2. Item & Activity should be assigning to Transferred EAM Org Also. 3. There should not be an equipment Link. 4. If asset is moved – Activity, Item Attributes, Meters, Failure analysis are also moved. 5. Work orders and cost details will not be moved.
Creation of Asset & Asset – Details (Attributes) fill up.
Meter Assignment – with Asset Number
Inter- Org Transfer of eAM Assets
Item Assign to Other Organizations:
Item – Transactable one.
Activity Assign to other org:
Inter- Org Transfer of eAM Assets
Failure Analysis – Assign with Asset:
Move Asset Process:
Inter Org Transfer:
Inter- Org Transfer of eAM Assets
Confirmation of Asset Transferred:
Other Org – Asset Moved Along with the Details:
Inter- Org Transfer of eAM Assets
Meter – Assign also moved.
Activity Moved
Inter- Org Transfer of eAM Assets
Failure Moved:
Inter- Org Transfer of eAM Assets
Asset Operational Log:
Operational Log:
Along with user defined:
Inter- Org Transfer of eAM Assets
Moved Asset (Transacted Asset – Details from Source Org – Work order Details)