Вы находитесь на странице: 1из 1

HAND RAIL POST 20 MM EXPANSION

GAP
1537 1537 1537 1537
200

860 235 @ 100 C/C BINDERS 4 Nos.

200
6400
FIXED HAND FREE HAND
ELEVATION
25 45
4 Nos. 250

250 250 REINFORCEMENT ARRANGEMENT


45 @ 100 C/C 25
FREE HAND A
FIXED HAND
OF HANDRAIL & POST
25
200

A 50 75
4 Nos.
PREMOULDED FILLER ELEVATION @ 150 C/C
MATERIAL GLUED 20 MM EXPANSION
TO PRECAST RAIL APPROACH
JOINT
SLAB
@ 100 C/C A 250 50 @ 150 C/C
@ 150 C/C
30 R.C.C DECK SLAB
275

175
115 PREMOULDED
30 JOINT FILLER
FREE HAND FIXED HAND
A 50
LEVELLING @ 150 C/C
PREMOULDED FILLER 4 Nos. DIRT
COURSE WALL 400
MATERIAL GLUED COMPRESSIBLE
50 CLEAR 3500
TO PRECAST RAIL PLAN 175 FIBRE BOARD
COVER
DETAIL OF PRECAST HANDRAIL

200
4 Nos.

@ 100 C/C CHAMFER


10 X 10 SECTION OF APPROACH SLAB
50 CLEAR 175
COVER 50
75 50 SECTION A-A
75
CHAMFER
50 CLEAR
275 10 X10
COVER
200 4 Nos. 200
50 250
135 8 MM STIRRUPS 235 NOTES:
860

@ 100 MM C/C 4 Nos.


50 8 MM 7 Nos. B B BINDERS
B B 1. CENTRE TO CENTRE SPACING BETWEEN SUCESSIVE VERTICAL POSTS SHOWN
200 BINDERS 200
75 SECTION B-B IN THE ELEVATION SHALL BE ADJUSTED TO SUIT THE LENGTH OF BRIDGE SPAN
30 2 Nos. FOR WHICH THE RAILING IS USED BUT IN NO CASE IT SHALL EXCEED 2000 C/C.
150 50 25
100 WEARING
20 2. REINFORCEMENT OF RAILING POST SHOULD BE SUITABLY ANCHORED IN DECK SLAB.
COAT
300

25 3. CASTING OF POST SHALL BE DONE IN SINGLE POUR AFTER ACCURATELY


POSITIONING THE PRECAST HANDRAIL.
450 4. RAILING SHALL BE CONSTRUCTED ONLY AFTER THE STRUCTURAL CONCERTE OF
R.C.C. DECK SLAB R.C.C. DECK SLAB SUPERSTRUCTURE HAS HARDENED & SHUTTERING IS RELEASED.

150 150 5. EXPANSION GAPS IN RAILING SHALL BE PROVIDED AT THE SAME LOCATIONA AS IN
THE DECK SLAB.
SECTION THROUGH POST SECTION THROUGH POST
NOTE : THE ABOVE IS AS PER SD / 201 OF M.O.S.T. PLATE 6. APPROACH SLAB SHALL NOT BE SUPPORTED ON RETURN WALL.

CLIENT :-
AMARWADA - RAMGARH ROAD
Executive Engineer M/s RAJARAM CONSTRUCTION
ISSUED ON 04-01-2020
MP PWD Division REINFORCEMENT DETAILS OF RAILING &
CHHINDWARA APPD : REVISION - APPROACH SLAB CH.- 4+541
SAWYTECH ENGINEERING SERVICES
Scale : NTS DRAWN BY A.A.R Dwg No. : MPPWDC / AR / 04 SUB ENG. SUB DIV. OFFICER EXECUTIVE ENG.

Вам также может понравиться