Академический Документы
Профессиональный Документы
Культура Документы
100
300
400
900
300
1:8
1:5
PCC 300
M - 20
4 NO.
6190
6190
300 300 359 300 @ 100 C/C
300
900 500 560 1500 1197 700 1500
300
500 900
500 900
3460 3756 @ 130 C/C
@ 130 C/C
FDN. LVL. 144.815
4060 4356
700
200 mm Levelling
RETURN SECTION course M-15
ABUTMENT SECTION DETAILS OF ABUTMENT
CAP WITH DIRT WALL
4180 4180 NOTE :- Bed concrete outer line not shown in plan.
NOTES :-
300 300 300 300
1500 610 500 970 8460 970 500 610 1500
1. PROPER COMPACTION OF CONCRETE SHOULD BE DONE
2703
4500
204200
WITH VIBRATORS.
20
300
CLIENT :-
AMARWADA - RAMGARH ROAD
Executive Engineer M/s RAJARAM CONSTRUCTION
ISSUED ON 04-01-2020
MP PWD Division WORKING DRAWING OF ABUTMENT &
CHHINDWARA APPD : REVISION - RETURN WALL CH.- 4+541
SAWYTECH ENGINEERING SERVICES
Scale : NTS DRAWN BY A.A.R Dwg No. : MPPWDC / AR / 02 SUB ENG. SUB DIV. OFFICER EXECUTIVE ENG.