VKVC Pig Traps are available in following various forms:

Available Sizes : 4” NB TO 60” NB

Available ANSI Ratings : ANSI 150# to ANSI 2500#


(FOR PRESSURE IN EXCESS OF 2500# CONTACT VKVC.)

Design Specification : Barrels as per ASME B 31.4 / B 31.8 / B 31.3


QOEC as per ASME SEC. VIII Div.1 / PD 5500

Material Certification : EN 10204 3.1 / EN 10204 3.2

Pigging : Intelligent Pigging / Utility Pigging

Orientation : Horizontal / Vertical / Inclined

Reducer Forms : Eccentric Reducer / Concentric Reducer

End Types : Butt weld End / Flanged End

QOEC Types : Rotary Type / Ring Lock Type / Ring Clamp Type

Code Stamp : For Complete Barrel / For QOEC

Material of Construction: For Barrel - API 5L Gr. B / API 5L Gr. X 42 TO X 70 /


ASTM A 516 GR.70 /ASTM A 106 Gr. B /
ASTM A 333 Gr. 6 (LTCS) /
ASTM A 240 Gr. 304 / Gr. 316 (in stainless steels)
Forgings – ASTM A 105 / ASTM A 694 Gr. F 42 TO 70 /
ASTM A 350 LF 2 (LTCS) /
ASTM A 182 Gr. 304 / Gr. 316 (in stainless steels)

Nozzle Reinforcement : Weldolet / Sockolet / Nippolet / Sweepolet / Threadolet /RF Pad

Saddles : Welded / Clamped

Utility Connections : Kicker / Bypass, Drain connection, Vent Connection,


Purge Connection, Pressure Gauge, Equalization Line,
Pressure Safety Valve Connection, Temperature Safety Valve
Pig Signaller connection and other connections if required

Coatings : Epoxy / 3LPE and others as requested


Inspection & Testing’s

Charpy Test : At MDMT on three Full size specimens


Charpy Value as per Material standard / Client Specification

Hardness Test : Brinell Hardness / Rockwell Hardness


Hardness Value as per Material standard / Client Specification

Hydrostatic Test : Hydrotest of Complete Barrel at min. 1.3 x Design pressure or as


specified in client Specification
Holding Time: Min 4 Hour or as per client spec.

Pneumatic Test : Pneumatic Test of barrel


Pneumatic Test of RF Pad

Functional Test : Functional Test of Barrel by check


a) QOEC Functional Check
b) Gauge Test
c) Pig Signal Functional Check

Gauge Test : Gauge test of Barrel for smooth Pigging Operation

MPI : Wet MPI of Forging surfaces


MPI of Fillet Welds

UT : UT testing of Bevel ends


UT testing of Fillet welds

RT : RT testing of Butt Welds

Holiday Test : Holiday test of Paintings

Sour Service / NACE : As per client’s requirement

HIC / SSC : As per client’s requirement

FEA : As per client’s requirement