 24.51 15.99 31.60
78.55 412.01
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = ttan ( π/4
/4 + φ/2 ) 3) FOS in
i assessing
i the
h allowable
ll bl pressure shall
h ll b
be taken
k as per A
Appendix
di 44, IRC : 78
78-1983.
1983
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 27
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
PASSIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T
T-m
m ) @ R.L.
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
30.50 30.50 1.8 0.800 0 40.0 12.764 0.000 0.000 0.000 0.000 0.000 8.5 2.0 0.00 0.00 0.00
30.50 28.00 1.8 0.800 0 40.0 12.764 0.000 2.001 25.538 2.501 2.501 8.5 2.0 135.72 28.83 1918.27
28.00
8. 27.00
7. 1.8
.8 0.800
.8 0 40.0
. 12.764
.76 0.000
. 2.801
.8 35.749
35.7 9 1.000
. 1.000
. 8.5 2.0
. 130.23
3 . 3 27.47
7. 7 1663.37
663.37
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 3.601 45.960 1.000 1.000 8.5 2.0 173.63 26.48 2045.22
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 4.401 56.171 1.000 1.000 8.5 2.0 217.03 25.48 2340.28
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 5.201 66.382 1.000 1.000 8.5 2.0 260.42 24.49 2548.54
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 6.001 76.593 1.000 1.000 8.5 2.0 303.82 23.49 2670.00
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 6.801 86.804 1.000 1.000 8.5 2.0 347.22 22.49 2704.68
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 7.601 97.015 1.000 1.000 8.5 2.0 390.61 21.49 2652.56
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 8.401 107.226 1.000 1.000 8.5 2.0 434.01 20.49 2513.65
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 9.201 117.437 1.000 1.000 8.5 2.0 477.41 19.49 2287.94
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 10.001 127.648 1.000 1.000 8.5 2.0 520.80 18.49 1975.44
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.640 0.640 8.5 2.0 356.09 17.68 1060.20
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.5 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.5 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.5 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.5 2.0 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 10.513 134.183 0.000 0.000 8.5 2.0 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 12.764 0.000 12.641 161.344 2.660 2.660 8.65 2.0 1699.94 15.99 2191.66
5446.95 28571.81
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22 5 0 as per Appendix 4
22.5 4, IRC : 78-1983.
78 1983
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev.. Ht.. x Width
F W
Moment = Force x L.A. Page 28
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM
Checked By: SP
Page 29
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-
17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HL HT HR At R.L. ML
Sr. No. Description
( T ) ( T ) ( T ) m ( T-m )
1 Water current forces 2 62
2.62 19 76
19.76 33 67
33.67
2 Friction force 33.95 60.92 1080.12
3 Active Earth Pressure 0.61 0.28
4 Live Load surcharge 0.00 0.00 0.00
Total 36.57 19.76 42.17 1114.07
Page 30
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266 70 T
266.70
H= Soffit of well cap - critical section considered = 16.59 m
Moment = Weight x H / Tilt = 130.39 T-m
V ML MT MR (
Sr. No. Description
( T ) ( T-m ) ( T-m ) T-m )
1 Superstructure reaction
Dead Load 676.97 13.21
General items 170.82 0.00
Live Load 125.29 0.00 207.60
Friction force 1080.12
2 Water current forces 33.67 254.14
3 Pier and Piercap 474.36 0.00
4 Wellcap & steining (net) 1484.38
5 Tilt and shift moments 3023.06
6 Lateral earth pressure
Active earth pressure 0.28
LL surcharge pressure 0.00
Total 2931.8 1127.0 461.7 4241.3
Page 31
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Steining stresses
σmax = V/As + MR/Zs
= 93.89 + 87.77 = 181.66 T/m2
Page 32
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 30.50 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2 V = 2.99 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span
p on both side of the p
pier = 41.663 m
47.70 LWL
17.20
Page 33
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R L in m
R.L. γb γ C φ Ka Nφ γxZ Pressure layer thk Rev.
Rev Ht
Ht. Width FOS Force At R
R.L.
L Fact Mom
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
30.501 30.501 1.8 0.800 0 40.0 0.184 0.000 0.000 0.000 0.000 0.000 8.5 2 0.00 0.00 0.00
30.501 29.107 1.8 0.800 0 40.0 0.184 0.000 1.115 0.205 1.394 1.394 8.5 2 0.61 29.57 0.28
0.61 0.28
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active
act ve earth pressure coefficient
coeff c ent subject
j to limit of 22.5 0 as p
per Appendix
pp 4,, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev Ht
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 34
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
30.50 30.50 1.8 0.800 0 40 12.764 0.000 0.000 0.000 0.000 0.000 8.5 2 0.00 0.00 0.00
30.50 29.11 1.8 0.800 0 40 12.764 0.000 1.115 14.236 1.394 1.394 8.5 2 42.17 29.57 19.60
42.17 19.60
Where,,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 35
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HL HT HR At R.L. M
Sr. No. Description
( T ) ( T ) ( T ) m ( T-m )
1 Water current forces 3 90
3.90 16 83
16.83 76 87
76.87
2 Friction force 33.95 60.92 1074.99
3 Active Earth Pressure 0.48 0.20
4 Live Load surcharge 0.00 0.00
Total 37.85 16.83 41.91 1152.06
Page 36
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266 70 T
266.70
H= Soffit of well cap - critical section considered = 16.44 m
Moment = Weight x H / Tilt = 129.20 T-m
V ML MT MR
Sr. No. Description
( T ) ( T-m ) ( T-m ) ( T-m )
1 Superstructure reaction
Dead Load 676.97 13.21
General items 170.82 0.00
Live Load 125.29 0.00 207.60
Friction force 1074.99
2 Water current forces 62.85 331.57
3 Pier and Piercap 451.06 0.00
4 Wellcap & steining (net) 1473.29
5 Tilt and shift moments 2974.54
6 Lateral earth pressure
Active earth pressure 0.20
LL surcharge pressure 0.00
Total 2897.4 1151.0 539.2 4245.8
Page 37
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Steining stresses
σmax = V/As + MR/Zs
= 92.78 + 87.91 = 180.70 T/m2
Page 38
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 30.50 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2 V = 2.99 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span
p on both side of the p
pier = 88 m
58.88 HFL
17.20
Page 39
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk Rev. Ht. Width FOS Force At R.L. Fact Mom
2 2 2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m T/m (Z) m m m T m (T-m)
30.501 30.501 1.8 0.800 0 40.0 0.184 0.000 0.000 0.000 0.000 0.000 8.5 2 0.00 0.00 0.00
30.501 29.258 1.8 0.800 0 40.0 0.184 0.000 0.994 0.183 1.243 1.243 8.5 2 0.48 29.67 0.20
0.48 0.20
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ
φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 40
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2 2 2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m T/m (Z) m m m T m (T-m)
30.50 30.50 1.8 0.800 0 40 12.764 0.000 0.000 0.000 0.000 0.000 8.5 1.6 0.00 0.00 0.00
30.50 29.26 1.8 0.800 0 40 12.764 0.000 0.994 12.693 1.243 1.243 8.5 1.6 41.91 29.67 17.36
41.91 17.36
Where
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 41
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(N),R0 13-01-201220:40
Page 42
Design By : KM Job: Design of Pier Well Foundation, P2, Doc No. TTS/2012/DN/17, R0
Checked By: SP Kopili Bridge. Date: Dec, 2011.
DESIGN SUMMARY
Page 43
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Vertical Loads
1 Load From Super Structure
Live Load
3 Well Foundation
Moment at bearing level from super structure with 70R = -51.38 ton.m Annexure A
Moment due to braking at founding level = 1338.09 ton.m Annexure D
Moment at bearing level from super structure with class A = -75.88 ton.m Annexure A
Moment due to braking at founding level = 1235.02 ton.m Annexure D
3 From Foundation
4 Longitudinal Seismic
3 From Foundation
4 Transverse Seismic
Page 45
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( LWL with 70R and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 51.62 + 0.00 = 51.62 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 46
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well
Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 68.35 + 0.00 = 68.35 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 47
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011
Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 51.62 + 0.00 = 51.62 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 48
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011
Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 65.77 + 0.00 = 65.77 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 49
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011
Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 51.81 + 0.00 = 51.81 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 50
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011
Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure A
LOADS AND FORCES FROM SUPER STRUCTURE
Dead Load of PSC Box Girder, Left Span P2 to A2 Dead Load of PSC Box Girder, Right Span P2 to P1
C/C of span, Pier C/c = 37.810 m C/C of span, Pier C/c = 45.515 m
C/C of Bearing at Pier = 3.325 m C/C of Bearing at Pier = 3.325 m
C/C of Bearing of Super Structure = 34.485 m C/C of Bearing of Super Structure = 42.190 m
Maximum Depth of Super Structure = 2.500 m Maximum Depth of Super Structure = 2.500 m
Base width of Super Structure = 5.000 m Base width of Super Structure = 5.000 m
C/S Area at mid span = 5.600 m2 C/S Area at mid span = 5.600 m2
Distance of mid section from mid span = 9.051 m Distance of mid section from mid span = 12.903 m
C/S Area at Thickening = 7.760 m2 C/S Area at Thickening = 7.760 m2
Distance between thickened and mid span section = 4.892 m Distance between thickened and mid span section = 4.892 m
Distance of uniform thickened section = 3.900 m Distance of uniform thickened section = 3.900 m
C/S of slab = 3.588 m2 C/S of slab = 3.588 m2
Distance of uniform slab section = 1.038 m Distance of uniform slab section = 1.038 m
Weight of length considered = 37.760 m Weight of length considered = 45.465 m
Weight of Box Structure = 586.74 ton Weight of Box Structure = 694.61 ton
Weight of future stressing block = 11.37 ton Weight of future stressing block = 11.37 ton
Weight of End Diaphragm = 19.38 ton Weight of End Diaphragm = 19.38 ton
Weight of intermediate Diaphragm = 5.55 ton Weight of intermediate Diaphragm = 5.55 ton
Total Weight of Box Structure = 623.04 ton Total Weight of Box Structure = 730.91 ton
Dead Load Reaction of Box Structure = 311.52 ton Dead Load Reaction of Box Structure = 365.45 ton
SIDL Load intensity = 4.10 ton/m SIDL Load intensity = 4.10 ton/m
SIDL Reaction = 77.51 ton SIDL Reaction = 93.31 ton
Total Dead Load Reaction = 389.03 ton Total Dead Load Reaction = 458.76 ton
Page 51
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Live Load
70 R Wheeled (at Pier End) = 89.96 ton 70 R Wheeled (at Pier End) = 12.30 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at Pier End) for 1 lanes = 89.96 ton 70 R Wheeled (at Pier End) for 1 lanes = 12.30 ton
70 R Wheeled (at other End) = 10.04 ton 70 R Wheeled (at other End) = 53.70 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at other End) for 1 lanes = 10.04 ton 70 R Wheeled (at other End) for 1 lanes = 53.70 ton
Class A (at Pier End) = 44.30 ton Class A (at Pier End) = 20.22 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at Pier End) for 2 lanes = 88.60 ton Class A (at Pier End) for 2 lanes = 40.43 ton
Class A (at other End) = 11.10 ton Class A (at other End) = 23.78 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at other End) for 2 lanes = 22.20 ton Class A (at other End) for 2 lanes = 47.57 ton
Total DL + LL Reaction with Class 70R = 478.98 ton Total DL + LL Reaction with Class 70R = 471.06 ton
Total DL + LL Reaction with Class A = 477.63 ton Total DL + LL Reaction with ClassA = 499.19 ton
Page 52
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Live Load Percentage considered = 50.00 % Live Load Percentage considered = 50.00 %
FPLL intensity = 0.553 ton/m FPLL intensity = 0.553 ton/m
Footh Path Live Load Reaction = 5.22 ton Footh Path Live Load Reaction = 6.29 ton
70 R Wheeled (at Pier End) = 44.98 ton 70 R Wheeled (at Pier End) = 6.15 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at Pier End) for 1 lanes = 44.98 ton 70 R Wheeled (at Pier End) for 1 lanes = 6.15 ton
70 R Wheeled (at other End) = 5.02 ton 70 R Wheeled (at other End) = 26.85 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at other End) for 1 lanes = 5.02 ton 70 R Wheeled (at other End) for 1 lanes = 26.85 ton
Class A (at Pier End) = 22.15 ton Class A (at Pier End) = 10.11 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at Pier End) for 2 lanes = 44.30 ton Class A (at Pier End) for 2 lanes = 20.22 ton
Class A (at other End) = 5.55 ton Class A (at other End) = 11.89 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at other End) for 2 lanes = 11.10 ton Class A (at other End) for 2 lanes = 23.78 ton
Total DL + LL Reaction with Class 70R = 434.01 ton Total DL + LL Reaction with Class 70R = 464.91 ton
Total DL + LL Reaction with Class A = 433.33 ton Total DL + LL Reaction with ClassA = 478.98 ton
Page 53
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure B
LOADS of PIERCAP AND PIER
Weight of Pier Abutment Structure
3
Density of Concrete = 2.4 t/m HFL = 58.88 m
3
Density of Earth = 1.64 t/m LWL = 47.70 m
Sr. Description of Shape Nos. Area Depth Weight
No. Structure (A) m2 (D) m Tons
1 Piercap Rectangle 1 32.400 0.80 62.21
2 Piercap Piramid 1 23.400 0.70 39.31
3 Pier (HFL) Octagonal 1 13.542 11.472 221.42
4 (LWL) Octagonal 1 13.542 11.472 372.84
Total at (HFL) 322.94
Total at (LWL) 474.36
Page 54
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure C
DESIGN OF WELL FOUNDATION P2
1 Bottom Plug
3
Density = 2.20 T/m
volume :- V1 = (Ab + Ad + Sqrt( Ab x Ad )) x Ht /3
= 96.77 m3
V2 = Ad x 0.6
= 15.31 m3
3
Total volume = 112.08 m
weight = 246.57 T
2 Sump (Add 15.00% )
3
Total volume = 16.81 m
weight = 36.99 T
Page 55
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
3 Curb
3
Density = 2.50 T/m
3
volume = Ab x curb Ht. - Vplug + Ad x 0.3 = 51.90 m
weight = 129.74 T
4 Steining
3
Density = 2.50 t/m
height of steining = 28.34 m
3
Volume = 884.99 m
weight = 2212.46 T
5 Material filling
3
Density = 1.80 T/m
filling height = 12.84 m
3
Volume of filling = 327.67 m
weight of filling = 589.81 T
6 Water fill
3
Density = 1.00 T/m
filling height = 14.90 m
weight of filling = 380.19 T
8 Wellcap
3
Density = 2.50 T/m
3
volume = 113 49 m
113.49
weight = 283.73 T
Page 56
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Weight of well structure above scour level (dry) including well cap = 1645.75 T
Weight of well structure above scour level (dry) excluding well cap = 1362.03 T
47
47.70
70 m
1
48.00
14.79 m
14.70 m
Page 57
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for
for P2\TTS-2012-
P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Page 58
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure D
A Live Load (Longitudinal Direction )
For Maximum Reaction and Maximum Longitudinal Moment
C of pier
x
Proj
Effective span
C A span B
RA = 89.96 T RC = 12.30 T
RB = 10.04 T RD = 53.70 T
RA = 44.30 T RC = 20.22 T
RB = 11.10 T RD = 23.78 T
Total Reaction, R = 64.52 T
Page 59
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-
17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Fh = 20 100 10 0
= 20 T
Contribution in Seismic Case = 50 %
mR Component atcting at bearing = 23.95 T
Fh in Seismic Condition = 28.95 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1338.09 ton.m
Fh = 20 55.4 10 0
= 11.08 T
Contribution in Seismic Case = 50 %
mR Component atcting at bearing = 23.95 T
Fh in Seismic Condition = 26.72 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1235.02 ton.m
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
One Span Loaded 10.42 0.00 10.42 17.32 4.07 42.39
Both Span Loaded 10.42 10.42 20.83 0.00 4.07 84.78
Page 60
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-
17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
Both Span Loaded 77.51 93.31 170.82 -26.26 1.09 185.64
Page 61
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-
17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure E
EVALUATION OF WATER CURRENT FORCES Foundations
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.12 m/s
Water current velocity ( max.) = 2V = 3.00 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 43 m
58.88 HFL
14.36
Page 62
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Page 63
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure F
Moments due to tilt and shift
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1906.23 T
(LWL case) = 1906.23 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 615.55 T-m
(LWL case) = 615.55 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 1573.44 T-m
(LWL case) = 1677.54 T-m
Page 64
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Actual tilt 1 in T = 1 in 48
Actual shift = 918 mm
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1906.23 T
(LWL case) = 1906.23 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 615.55 T-m
(LWL case) = 615.55 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 2705.67 T-m
(LWL case) = 2948.77 T-m
Resultant Tilt:
Tilt in Longitudinal Direction 1 in 48.0
Tilt in Transverse Direction 1 in 48.0
Depth of Well 33.00 m
Offset due to tilt in longitudinal direction 0.688 m
Offset due to tilt in transverse direction 0.688 m
Resultant offset due to tilt 0.97 m
Resultant Tilt: 1 in 33.9
ResultantShift:
Shift in Longitudinal Direction 0.00 mm
Shift in Transverse Direction 918.00 mm
Depth of Well 33.00 m
Resultant offset due to Shift 918.00 mm
Page 65
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure G
EVALUATION OF SEISMIC FORCES P2
Page 66
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011
Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 47.70 m
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment (T-m) @ R.L.
2
From upto gm/cm 3
gm/cm
3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
33.34 31.34 1.80 0.800 0 35.5 0.221 0.000 1.600 0.354 2.000 2.000 8.50 1.6 1.88 32.01 32.57
31.34 28.00 1.80 0.800 0 40.0 0.184 0.000 4.271 0.786 3.339 3.339 8.50 1.6 10.12 29.46 149.29
28.00 27.00 1.80 0.800 0 40.0 0.184 0.000 5.071 0.933 1.000 1.000 8.50 1.6 4.57 27.49 58.40
27.00 26.00 1.80 0.800 0 40.0 0.184 0.000 5.871 1.081 1.000 1.000 8.50 1.6 5.35 26.49 63.06
26.00 25.00 1.80 0.800 0 40.0 0.184 0.000 6.671 1.228 1.000 1.000 8.50 1.6 6.13 25.49 66.16
25.00 24.00 1.80 0.800 0 40.0 0.184 0.000 7.471 1.375 1.000 1.000 8.50 1.6 6.91 24.49 67.69
24.00 23.00 1.80 0.800 0 40.0 0.184 0.000 8.271 1.522 1.000 1.000 8.50 1.6 7.70 23.49 67.66
23.00 22.00 1.80 0.800 0 40.0 0.184 0.000 9.071 1.670 1.000 1.000 8.50 1.6 8.48 22.49 66.07
22.00 21.00 1.80 0.800 0 40.0 0.184 0.000 9.871 1.817 1.000 1.000 8.50 1.6 9.26 21.49 62.91
21.00 20.00 1.80 0.800 0 40.0 0.184 0.000 10.671 1.964 1.000 1.000 8.50 1.6 10.04 20.49 58.19
20.00 19.00 1.80 0.800 0 40.0 0.184 0.000 11.471 2.111 1.000 1.000 8.50 1.6 10.83 19.49 51.90
19.00 18.00 1.80 0.800 0 40.0 0.184 0.000 12.271 2.259 1.000 1.000 8.50 1.6 11.61 18.49 44.04
18.00 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.640 0.640 8.50 1.6 7.84 17.68 23.34
17 36
17.36 17 36
17.36 1 80
1.80 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 12 783
12.783 2 353
2.353 0 000
0.000 0 000
0.000 8 50
8.50 1 6
1.6 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 14.70 1.80 0.800 0 40.0 0.184 0.000 14.911 2.745 2.660 2.660 8.65 1.6 36.65 16.00 47.50
137.36 858.79
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A. Page 67
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
PASSIVE EARTH PRESSURE CALCULATION
Water level = 47.70 m
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T-m ) @ R.L.
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.600 14.557 2.000 2.000 8.50 1.6 77.33 32.01 1338.32
31.34 28.00 1.8 0.800 0 40.0 12.764 0.000 4.271 54.518 3.339 3.339 8.50 1.6 612.66 29.35 8973.93
28.00 27.00 1.8 0.800 0 40.0 12.764 0.000 5.071 64.729 1.000 1.000 8.50 1.6 316.75 27.49 4049.85
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 5.871 74.940 1.000 1.000 8.50 1.6 370.99 26.49 4373.20
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 6.671 85.151 1.000 1.000 8.50 1.6 425.24 25.49 4588.06
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 7.471 95.362 1.000 1.000 8.50 1.6 479.49 24.49 4694.43
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 8.271 105.573 1.000 1.000 8.50 1.6 533.73 23.49 4692.31
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 9.071 115.784 1.000 1.000 8.50 1.6 587.98 22.49 4581.70
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 9.871 125.995 1.000 1.000 8.50 1.6 642.22 21.49 4362.60
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 10.671 136.206 1.000 1.000 8.50 1.6 696.47 20.49 4035.00
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 11.471 146.417 1.000 1.000 8.50 1.6 750.71 19.49 3598.91
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 12.271 156.628 1.000 1.000 8.50 1.6 804.96 18.49 3054.33
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.640 0.640 8.50 1.6 543.64 17.68 1618.87
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 12.764 0.000 14.911 190.324 2.660 2.660 8.65 1.6 2541.68 16.00 3293.85
9383.85 57255.37
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x N φ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 68
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T-m ) @ R.L.
2
From upto gm/cm 3
gm/cm
3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
33.34 31.34 1.8 0.800 0 35.5 0.221 0.000 1.600 0.354 2.000 2.000 8.50 1.6 1.88 32.01 32.57
31.34 28.00 1.8 0.800 0 40.0 0.184 0.000 4.271 0.786 3.339 3.339 8.50 1.6 10.12 29.46 149.29
28.00 27.00 1.8 0.800 0 40.0 0.184 0.000 5.071 0.933 1.000 1.000 8.50 1.6 4.57 27.49 58.40
27.00 26.00 1.8 0.800 0 40.0 0.184 0.000 5.871 1.081 1.000 1.000 8.50 1.6 5.35 26.49 63.06
26.00 25.00 1.8 0.800 0 40.0 0.184 0.000 6.671 1.228 1.000 1.000 8.50 1.6 6.13 25.49 66.16
25.00 24.00 1.8 0.800 0 40.0 0.184 0.000 7.471 1.375 1.000 1.000 8.50 1.6 6.91 24.49 67.69
24.00 23.00 1.8 0.800 0 40.0 0.184 0.000 8.271 1.522 1.000 1.000 8.50 1.6 7.70 23.49 67.66
23.00 22.00 1.8 0.800 0 40.0 0.184 0.000 9.071 1.670 1.000 1.000 8.50 1.6 8.48 22.49 66.07
22.00 21.00 1.8 0.800 0 40.0 0.184 0.000 9.871 1.817 1.000 1.000 8.50 1.6 9.26 21.49 62.91
21.00 20.00 1.8 0.800 0 40.0 0.184 0.000 10.671 1.964 1.000 1.000 8.50 1.6 10.04 20.49 58.19
20.00 19.00 1.8 0.800 0 40.0 0.184 0.000 11.471 2.111 1.000 1.000 8.50 1.6 10.83 19.49 51.90
19.00 18.00 1.8 0.800 0 40.0 0.184 0.000 12.271 2.259 1.000 1.000 8.50 1.6 11.61 18.49 44.04
18.00 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.640 0.640 8.50 1.6 7.84 17.68 23.34
17 36
17.36 17 36
17.36 1 8
1.8 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 12 783
12.783 2 353
2.353 0 000
0.000 0 000
0.000 8 50
8.50 16
1.6 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 0.184 0.000 14.911 2.745 2.660 2.660 8.65 1.6 36.65 16.00 47.50
137.36 858.79
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A. Page 69
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
PASSIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T-m ) @ R.L.
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.600 14.557 2.000 2.000 8.5 1.6 77.33 32.01 1338.32
31.34 28.00 1.8 0.800 0 40.0 12.764 0.000 4.271 54.518 3.339 3.339 8.5 1.6 612.66 29.35 8973.93
28.00 27.00 1.8 0.800 0 40.0 12.764 0.000 5.071 64.729 1.000 1.000 8.5 1.6 316.75 27.49 4049.85
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 5.871 74.940 1.000 1.000 8.5 1.6 370.99 26.49 4373.20
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 6.671 85.151 1.000 1.000 8.5 1.6 425.24 25.49 4588.06
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 7.471 95.362 1.000 1.000 8.5 1.6 479.49 24.49 4694.43
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 8.271 105.573 1.000 1.000 8.5 1.6 533.73 23.49 4692.31
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 9.071 115.784 1.000 1.000 8.5 1.6 587.98 22.49 4581.70
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 9.871 125.995 1.000 1.000 8.5 1.6 642.22 21.49 4362.60
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 10.671 136.206 1.000 1.000 8.5 1.6 696.47 20.49 4035.00
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 11.471 146.417 1.000 1.000 8.5 1.6 750.71 19.49 3598.91
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 12.271 156.628 1.000 1.000 8.5 1.6 804.96 18.49 3054.33
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.640 0.640 8.5 1.6 543.64 17.68 1618.87
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 12.764 0.000 14.911 190.324 2.660 2.660 8.65 1.6 2541.68 16.00 3293.85
9383.85 57255.37
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x N φ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 70
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM
Checked By: SP
Page 71
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HL HT HR At R.L. ML
Sr. No. Description
(T] ) ( T ) ( T ) m ( T-m )
1 Dead Load 168.22 61.17 5661.05
2 General Item 41.86 61.17 1408.55
3 Live load 0.00 61.17 0.00
4 Pier Cap 27.41 59.92 888.17
5 Pier 100.67 53.44 2608.93
6 Well Cap 76.61 46.70 1469.35
7 Well 367.75 39.52 4413.04
8 Water current forces 2.19 16.50 33.65
9 Friction force 28.95 60.92 966.98
10 Active Earth Pressure 14.17 28.67
11 Live Load surcharge 0.00 0.00 0.00
Total 813.64 16.50 827.98 17478.40
i) Well steining
Well cap top level = 47.70 m
Well cap thickness = 2.00 m
Well cap bottom level = 45.70 m
Reference level section of well steining = 27.52 m
2
Cross section area of steining = 31.23 m
3
Volume of steining = 567.74 m
3
Density of concrete of steining = 2.50 t/m
Dry weight of steining = 1419.34 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 85.16 T
Net Weight = 1334.18 T
H= Soffit of well cap - critical section considered = 18.18 m
Moment = Weight x (H/2) / Tilt = 357.33 T-m
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266.70 T
H= Soffit of well cap - critical section considered = 18.18 m
Moment = Weight x H / Tilt = 142.86 T-m
V ML MT MR (
Sr. No. Description
( T ) ( T-m ) ( T-m ) T-m )
1 Superstructure reaction
Dead Load 676.97 -51.38
General items 170.82 0.00
Live Load 62.64 0.00 103.79
Friction force 966.98
Seismic force 17449.73
2 Water current forces 33.65 254.01
3 Pier and Piercap 474.36
4 Wellcap & steining (net) 1600.88
5 Tilt and shift moments 3083.25
6 Lateral earth pressure
Active earth pressure 28.67
LL surcharge pressure 0.00
Total 2985.7 949.3 17807.5 20944.7
Steining stresses
σmax = V/As + MR/Zs
= 95.61 + 404.4532 = 500.06 T/m2
Page 73
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-
P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2V = 2.99 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 41.66 m
47.70 LWL
14.36
Page 74
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
2.0 Preamble:
The aim of the present sheet is to design a solid and hollow circular R.C.C.
section subject to combined axial thrust and any-axis bending.
3.0 Input : Y
c.g
n
N.A. y X-bar
θin
X X D
tc θout
Ast(outer)
Ast(inner)
Y
Outer diameter = Do = 8.500 m
Inner diameter = Di = 5.700 m
Shell Thickness = tc = 1.4 m
2
Steel in outer ring = Ast(outer) = 785.4 cm
Effective cover to outer steel = d'out = 0.0975 m
2
Steel in inner ring = Ast(inner) = 502.7 cm
Reinforcement in percentage = %= 0.412
Effective cover to inner steel = d'inn = 0.095 m
2
Allowable tensile stresses in steel = fs = -3600 Kg/cm
2
Allowable compressive
p stresses in concrete = fc = 150.0 Kg/cm
g
Modular ratio = m= 10 m
Design force = F= 2985.7 T
Design Moment = M= 19454.0 T-m
Eccentricity = e= 6.516 m
Page 75
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
C.g. distance of the effective area from physical centroid = X-bar = 2.741 m
4
Effective moment of inertia = Ieff = 22.508 m
C.g. distance of the effective area from Neutral Axis = y= 0.576 m
Depth of Neutral Axis from extreme compression fibre = n= 2.085 m
6.0 Stresses
2
Concrete stresses = fc = 1044.28 T/m
2
= 104.43 Kg/cm
Steel stresses = fs = -31633.5 T/m2
2
= -3163.35 Kg/cm
7.0 Checks
Assumed Calculated
n 2.085 2.085 m
Actual Permissible.
2
fc 104.43 150.0 Kg/cm
2
fs -3163.35 -3600.0 Kg/cm
8.0 Refernces :
1) Raina V. K., Concrete bridge practice Analysis,Design and Economics, Tata Mcgraw-Hill
publising company limited, 1991.
2) Young W. C., Roark's Formulas for stress and strain , Mcgraw-Hill Book Company,
sixth edition 1989.
Formulated by -KIRAN
Page 76
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm 3
gm/cm
3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
33.339 31.339 1.8 0.800 0 35.5 0.221 0.000 1.600 0.354 2.000 2.000 8.5 1.6 1.88 32.01 8.44
31.339 27.519 1.8 0.800 0 40.0 0.184 0.000 4.656 0.857 3.820 3.820 8.5 1.6 12.29 29.17 20.22
14.17 28.67
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
repose
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 77
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm3 gm/cm
3
Kg/cm Degree T/m2 T/m
2
(Z) m m m T m (T-m)
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.600 14.557 2.000 2.000 8.5 1.6 77.33 32.01 346.95
31.34 27.52 1.8 0.800 0 40 12.764 0.000 4.656 59.426 3.820 3.820 8.5 1.6 750.65 29.04 1143.82
827.98 1490.78
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22 5 0 as per Appendix 4
22.5 4, IRC : 78-1983.
78-1983
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x N φ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 78
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HL HT HR At R.L. ML
Sr. No. Description
(T] ) ( T ) ( T ) m ( T-m )
1 Dead Load 168.22 61.17 5879.27
2 General Item 41.86 61.17 1567.49
3 Live load 0.00 61.17 0.00
4 Pier Cap 27.41 59.92 888.29
5 Pier 100.67 53.44 2609.36
6 Well Cap 76.61 46.70 1469.67
7 Well 367.75 39.52 4414.60
8 Water current forces 3.48 14.00 78.16
9 Friction force 28.95 0.00 60.92
10 Active Earth Pressure 14.19 28.73
11 Live Load surcharge 0.00 0.00
Total 814.94 14.00 829.25 16935.56
i) Well steining
Well cap top level = 47.70 m
Well cap thickness = 2.00 m
Well cap bottom level = 45.70 m
Reference level section of well steining = 27.52 m
2
Cross section area of steining = 31.23 m
3
Volume of steining = 567.87 m
3
Density of concrete of steining = 2.50 t/m
Dry weight of steining = 1419.67 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 85.18 T
Net Weight = 1334.49 T
H= Soffit of well cap - critical section considered = 18.18 m
Moment = Weight x (H/2) / Tilt = 357.49 T-m
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266.70 T
H= Soffit of well cap - critical section considered = 18.18 m
Moment = Weight x H / Tilt = 142.89 T-m
V ML MT MR
Sr. No. Description
( T ) ( T-m ) ( T-m ) ( T-m )
1 Superstructure reaction
Dead Load 676.97 -51.38
General items 170.82 0.00
Live Load 62.64 0.00 103.79
Friction force 967.10
Seismic force 16906.83
2 Water current forces 78.16 327.57
3 Pier and Piercap 451.06
4 Wellcap & steining (net) 1601.19
5 Tilt and shift moments 3048.42
6 Lateral earth pressure
Active earth pressure 28.73
LL surcharge pressure 0.00
Total 2962.7 993.9 17338.2 20443.8
Steining stresses
σmax = V/As + MR/Zs
= 94.87 + 393.9676 = 488.84 T/m2
Page 80
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-
P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2V = 2.99 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 41.66 m
58.88 HFL
14.36
Page 81
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm 3
gm/cm
3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
33.339 31.339 1.8 0.800 0 35.5 0.221 0.000 1.600 0.354 2.000 2.000 8.5 1.6 1.88 32.01 8.45
31.339 27.515 1.8 0.800 0 40 0.184 0.000 4.659 0.858 3.824 3.824 8.5 1.6 12.31 29.16 20.28
14.19 28.73
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4,
4 IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 82
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm3 gm/cm
3
Kg/cm Degree T/m2 T/m
2
(Z) m m m T m (T-m)
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.600 14.557 2.000 2.000 8.5 1.6 77.33 32.01 347.28
31.34 27.52 1.8 0.800 0 40.0 12.764 0.000 4.659 59.469 3.824 3.824 8.5 1.6 751.91 29.04 1146.91
829.25 1494.19
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
repose
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x N φ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 83
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
2.0 Preamble:
The aim of the present sheet is to design a solid and hollow circular R.C.C.
section subject to combined axial thrust and any-axis bending.
3.0 Input : Y
c.g
n
N.A. y X-bar
θin
X X D
tc θout
Ast(outer)
Ast(inner)
Y
Outer diameter = Do = 8.500 m
Inner diameter = Di = 5.700 m
Shell Thickness = tc = 1.4 m
2
Steel in outer ring = Ast(outer) = 785.4 cm
Effective cover to outer steel = d'out = 0.0975 m
2
Steel in inner ring = Ast(inner) = 502.7 cm
Reinforcement in percentage = %= 0.412
Effective cover to inner steel = d'inn = 0.095 m
2
Allowable tensile stresses in steel = fs = -3600 Kg/cm
2
Allowable compressive
p stresses in concrete = fc = 150.0 Kg/cm
g
Modular ratio = m= 10 m
Design force = F= 2962.7 T
Design Moment = M= 18949.6 T-m
Eccentricity = e= 6.396 m
Page 84
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
C.g. distance of the effective area from physical centroid = X-bar = 2.737 m
4
Effective moment of inertia = Ieff = 22.531 m
C.g. distance of the effective area from Neutral Axis = y= 0.591 m
Depth of Neutral Axis from extreme compression fibre = n= 2.104 m
6.0 Stresses
2
Concrete stresses = fc = 1012.45 T/m
2
= 101.24 Kg/cm
Steel stresses = fs = -30305 T/m2
2
= -3030.50 Kg/cm
7.0 Checks
Assumed Calculated
n 2.104 2.104 m
Actual Permissible.
2
fc 101.24 150.0 Kg/cm
2
fs -3030.50 -3600.0 Kg/cm
8.0 Refernces :
1) Raina V. K., Concrete bridge practice Analysis,Design and Economics, Tata Mcgraw-Hill
publising company limited, 1991.
2) Young W. C., Roark's Formulas for stress and strain , Mcgraw-Hill Book Company,
sixth edition 1989.
Formulated by -KIRAN
Page 85
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(LS),R0 13-01-201220:44
Page 86
Design By : KM Job: Design of Pier Well Foundation, P2, Doc No. TTS/2012/DN/17, R0
Checked By: SP Kopili Bridge. Date: Dec, 2011.
DESIGN SUMMARY
Page 87
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Vertical Loads
1 Load From Super Structure
Live Load
3 Well Foundation
Page 88
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Moment at bearing level from super structure with 70R = -51.36 ton.m Annexure A
Moment due to braking at founding level = 1338.12 ton.m Annexure D
Moment at bearing level from super structure with class A = -75.88 ton.m Annexure A
Moment due to braking at founding level = 1235.05 ton.m Annexure D
3 From Foundation
4 Longitudinal Seismic
Page 89
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
3 From Foundation
4 Transverse Seismic
Page 90
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( LWL with 70R and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 54.19 + 0.00 = 54.19 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 91
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( LWL with 70R and Seismic +ve condition )
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 68.35 + 0.00 = 68.35 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 92
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with 70R and Seismic -ve condition )
Sr. V H ML MT MR
Description
No. ( T ) ( T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 51.62 + 0.00 = 51.62 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 93
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with 70R and Seismic +ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 65.77 + 0.00 = 65.77 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 94
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with Class A and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 51.81 + 0.00 = 51.81 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 95
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for
P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with Class A and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 66.03 + 0.00 = 66.03 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 96
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for
P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with Class A and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 54.39 + 0.00 = 54.39 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 97
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for
P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
CHECK FOR WELL STABILITY ( HFL with Class A and Seismic -ve condition )
Sr. V ( H ( ML MT MR
Description
No. T ) T ) ( T-m ) ( T-m ) ( T-m )
Base pressure
Pmax = V/Ab + MR/Zb
= 68.60 + 0.00 = 68.60 T/m2
2
Pallow = Allowable base pressure = 125 T/m
Here, allowable base pressure is more than the maximum developed pressure
Hence, O.K.
Page 98
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for
P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure A
LOADS AND FORCES FROM SUPER STRUCTURE
Dead Load of PSC Box Girder, Left Span P2 to A2 Dead Load of PSC Box Girder, Right Span P2 to P1
C/C of span, Pier C/c = 37.810 m C/C of span, Pier C/c = 45.515 m
C/C of Bearing at Pier = 3.325 m C/C of Bearing at Pier = 3.325 m
C/C of Bearing of Super Structure = 34.485 m C/C of Bearing of Super Structure = 42.190 m
Maximum Depth of Super Structure = 2.500 m Maximum Depth of Super Structure = 2.500 m
Base width of Super Structure = 5.000 m Base width of Super Structure = 5.000 m
2
C/S Area at mid span = 5.600 m C/S Area at mid span = 5.600 m2
Distance of mid section from mid span = 9.051 m Distance of mid section from mid span = 12.903 m
2
C/S Area at Thickening = 7.760 m C/S Area at Thickening = 7.760 m2
Distance between thickened and mid span section = 4.892 m Distance between thickened and mid span section = 4.892 m
Distance of uniform thickened section = 3.900 m Distance of uniform thickened section = 3.900 m
2
C/S of slab = 3.588 m C/S of slab = 3.588 m2
Distance of uniform slab section = 1.038 m Distance of uniform slab section = 1.038 m
Weight of length considered = 37.760 m Weight of length considered = 45.465 m
3
Density of concrete = 2.500 ton/m Density of concrete = 2.500 ton/m3
Weight of Box Structure = 586.74 ton Weight of Box Structure = 694.61 ton
Weight of future stressing block = 11.37 ton Weight of future stressing block = 11.37 ton
Weight of End Diaphragm = 19.38 ton Weight of End Diaphragm = 19.38 ton
Weight of intermediate Diaphragm = 5.55 ton Weight of intermediate Diaphragm = 5.55 ton
Total Weight of Box Structure = 623.04 ton Total Weight of Box Structure = 730.91 ton
Dead Load Reaction of Box Structure = 311.52 ton Dead Load Reaction of Box Structure = 365.45 ton
SIDL Load intensity = 4.10 ton/m SIDL Load intensity = 4.10 ton/m
SIDL Reaction = 77.51 ton SIDL Reaction = 93.31 ton
Total Dead Load Reaction = 389.03 ton Total Dead Load Reaction = 458.76 ton
Page 99
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Live Load
70 R Wheeled (at Pier End) = 89.97 ton 70 R Wheeled (at Pier End) = 12.30 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at Pier End) for 1 lanes = 89.97 ton 70 R Wheeled (at Pier End) for 1 lanes = 12.30 ton
70 R Wheeled (at other End) = 10.03 ton 70 R Wheeled (at other End) = 53.70 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at other End) for 1 lanes = 10.03 ton 70 R Wheeled (at other End) for 1 lanes = 53.70 ton
Class A (at Pier End) = 44.30 ton Class A (at Pier End) = 20.22 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at Pier End) for 2 lanes = 88.60 ton Class A (at Pier End) for 2 lanes = 40.43 ton
Class A (at other End) = 11.10 ton Class A (at other End) = 23.78 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at other End) for 2 lanes = 22.20 ton Class A (at other End) for 2 lanes = 47.57 ton
Total DL + LL Reaction with Class 70R = 479.00 ton Total DL + LL Reaction with Class 70R = 471.06 ton
Total DL + LL Reaction with Class A = 477.63 ton Total DL + LL Reaction with ClassA = 499.19 ton
Page 100
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Live Load Percentage considered = 50.00 % Live Load Percentage considered = 50.00 %
FPLL intensity = 0.553 ton/m FPLL intensity = 0.553 ton/m
Footh Path Live Load Reaction = 5.22 ton Footh Path Live Load Reaction = 6.29 ton
70 R Wheeled (at Pier End) = 44.99 ton 70 R Wheeled (at Pier End) = 6.15 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at Pier End) for 1 lanes = 44.99 ton 70 R Wheeled (at Pier End) for 1 lanes = 6.15 ton
70 R Wheeled (at other End) = 5.01 ton 70 R Wheeled (at other End) = 26.85 ton
No. of Lanes = 1 No. of Lanes = 1
70 R Wheeled (at other End) for 1 lanes = 5.01 ton 70 R Wheeled (at other End) for 1 lanes = 26.85 ton
Class A (at Pier End) = 22.15 ton Class A (at Pier End) = 10.11 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at Pier End) for 2 lanes = 44.30 ton Class A (at Pier End) for 2 lanes = 20.22 ton
Class A (at other End) = 5.55 ton Class A (at other End) = 11.89 ton
No. of Lanes = 2 No. of Lanes = 2
Class A (at other End) for 2 lanes = 11.10 ton Class A (at other End) for 2 lanes = 23.78 ton
Total DL + LL Reaction with Class 70R = 434.01 ton Total DL + LL Reaction with Class 70R = 464.91 ton
Total DL + LL Reaction with Class A = 433.33 ton Total DL + LL Reaction with ClassA = 478.98 ton
Page 101
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure B
Weight of Pier Abutment Structure
3
Density of Concrete = 2.4 t/m HFL = 58.88 m
3
Density of Earth = 1.64 t/m LWL = 47.70 m
Sr. Description of Shape Nos. Area Depth Weight
No. Structure (A) m2 (D) m Tons
1 Piercap Rectangle 1 32.400 0.80 62.21
2 Piercap Piramid 1 23.400 0.70 39.31
3 Pier (HFL) Octagonal 1 13.542 11.472 221.42
4 (LWL) Octagonal 1 13.542 11.472 372.84
Total at (HFL) 322.94
Total at (LWL) 474.36
Page 102
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure C
DESIGN OF WELL FOUNDATION P2
1 Bottom Plug
3
Density = 2.20 T/m
volume :- V1 = (Ab + Ad + Sqrt( Ab x Ad )) x Ht /3
= 96.77 m3
V2 = Ad x 0.6
= 15.31 m3
3
Total volume = 112.08 m
weight = 246.57 T
2 Sump (Add 15.00 % )
3
Total volume = 16.81 m
weight = 36.99 T
Page 103
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
3 Curb
3
Density = 2.50 T/m
3
volume = Ab x curb Ht. - Vplug + Ad x 0.3 = 51.90 m
weight = 129.74 T
4 Steining
3
Density = 2 50 t/m
2.50
height of steining = 28.34 m
3
Volume = 884.99 m
weight = 2212.46 T
5 Material filling
3
Density
y = 1.80 T/m
filling height = 12.84 m
3
Volume of filling = 327.67 m
weight of filling = 589.81 T
6 Water fill
3
Density = 1.00 T/m
filli height
filling h i ht = 14.90
14 90 m
weight of filling = 380.19 T
8 Wellcap
3
Density = 2.50 T/m
3
volume = 113.49 m
weight = 283.73 T
Page 104
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Weight of well structure above scour level (dry) including well cap = 1645.75 T
Weight of well structure above scour level (dry) excluding well cap = 1362.03 T
47.70 m
1
48 00
48.00
14.79 m
14.70 m
Page 105
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Page 106
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure D
A Live Load (Longitudinal Direction )
For Maximum Reaction and Maximum Longitudinal Moment
C of pier
x
Proj
Effective span
C A span B
RA = 89.97 T RC = 12.30 T
RB = . 3 T
10.03 RD = 53.70 T
53.7
Page 107
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
RA = 44.30 T RC = 20.22 T
RB = 11.10 T RD = 23.78 T
Total Reaction, R = 64.52 T
Fh = 20 100 10 0
= 20 T
Contribution in Seismic Case = 50 %
mR Component atcting at bearing = 23.95 T
Fh in Seismic Condition = 28.95 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1338.12 ton.m
Fh = 20 55.4 10 0
= 11.08 T
Contribution in Seismic Case = 50 %
mR Component atcting at bearing = 23.95 T
Fh iin S
Seismic
i i C Condition
diti = 26 72
26.72 T
Acting at RL = 60.922 m
Founding Level = 14.70 m
Moment at Founding Level = 1235.05 ton.m
Page 108
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
One Span Loaded 10.42 0.00 10.42 17.32 4.07 42.39
Both Span Loaded 10.42 10.42 20.83 0.00 4.07 84.78
Loading RA RC Pier ML ec MT
( T ) ( T ) Reaction ( T-m ) (m) (T-m)
( T )
Both Span Loaded 77.51 93.31 170.82 -26.26 1.09 185.64
Page 109
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-
DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure E
EVALUATION OF WATER CURRENT FORCES Foundations
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.12 m/s
Water current velocity ( max.) = 2 V = 3.00 m/s
HFL = 58.88 m
LWL = 47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Foundingg level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 43 m
58.88 HFL
14.36
Page 110
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Page 111
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure F
Moments due to tilt and shift
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1906.23 T
(LWL case) = 1906.23 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 615.55 T-m
(LWL case) = 615.55 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 1573.44 T-m
(LWL case) = 1677.54 T-m
Page 112
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Actual tilt 1 in T = 1 in 48
Actual shift = 918 mm
ii) Wellcap
Net Weight (HFL case) = 170.24 T
(LWL case) = 170.24 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x H / Tilt (HFL case) = 109.94 T-m
(LWL case) = 109.94 T-m
iii) Well
Net Wt. = Net wt. of well structure - Net wt. of wellcap (HFL case) = 1906.23 T
(LWL case) = 1906.23 T
H= Soffit of well cap - Founding Level = 31.00 m
Moment = Weight x (H/2) / Tilt (HFL case) = 615.55 T-m
(LWL case) = 615.55 T-m
Total Moment due to Tilt & Shift, (Mts) (HFL case) = 2705.67 T-m
(LWL case) = 2948.78 T-m
Page 113
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure G
EVALUATION OF SEISMIC FORCES P2
Page 114
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 47.70 m
33.34 31.34 1.80 0.800 0 35.5 0.221 0.000 1.599 0.354 1.999 1.999 8.50 1.6 1.88 32.01 32.54
31.34 28.00 1.80 0.800 0 40.0 0.184 0.000 4.271 0.786 3.340 3.340 8.50 1.6 10.12 29.46 149.31
28.00 27.00 1.80 0.800 0 40.0 0.184 0.000 5.071 0.933 1.000 1.000 8.50 1.6 4.57 27.49 58.40
27.00 26.00 1.80 0.800 0 40.0 0.184 0.000 5.871 1.081 1.000 1.000 8.50 1.6 5.35 26.49 63.06
26.00 25.00 1.80 0.800 0 40.0 0.184 0.000 6.671 1.228 1.000 1.000 8.50 1.6 6.13 25.49 66.16
25.00 24.00 1.80 0.800 0 40.0 0.184 0.000 7.471 1.375 1.000 1.000 8.50 1.6 6.91 24.49 67.69
24.00 23.00 1.80 0.800 0 40.0 0.184 0.000 8.271 1.522 1.000 1.000 8.50 1.6 7.70 23.49 67.66
23.00 22.00 1.80 0.800 0 40.0 0.184 0.000 9.071 1.670 1.000 1.000 8.50 1.6 8.48 22.49 66.07
22 00
22.00 21 00
21.00 1 80
1.80 0
0.800
800 0 40
40.0
0 0
0.184
184 0.000
0 000 9.871
9 871 1.817
1 817 1.000
1 000 1.000
1 000 8.50
8 50 1
1.6
6 9
9.26
26 21.49
21 49 62.91
62 91
21.00 20.00 1.80 0.800 0 40.0 0.184 0.000 10.671 1.964 1.000 1.000 8.50 1.6 10.04 20.49 58.19
20.00 19.00 1.80 0.800 0 40.0 0.184 0.000 11.471 2.111 1.000 1.000 8.50 1.6 10.83 19.49 51.90
19.00 18.00 1.80 0.800 0 40.0 0.184 0.000 12.271 2.259 1.000 1.000 8.50 1.6 11.61 18.49 44.04
18.00 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.640 0.640 8.50 1.6 7.84 17.68 23.34
17 36
17.36 17 36
17.36 1 80
1.80 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 12 783
12.783 2 353
2.353 0 000
0.000 0 000
0.000 8 50
8.50 1 6
1.6 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.80 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 14.70 1.80 0.800 0 40.0 0.184 0.000 14.911 2.745 2.660 2.660 8.65 1.6 36.65 16.00 47.50
137.36 858.78
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
2
Nφ = ttan ( π/4
/4 + φ/2 ) 3) FOS in
i assessing
i the
h allowable
ll bl pressure shall
h ll b
be taken
k as per A
Appendix
di 44, IRC : 78
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 115
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T-m ) @ R.L.
2
From p
upto gm/cm
g 3
gm/cm
g 3
Kg/cm
g Degree
g T/m2 T/m2 ((Z)) m m m T m 14.70
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.599 14.550 1.999 1.999 8.50 1.6 77.26 32.01 1337.17
31.34 28.00 1.8 0.800 0 40.0 12.764 0.000 4.271 54.518 3.340 3.340 8.50 1.6 612.76 29.35 8975.67
28.00 27.00 1.8 0.800 0 40.0 12.764 0.000 5.071 64.729 1.000 1.000 8.50 1.6 316.75 27.49 4049.85
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 5.871 74.940 1.000 1.000 8.50 1.6 370.99 26.49 4373.20
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 6.671 85.151 1.000 1.000 8.50 1.6 425.24 25.49 4588.06
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 7.471 95.362 1.000 1.000 8.50 1.6 479.49 24.49 4694.43
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 8.271 105.573 1.000 1.000 8.50 1.6 533.73 23.49 4692.31
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 9.071 115.784 1.000 1.000 8.50 1.6 587.98 22.49 4581.70
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 9.871 125.995 1.000 1.000 8.50 1.6 642.22 21.49 4362.60
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 10.671 136.206 1.000 1.000 8.50 1.6 696.47 20.49 4035.00
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 11.471 146.417 1.000 1.000 8.50 1.6 750.71 19.49 3598.91
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 12.271 156.628 1.000 1.000 8.50 1.6 804.96 18.49 3054.33
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.640 0.640 8.50 1.6 543.64 17.68 1618.87
17 36
17.36 17 36
17.36 1 8
1.8 0 800
0.800 0 40 0
40.0 12 764 0.000
12.764 0 000 12 783
12.783 163 163
163.163 0 000
0.000 0 000
0.000 8 50
8.50 1 6
1.6 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17 36
17.36 14 70
14.70 1 8
1.8 0 800
0.800 0 40 0
40.0 12 764 0.000
12.764 0 000 14 911
14.911 190 324
190.324 2 660
2.660 2 660
2.660 8 65
8.65 1 6
1.6 2541 68
2541.68 16 00
16.00 3293 85
3293.85
9383.89 57255.95
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 116
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
ACTIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
33.34 31.34 1.8 0.800 0 35.5 0.221 0.000 1.599 0.354 1.999 1.999 8.50 1.6 1.88 32.01 32.54
31.34 28.00 1.8 0.800 0 40.0 0.184 0.000 4.271 0.786 3.340 3.340 8.50 1.6 10.12 29.46 149.31
28.00 27.00 1.8 0.800 0 40.0 0.184 0.000 5.071 0.933 1.000 1.000 8.50 1.6 4.57 27.49 58.40
27.00 26.00 1.8 0.800 0 40.0 0.184 0.000 5.871 1.081 1.000 1.000 8.50 1.6 5.35 26.49 63.06
26.00 25.00 1.8 0.800 0 40.0 0.184 0.000 6.671 1.228 1.000 1.000 8.50 1.6 6.13 25.49 66.16
25.00 24.00 1.8 0.800 0 40.0 0.184 0.000 7.471 1.375 1.000 1.000 8.50 1.6 6.91 24.49 67.69
24.00 23.00 1.8 0.800 0 40.0 0.184 0.000 8.271 1.522 1.000 1.000 8.50 1.6 7.70 23.49 67.66
23.00 22.00 1.8 0.800 0 40.0 0.184 0.000 9.071 1.670 1.000 1.000 8.50 1.6 8.48 22.49 66.07
22 00
22.00 21
21.00
00 1.8
1 8 0.800
0 800 0 40.0
40 0 0
0.184
184 0.000
0 000 9.871
9 871 1.817
1 817 1.000
1 000 1.000
1 000 8
8.50
50 1.6
16 9.26
9 26 21.49
21 49 62.91
62 91
21.00 20.00 1.8 0.800 0 40.0 0.184 0.000 10.671 1.964 1.000 1.000 8.50 1.6 10.04 20.49 58.19
20.00 19.00 1.8 0.800 0 40.0 0.184 0.000 11.471 2.111 1.000 1.000 8.50 1.6 10.83 19.49 51.90
19.00 18.00 1.8 0.800 0 40.0 0.184 0.000 12.271 2.259 1.000 1.000 8.50 1.6 11.61 18.49 44.04
18.00 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.640 0.640 8.50 1.6 7.84 17.68 23.34
17 36
17.36 17 36
17.36 1 8
1.8 0 800
0.800 0 40 0
40.0 0 184
0.184 0 000
0.000 12 783
12.783 2 353
2.353 0 000
0.000 0 000
0.000 8 50
8.50 16
1.6 0 00
0.00 17 36
17.36 0 00
0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 0.184 0.000 12.783 2.353 0.000 0.000 8.50 1.6 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 0.184 0.000 14.911 2.745 2.660 2.660 8.65 1.6 36.65 16.00 47.50
137.36 858.78
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
2
Nφ = ttan ( π/4
/4 + φ/2 ) 3) FOS in
i assessing
i the
h allowable
ll bl pressure shall
h ll b
be taken
k as per A
Appendix
di 44, IRC : 78
78-1983.
1983
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 117
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Annexure H
PASSIVE EARTH PRESSURE CALCULATION
Water level = 58.88 m
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact. Moment ( T
T-m
m ) @ R.L.
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m 14.70
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.599 14.550 1.999 1.999 8.5 1.6 77.26 32.01 1337.17
31.34 28.00 1.8 0.800 0 40.0 12.764 0.000 4.271 54.518 3.340 3.340 8.5 1.6 612.76 29.35 8975.67
28.00
8. 27.00
7. 1.8
.8 0.800
.8 0 40.0
. 12.764
.76 0.000
. 5.071
5. 7 64.729
6 .7 9 1.000
. 1.000
. 8.5 1.6
.6 316.75
3 6.75 27.49
7. 9 4049.85
9.85
27.00 26.00 1.8 0.800 0 40.0 12.764 0.000 5.871 74.940 1.000 1.000 8.5 1.6 370.99 26.49 4373.20
26.00 25.00 1.8 0.800 0 40.0 12.764 0.000 6.671 85.151 1.000 1.000 8.5 1.6 425.24 25.49 4588.06
25.00 24.00 1.8 0.800 0 40.0 12.764 0.000 7.471 95.362 1.000 1.000 8.5 1.6 479.49 24.49 4694.43
24.00 23.00 1.8 0.800 0 40.0 12.764 0.000 8.271 105.573 1.000 1.000 8.5 1.6 533.73 23.49 4692.31
23.00 22.00 1.8 0.800 0 40.0 12.764 0.000 9.071 115.784 1.000 1.000 8.5 1.6 587.98 22.49 4581.70
22.00 21.00 1.8 0.800 0 40.0 12.764 0.000 9.871 125.995 1.000 1.000 8.5 1.6 642.22 21.49 4362.60
21.00 20.00 1.8 0.800 0 40.0 12.764 0.000 10.671 136.206 1.000 1.000 8.5 1.6 696.47 20.49 4035.00
20.00 19.00 1.8 0.800 0 40.0 12.764 0.000 11.471 146.417 1.000 1.000 8.5 1.6 750.71 19.49 3598.91
19.00 18.00 1.8 0.800 0 40.0 12.764 0.000 12.271 156.628 1.000 1.000 8.5 1.6 804.96 18.49 3054.33
18.00 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.640 0.640 8.5 1.6 543.64 17.68 1618.87
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 17.36 1.8 0.800 0 40.0 12.764 0.000 12.783 163.163 0.000 0.000 8.5 1.6 0.00 17.36 0.00
17.36 14.70 1.8 0.800 0 40.0 12.764 0.000 14.911 190.324 2.660 2.660 8.65 1.6 2541.68 16.00 3293.85
9383.89 57255.95
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22 5 0 as per Appendix 4
22.5 4, IRC : 78-1983.
78 1983
2
Nφ = tan ( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev.. Ht.. x Width
F W
Moment = Force x L.A. Page 118
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM
Checked By: SP
Page 119
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-
17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HT HL HR At R.L. MT
Sr. No. Description
( T ) ( T ) ( T ) m ( T-m )
1 Dead Load 182 78
182.78 63 01
63.01 6499 30
6499.30
2 General Item 46.12 63.51 1662.99
3 Live load 13.81 64.21 507.47
4 Pier Cap 27.41 59.92 890.06
5 Pier 100.67 53.44 2615.87
6 Well Cap 76.61 46.70 1474.63
7 Well 367.75 39.52 4438.38
8 Water current forces 18.69 0.00 288.95
9 Friction force 28.95
10 Active Earth Pressure 14.50 29.67
11 Live Load surcharge 0.00 0.00 0.00
Total 833.83 28.95 848.82 18407.31
i) Well steining
Well cap top level = 47.70 m
Well cap thickness = 2.00 m
Well cap bottom level = 45.70 m
Reference level section of well steining = 27.45 m
2
Cross section area of steining = 31.23 m
3
Volume
m of
f steining
g = 569.89 m
3
Density of concrete of steining = 2.50 t/m
Dry weight of steining = 1424.72 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 85.48 T
Net Weight = 1339.23 T
H= Soffit of well cap - critical section considered = 18.25 m
M
Moment
t = Weight
W i ht x (H/2) / Tilt = 360
360.04
04 T-m
T
Page 120
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266 70 T
266.70
H= Soffit of well cap - critical section considered = 18.25 m
Moment = Weight x H / Tilt = 143.40 T-m
V ML MT MR (
Sr. No. Description
( T ) ( T-m ) ( T-m ) T-m )
1 Superstructure reaction
Dead Load 676.97 -51.36
General items 170.82 0.00
Live Load 62.64 0.00 103.80
Friction force 969.00
Seismic force 18377.64
2 Water current forces 0.00 288.95
3 Pier and Piercap 474.36 0.00
4 Wellcap & steining (net) 1605.94
5 Tilt and shift moments 3089.98
6 Lateral earth pressure
Active earth pressure 29.67
LL surcharge pressure 0.00
Total 2990.7 917.6 18770.4 21912.5
Page 121
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Steining stresses
σmax = V/As + MR/Zs
= 95.77 + 423.40 = 519.17 T/m2
Page 122
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R L in m
R.L. γb γ C φ Ka Nφ γxZ Pressure layer thk Rev.
Rev Ht
Ht. Width FOS Force At R
R.L.
L Fact Mom
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
33.339 31.340 1.8 0.800 0 35.5 0.221 0.000 1.599 0.354 1.999 1.999 8.5 1.6 1.88 32.01 8.57
31.340 27.450 1.8 0.800 0 40.0 0.184 0.000 4.711 0.867 3.890 3.890 8.5 1.6 12.62 29.12 21.10
14.50 29.67
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active
act ve earth pressure coefficient
coeff c ent subject
j to limit of 22.5 0 as p
per Appendix
pp 4,, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ soil
Nφ Nφ
Rev Ht
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 123
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m2 T/m2 (Z) m m m T m (T-m)
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.599 14.550 1.999 1.999 8.5 1.6 77.26 32.01 352.01
31.34 27.45 1.8 0.800 0 40 12.764 0.000 4.711 60.129 3.890 3.890 8.5 1.6 771.56 29.00 1195.25
848.83 1547.26
Where,,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 124
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
2.0 Preamble:
The aim of the present sheet is to design a solid and hollow circular R.C.C.
section subject to combined axial thrust and any-axis bending.
3.0 Input : Y
c.g
n
N.A. y X-bar
θin
X X D
tc θout
Ast(outer)
Ast(inner)
Y
Outer diameter = Do = 8.500 m
Inner diameter = Di = 5.700 m
Shell Thickness = tc = 1.4 m
2
Steel in outer ring = Ast(outer) = 785.4 cm
Effective cover to outer steel = d'out = 0.0975 m
2
Steel in inner ring = Ast(inner) = 502.7 cm
Reinforcement in percentage = %= 0.412
Effective cover to inner steel = d'inn = 0.095 m
2
Allowable tensile stresses in steel = fs = -3600 Kg/cm
2
Allowable compressive stresses in concrete = fc = 150.0 Kg/cm
Modular ratio = m= 10 m
Design force = F= 2990.7 T
Design Moment = M= 20365 2 T-m
20365.2
Eccentricity = e= 6.809 m
Page 125
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
C.g. distance of the effective area from physical centroid = X-bar = 2.749 m
4
Effective moment of inertia = Ieff = 22.461 m
C.g. distance of the effective area from Neutral Axis = y= 0.542 m
Depth of Neutral Axis from extreme compression fibre = n= 2.043 m
6.0 Stresses
2
Concrete stresses = fc = 1104.84 T/m
2
= 110.48 Kg/cm
Steel stresses = fs = -34381
34381 T/m2
2
= -3438.14 Kg/cm
7.0 Checks
Assumed Calculated
n 2.043 2.043 m
Actual Permissible.
2
fc 110.48 150.0 Kg/cm
2
fs -3438.14 -3600.0 Kg/cm
8.0 Refernces :
1) Raina V. K., Concrete bridge practice Analysis,Design and Economics, Tata Mcgraw-Hill
publising company limited, 1991.
2) Young W. C Roark's Formulas for stress and strain , Mcgraw-Hill
W C., Mcgraw Hill Book Company
Company,
sixth edition 1989.
Formulated by -KIRAN
Page 126
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2 V = 2.99 m/s
HFL = 58.88 m
LWL = 47 70
47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 2.00 m
Pier width in long. direction = 7.20 m
Span on both side of the pier = 41.663 m
47.70 LWL
14.36
Page 128
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-
2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
HT HL HR At R.L. M
Sr. No. Description
( T ) ( T ) ( T ) m ( T-m )
1 Dead Load 182 78
182.78 63 01
63.01 6500 02
6500.02
2 General Item 46.12 63.51 1663.17
3 Live load 13.81 64.21 507.53
4 Pier Cap 27.41 59.92 890.17
5 Pier 100.67 53.44 2616.27
6 Well Cap 76.61 46.70 1474.93
7 Well 367.75 39.52 4439.83
8 Water current forces 19.87 0.00 409.28
9 Friction force 28.95
10 Active Earth Pressure 14.52 29.73
11 Live Load surcharge 0.00 0.00
Total 835.00 28.95 850.02 18530.92
i) Well steining
Well cap top level = 47.70 m
Well cap thickness = 2.00 m
Well cap bottom level = 45.70 m
Reference level section of well steining = 27.45 m
2
Cross section area of steining = 31.23 m
3
Volume
m of
f steining
g = 570.01 m
3
Density of concrete of steining = 2.50 t/m
Dry weight of steining = 1425.02 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 85.50 T
Net Weight = 1339.52 T
H= Soffit of well cap - critical section considered = 18.25 m
M
Moment
t = Weight
W i ht x (H/2) / Tilt = 360
360.20
20 T-m
T
Page 129
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
ii) Wellcap
3
Volume of well cap = 113.49 m
3
Density of concrete of well cap = 2.50 t/m
Dry weight of well cap = 283.73 T
Porosity of concrete considered = 15.00 %
Bouyancy due to porosity of water = 17.02 T
Net Weight = 266 70 T
266.70
H= Soffit of well cap - critical section considered = 18.25 m
Moment = Weight x H / Tilt = 143.43 T-m
V ML MT MR
Sr. No. Description
( T ) ( T-m ) ( T-m ) ( T-m )
1 Superstructure reaction
Dead Load 676.97 -51.36
General items 170.82 0.00
Live Load 62.64 0.00 103.80
Friction force 969.11
Seismic force 18501.19
2 Water current forces 0.00 409.28
3 Pier and Piercap 451.06 0.00
4 Wellcap & steining (net) 1606.22
5 Tilt and shift moments 3055.07
6 Lateral earth pressure
Active earth pressure 29.73
LL surcharge pressure 0.00
Total 2967.7 917.8 19014.3 22121.2
Page 130
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Steining stresses
σmax = V/As + MR/Zs
= 95.04 + 427.67 = 522.71 T/m2
Page 131
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
2.0 Preamble:
The aim of the present sheet is to design a solid and hollow circular R.C.C.
section subject to combined axial thrust and any-axis bending.
3.0 Input : Y
c.g
n
N.A. y X-bar
θin
X X D
tc θout
Ast(outer)
Ast(inner)
Y
Outer diameter = Do = 8.500 m
Inner diameter = Di = 5.700 m
Shell Thickness = tc = 1.4 m
2
Steel in outer ring = Ast(outer) = 785.4 cm
Effective cover to outer steel = d'out = 0.0975 m
2
Steel in inner ring = Ast(inner) = 502.7 cm
Reinforcement in percentage = %= 0.4
Effective cover to inner steel = d'inn = 0.095 m
2
Allowable tensile stresses in steel = fs = -3600 Kg/cm
2
Allowable compressive stresses in concrete = fc = 150.0 Kg/cm
Modular ratio = m= 10 m
Design force = F= 2967.7 T
Design Moment = M= 20570 7 T-m
20570.7
Eccentricity = e= 6.931 m
Page 132
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
C.g. distance of the effective area from physical centroid = X-bar = 2.752 m
4
Effective moment of inertia = Ieff = 22.445 m
C.g. distance of the effective area from Neutral Axis = y= 0.529 m
Depth of Neutral Axis from extreme compression fibre = n= 2.028 m
6.0 Stresses
2
Concrete stresses = fc = 1120.53 T/m
2
= 112.05 Kg/cm
Steel stresses = fs = -35230
35230 T/m2
2
= -3523.04 Kg/cm
7.0 Checks
Assumed Calculated
n 2.028 2.028 m
Actual Permissible.
2
fc 112.05 150.0 Kg/cm
2
fs -3523.04 -3600.0 Kg/cm
8.0 Refernces :
1) Raina V. K., Concrete bridge practice Analysis,Design and Economics, Tata Mcgraw-Hill
publising company limited, 1991.
2) Young W. C Roark's Formulas for stress and strain , Mcgraw-Hill
W C., Mcgraw Hill Book Company
Company,
sixth edition 1989.
Formulated by -KIRAN
Page 133
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation
for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
Data
Scour level for pier condition = 33.34 m
Water current velocity ( mean ) V = 2.112 m/s
Water current velocity ( max.) = 2 V = 2.99 m/s
HFL = 58.88 m
LWL = 47 70
47.70 m
Formation level = 63.97 m
Piercap top level = 60.67 m
Wellcap top level = 47.70 m
Founding level = 14.70 m
Diameter of well = 8.50 m
Pier width in trans. direction = 3.50 m
Pier width in long. direction = 5.50 m
Span on both side of the pier = 88 m
58.88 HFL
14.36
Page 135
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-
2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ Ka Nφ γxZ Pressure layer thk Rev. Ht. Width FOS Force At R.L. Fact Mom
2 2 2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m T/m (Z) m m m T m (T-m)
33.339 31.340 1.8 0.800 0 35.5 0.221 0.000 1.599 0.354 1.999 1.999 8.5 1.6 1.88 32.01 8.57
31.340 27.446 1.8 0.800 0 40.0 0.184 0.000 4.714 0.868 3.894 3.894 8.5 1.6 12.64 29.12 21.15
14.52 29.73
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Ka = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Ka x γ x Z For cohesionless soil
=γxZ 2 x C For C -φ
φ soil
Nφ Nφ
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 136
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48
Design By : KM Job: Design of Well Foundation, P2, Kopili Bridge. Doc No. TTS/2012/DN/17, R0
Checked By: SP Date: Dec, 2011.
R.L. in m γb γ C φ KP Nφ γxZ Pressure layer thk. Rev. Ht. Width FOS Force At R.L. Fact Mom
2 2 2
From upto gm/cm 3
gm/cm 3
Kg/cm Degree T/m T/m (Z) m m m T m (T-m)
33.34 31.34 1.8 0.800 0 35.5 9.098 0.000 1.599 14.550 1.999 1.999 8.5 1.6 77.26 32.01 352.32
31.34 27.45 1.8 0.800 0 40 12.764 0.000 4.714 60.169 3.894 3.894 8.5 1.6 772.76 29.00 1198.22
850.02 1550.53
Where
Where,
γ= γb For soil above water level Note : 1) Pressure is calculated at level R.L. upto in the above table
= γb - 1 For soil below water level 2) Value of the angle of wall friction may be taken as 2/3 rd of φ , the angle of repose,
Kp = Columbs active earth pressure coefficient subject to limit of 22.5 0 as per Appendix 4, IRC : 78-1983.
Nφ = tan2( π/4 + φ/2 ) 3) FOS in assessing the allowable pressure shall be taken as per Appendix 4, IRC : 78-1983.
Pressure = Kp x γ x Z For cohesionless soil
= γ xZ xNφ 2 x C x Nφ For C -φ soil
Rev. Ht. = Height of layer after neglecting negative pressure zone
Force = Pressure x Rev. Ht. x Width
Moment = Force x L.A.
Page 137
G:\Tangent\Job Folder\2012_Kopili Bridge\Designs\TTS-2012-DN-17, Pier Well P2\TTS-2012-DN-17, R0, Date 17 Dec 2011 Well Foundation for P2\TTS-2012-DN-17,PierWell-P2(TS),R0 13-01-201220:48