EGL.±0.00m.

Capping Beam
300mm Ø RCC Pile @ 400mm C/C
25mm 3mm thk Casing Upto Rock
A A
WALER BEAM

300mm Ø RCC Piles EL.-2.5m.


(05Nos.-20mm) Temporary Excavation Profile
EL.-3.0m.
(Prior To Strut Installation)
SECTION A-A
(SCALE 1:50)
Strut
3.0m Wide
Rock Bench
30°
HORIZONTAL STRUT FORCES
EL.-6.0m. (Exc.Lvl.)
STRUT AT -2.5m = 8 t/m
EL.-6.5m. 0.5m Embedded
PCC Filling(M10)

SCHEDULE OF RCC PILES 75mm


PILE DIA PILE SPACING CONCRETE MIX STEEL GRADE CONSTRUCTION SEQUENCE:-
300mm 400mm C/C M25 Fe 500 1) INSTALL BORED PILES.
2) EXCAVATE ROCK BENCH.
REINFORCEMENT SCHEDULE
3) CUT NOTCH IN ROCK BENCH TO ACCOMMODATE STRUT.
MAIN STEEL LINKS MASTER RING 4) INSTALL WALER BEAM, FLAT PLATE, STIFFNER PLATE.
05Nos.-20mm Ø 8mmØ @150 C/C 12mmØ @1000 C/C 5) INSTALL STRUTS AT EVERY 3.0 C/C.
6) REMOVE ROCK BENCH & EXCAVATE TO FINAL LEVEL.
7) CAST RAFT & RETAINING WALL.
8) CAST BASEMENT FLOOR SLAB WITH CUTOUTS IN SLAB AT STRUT LOCATIONS.
9) DISMANTLE STRUT & WALER BEAM WHEN BASEMENT WALL IS CASTED
TO 1.5m BELOW WALER BEAM LEVEL.