Академический Документы
Профессиональный Документы
Культура Документы
Owner’s Engineer
Contractor
Sub-Supplier
Project
[Housing Complex]
Inspection and Test Plan for Masonry Works
(Using for Concrete block)
Document No. Rev. Page No.
NS2-DH01-P0UYK-770010 B 05 Pages
ID No: NS2-DH01-P0UYK-770010
NGHI SON 2 BOT THERMAL POWER PLANT Rev: B
(2x600 MW) Date: 27.12.2019
TITLE: INSPECTION AND TEST PLAN FOR MASONRY WORKS
Participation by
Applicable Code & Specification;
No. Description of Inspection/Test Process Acceptance Criteria Reporting Format Sampling Frequency Remarks
Check method Sub- Main Owner/
Contractor Contractor Engineer
BLOCK WORK
2.4 Surface roughness, cleaned TCVN 4085:2011 ; ruler TCVN 4085: 2011 Table 4 Item 6.9 NS2-DH01-P0UYK-770010-01 P W S
PLASTERING WORK
Page 1 of 4
ID No: NS2-DH01-P0UYK-770010
NGHI SON 2 BOT THERMAL POWER PLANT Rev: B
(2x600 MW) Date: 27.12.2019
TITLE: INSPECTION AND TEST PLAN FOR MASONRY WORKS
Applicable Code & Specification;
No. Description of Inspection/Test Process Acceptance Criteria Reporting Format Participation by Sampling Frequency Remarks
Check method
I Plastering construction
Tolerance of window sills, column sills, part of TCVN 9377-2:2012; Item 5 table < 3mm (1m length) & 10mm (All
4 NS2-DH01-P0UYK-770010-02 P W W
wall protruding from horizontal and vertical. 4;Vertical tool, level, ruler entire structure length)
Abbreviation P: Performance R: Report Review W: Witness Inspection H: Hold Inspection S: Surveillance Inspection
Page 2 of 4
Code: NS2-DH01-P0UYK-770010-01
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT Rev: B
Date: 27.12.2019
Date:
Sub-Contractor:
Start:
Finish:
Work title:
Area No:
Inspected Item:
1 Setting-Out
1.2 Deviations due to the move of the structure axis line Instrument
CONCLUSION
…………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………
Owner
Contractor
Subcontractor
Page 3 of 4
Code: NS2-DH01-P0UYK-770010-02
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT Rev: B
Date: 27.12.2019
Date:
Sub-Contractor:
Start:
Finish:
Work title:
Area No:
Inspected Item:
CONCLUSION
…………………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………………
Owner
Contractor
Subcontractor
Page 4 of 4