Contents
Foreword4 Design23
Vision23
Opportunity5
Action23
Golf has great potential to Facilities like this typify the habitats, cleaning rivers and streams,
positively contribute towards sentiment that golf can be housing bats, birds and amphibians,
sustainable development across more than a game... they can connecting green corridors and
emerging and established be new recreational facilities linking up wider pedestrian networks.
markets. We are seeing more for golf, walking, cycling
and more new and existing golf and socialising. Golf facilities This work is being done now
facilities developing innovative everywhere, of all shapes and and often goes unnoticed. The
solutions to new problems right sizes, are used as meeting guidelines presented here highlight
across the globe. These facilities spaces for local community some of the growing number of
are generating benefits for their groups and councils, school credible examples where great golf
social and natural environments groups, evening socials, developments are taking place and
whilst providing multiuse coffee clubs, local markets golf continues to be more than a
recreational facilities for all and more. They also play game.
generations. a role in conserving local
GEO Foundation 2017
4
Opportunity
5
Embracing Sustainability
”
shaped and moulded to fit peculiar
and vacant urban sites of many species.
shapes and sizes. These urban golf
facilities, permanent or temporary,
can also serve as multifunctional
hubs for many other uses such as
community meeting rooms or outdoor
education areas.’
Jeff Howes
Jeff Howes Golf design
20
NOR
16
Irie Fields Golf Course, Kittitian Hill, St. Kitts and Nevis
Designed by: Ian Woosnam signature, Gary Johnston EIGCA, European Golf Design 17°23’07”N 62°49’39”W
11
The Golf Development Industry
The SAGCA was formed in 1989 with the purpose of creating a society
of fellow professionals with the intent of meeting regularly to exchange
ideas and experiences, encourage the highest standard of golf course
design and construction, and further advance the status of their golf
course architecture.
12
European Institute of Golf Course Architects (EIGCA)
13
Benefits & Expectations
Value
A transparent and holistic site maximises its attributes An efficient product which runs well,
approach to a project closely and context, leading to greatly is well connected to its community,
integrated with its environment reduced construction and year- has reliable local supply chains
leads to greater knowledge on-year maintenance budgets. and thrives in its surroundings is
of the site and a far easier Product also more than likely to generate
construction process. Time People enjoy playing a golf better profit margins with reduced
savings can be found in the course that speaks of its place. maintenance bills and risk further
permission process through Whether people are visitors down the line.
good site investigations or residents, a genuine golf
and improved stakeholder course experience, true to its
communications of the location, is a strong product. ‘I am delighted to have been part of
opportunities and investment The Olympic golf course in the standard development process
being made. Rio de Janeiro (below) is an and helping the sport to address a
Integration example of a course embracing vital component of its sustainability
Walking and studying the site local vegetation qualities to performance which is crucial for
are fundamental. A great golf create the character of a golf golf’s growth and future success.
development will work creatively course subtly contoured, The next step is to make sure it is
with the site conditions to arrive allowing the site terrain to used in practice – by developers, by
at a responsive and genuine inform the design. investors and governments, and their
solution. The example (opposite) agencies, as a framework to ensure
of Pinehurst No. 2 demonstrates Retention of local qualities – the best possible outcomes from
what can be realised if a natural, historic and cultural – projects in their jurisdiction.’
course responds directly to generates an understandable Richard Holland
the site conditions and evolves attraction to a golf course Director of Markets
accordingly. The discovery and a leading position in the World Wildlife Fund (WWF)
process of understanding a marketplace.
environmental management plan. Photo Credit: ECP Environmental Solutions by Luiza Reis
14
Pinehurst No.2, Pinehurst, North Carolina, United States
Designed by: Donald Ross. | Renovated by: Coore & Crenshaw 35°11’44”N 79°28’26”W
This golf course evolved over time and 40 acres of rough reduction
Lower water use
was reduced back to a style closer to
Less fuel use
the original design intent. Bermudagrass Lower maintenance costs
rough planted in the 1970s was removed, 35 acres of longleaf pine and
and the sandscapes found in the original wiregrass habitat
course of the early 1900s were re-
established. All the sprinkler heads used
to irrigate the rough were removed. The
total number of irrigation equipment
items was reduced from 1,100 irrigation
heads to just 450 heads, half around tees
and greens, the remainder in fairways.
Photo Credit: worldgolf.com
Communications
We live in a well-connected able to stand up proudly and Individuals and governments
society, where individuals feel strongly when communicating are better equipped than ever to
empowered through technology the wider contributions of your identify reality from perception,
and social media to take part operations and investments will generating a growing expectation
in debate and discussion increase your reach and build for projects and investments
on an unprecedented scale. confidence in your audience. to better articulate their social
Transparency is king in this newly and environmental values to
emerging media landscape. Being stakeholders and the wider
community.
01
GO
of opening: 1969)
Photo Credit: Golf du Rhin
15
Support and Recognition
“
OnCourse® Developments The programme is open
provides customised project to every proposed golf
”
Adaptable, open and
services and streamlined course, from large resort affordable is at the core of the
sustainability reporting to developments to smaller what OnCourse® Developments
development teams – support scale golf facilities. stands for…great golf.
for efficient project planning and
comprehensive mapping of key
Supporting great golf
issues combined with confident,
credible and independent • Presenting a strong sustainability case to regulators, investors,
representation of a project’s stakeholders and local communities.
environmental and social value
• Bringing teams together around a consistent sustainability agenda.
to governments, investors and
stakeholders. • Comprehensive and relevant sustainability reporting. International
promotion to media.
OnCourse® Developments
uses three themes – nature, Optional:
resources and community –
• Verification from an accredited
to practically apply the three
independent source.
pillars of sustainability to the
golf development process. • Credible and lifelong recognition
The objective is to tackle the GEO Certified® Development.
broad and complex subject of
sustainability by guiding real-
world decisions and taking
practical actions that make a
difference.
Nature Resources Community
12
16
International Social And Environmental Labelling Alliance
ISEAL Alliance
Typical timeline
Stage One: Preparation Stage Two: Design Stage Three: Construction Stage Four: Completion
1. Expression of Interest 1. Initial team meeting 1. Construction team meeting 1. Gather final information
2. Project Appraisal 2. Develop goals/targets with team 2. Record construction progress 2. Site visit with independent verifier
3. Registration 3. Site visit with independent verifier against goals/targets 3. Verifier issues Certification Report
4. On-going liaison with project team 3. Site visit with independent verifier 4. GEO Certified® development
5. Finalise Blueprint V1 4. Finalise Blueprint V2
6. Verifier approves Blueprint V1 5. Verifier approves Blueprint V2
17
Preparation
18
Rockwind Community Links, New Mexico, United States
Redesigned: Andy Staples ASGCA, Staples Golf Design 32°46’18”N 103°12’05”W
19
Photo Credit: European Golf Design
O chemicals used EF
IELDS 20
I
16
IR
Vision Action
Defining a clear vision for a golf Turning a vision into a spatial
development helps to retain representation of a proposal ‘We sense that golf development
a focus and assists in decision involves a complex process is shifting back to the traditional
making throughout a project. of consideration and testing core values of the game, with
It provides perspective during of ideas. The breadth and courses that evoke a distinct and
detailed site discussions and depth of issues influencing natural sense of place, unique
clarity around basic decisions this moment can be wide and responsive to their site and
of site organisation and design ranging, depending on site conditions. With attention to design
parameters. conditions. The onus is on detail, these courses can be more
the project team to ensure a fun, affordable and accessible to
Preparatory studies of areas comprehensive and forensic play, with lower construction and
such as hydrology, topography examination of the factors operating costs.’
and ecology combine with initial at play before beginning the Bill Coore, ASGCA
regulatory meetings to form the process. Coore & Crenshaw
basis for a project vision. A vision
borne out of some constraints If we assume the selection
or some discipline is often more of an appropriate site, broad
creative and focused. Without organisational decisions of technical data and careful
some constraints, projects are relating to, for example, assessment in order to arrive at
left seeking something, with total access, scale and structure, will a preferred solution. During the
freedom. strongly shape the long-term design stage, having an individual
success of a project. Bringing team member with an overview
together the components of of the project will help in holding
a golf development into a onto the balance of land-use and
design plan involves the input maintaining the project’s vision.
23
Design
The section below briefly describes some of the typical areas of consideration for a golf development. These
areas should not be seen as stand-alone elements but rather as interdependent parts. For more details on
any of the topics below, refer to the VSS or online guidance from the GEO.
24
West Cliffs Golf Course, Portugal
Designer: Cynthia Dye, ASGCA. Dye Design Group 39°24’58”N 9°14’30”W
01
W
Generating this scene from the native plants and landscape typologies Water features and wetland
will result in a landscape that sits better in its surrounds. This golf offer good opportunities to
course will also be less demanding in the long term, as it is not fighting exploit and integrate good
against the rising tide of native species encroaching on something ecological principles into the
forced and false. West Cliffs golf course (above) is one where the golf development. A locally led
native colourful coastal habitat contributes greatly to the overall approach to planting choice
character of the course and helps the course to sit comfortably in the is very resourceful – locally
wider landscape. found species will naturally
propagate better and require less
water and fertiliser as they are
better adapted to local climatic
‘Our designs are first and foremost conditions.
driven by the desire to create a course
that embraces its native surrounds.
Within this framework, we work to
create a course that would be sound
strategically, interesting and fun to
play for all classes of golfers. This
can manifest itself in numerous ways
such as the turfgrass selection for the
course, greens design or in allowing
the native vegetation and existing
conditions to be the main constituent
U
E ST ART
TL for the out-of-play areas.’
20
CAS
14
25
Examples
Set in the Quinta do Lago Estate through 24th in GolfWorld Top 100
undulating pine woodland and alongside Over 70 different bird species
the spectacular Rio Formosa estuary,
one of the seven natural wonders of
Portugal, the golf course benefits from
the natural views and atmosphere of the
estuarine landscape. The area is popular
not just for golf but also for hiking, tennis,
cycling and bird watching – all activities
which can be undertaken on and around
the golf course.
Photo Credit: San Lorenzo GC
26
Jinji Lake Golf Club, Suzhou, China
Designed by: Jeff Lawrence ASGCA, Gary Player Design 31°17’10”N 120°42’02”E
17
JI
management with no irrigation, fertiliser
or controls used in out-of-play areas. Photo Credit: Gary Player Design
Old South Golf Links, Hilton Head Island, S.C. United States
Designed by: Clyde Johnston ASGCA, Clyde Johnston Designs 32°13’59”N 80°48’50”W
16
27
Design
Drainage
A full understanding of how the water, saving time, resources When setting out a golf development
watershed of a site works forms and effort in construction and from the start, there is no better time
the basis for how to go about maintenance. Understanding to plan significant savings and future-
finding a drainage solution. the natural drainage patterns proof the development. Consider first
Finding nature-led solutions of the site should not only if an irrigation system is needed. If
to drainage is a highly creative influence the drainage layout it is, think about where is it needed,
part of the design process, but also the routing of the golf priority areas, and where savings can
as seen at Wychwood Park course, placement of water be made. Could the
GC (opposite), where open features and the strategy Grass Selection
channels and swales are used involved in individual holes. Selecting the right grass for a locality
to create habitats and clean Prioritising where and how is critical to the quality and long-term
much drainage is needed is costs of a golf course such as at the
‘When designed properly, ground an art which takes confidence Bear Trace at Harrison Bay (below).
contours can be very effective in and knowledge. A number of relevant factors require
guiding water off play surfaces, Irrigation consideration when selecting the
negating the need for large The scarcity of water and its grass species for a particular location
amounts of subsurface drainage rising price is a significant or surface: temperature, sunlight
(a hefty cost). We know mounds consideration for sustainable hours, water availability, microclimate
are typically always well drained development. The responsible and soil properties. It is important
and surface swales can help move use of water is paramount to take an informed and objective
water off the play zones so it makes when planning growth and decision when selection is made
a lot of sense to utilise or even build development for a country – the choice will have potentially
undulations for drainage purposes or region. It represents big the biggest influence on resource
and improved playing surfaces.’ business with potentially efficiency long term.
Paul Jansen hundreds of thousands of
Jansen Golf Design annually available monetary
and Construction savings to be made.
28
Los Robles Greens Golf Course, California, United States
Redesigned by: Jason Straka ASGCA, Fry/Straka Global Course Design, LLC
34°10’28”N 118°52’42”W
Managed by: Arcis Golf, LLC
'I’m convinced that it is best to use a grass that won’t die. On the putting greens, I can plant a grass that will
die without intensive maintenance, because I am always going to provide intensive maintenance to the greens.
But fairways cover well over 10 ha on most courses, and it just is not possible to provide intensive maintenance
over such a large area. If I plant a grass that won’t die, the surface can be maintained aggressively to create
the desired playing surface. I can mow the fairways shorter, but the grass won’t die. I can keep the fairways
dry, even going without supplemental irrigation during the dry season, but the grass won’t die. I can maintain
the fairways with a slow growth rate, avoiding frequent applications of water and fertiliser, and still the grass
won’t die.'
Micah Woods, Chief Scientist Asian Turfgrass Center
29
Österlens Golfklubb, Sweden
Designed by: Pierre Fulke Design 55°37’18”N 14°16’24”E
ÖS
15
area and secure areas for storage and/or
preparation of any hazardous materials. Photo Credit: Österlens Golfklubb
30
Design
Accessibility
Golf developments should to a development such as to reduced resource use and
strive to connect both physically cycleways, fitness circuits visual impact of a development,
through pathway networks and and bridleways. The example whilst offering an element of local
green infrastructure and also of the project in San Bartolo heritage and instant character to
to the society and businesses in Peru (opposite) is a fine a new development.
around them. For a development example of a social and sport
to be considered successful, initiative offering profound The maintenance facility, as in the
it needs to contribute to the community benefits through example at Österlens Golfklubb
community and remain a steward golf. (opposite), offers excellent
of the site in the long term. Clubhouses and other opportunities to integrate
buildings ecological benefits to the building
Open lines of communication and The siting and orientation of design and recapture greywater
transparency add to a sense of the clubhouse should be a for machinery wash-down or
confidence and connection with key discussion point as the flushes.
the community. This sense of general arrangement of a
trust can mean a lot in the design site comes together. These 'The planning, orientation and materiality
process. When the project team initial decisions give a better of the clubhouse are key areas that
assess and adapt the designs, opportunity to maximise good should be addressed at an early stage,
good neighbour relations can in conjunction with a clubhouse architect.
low-energy design principles
It is important for the masterplan to draw
save months if not years of time such as reducing resource
these factors together within the overall
prior to construction. demand and maximising layout - and re-visit them as the design
thermal efficiency and healthy proceeds. Construction programme
Creating a close and safe physical air circulation patterns. and costs will be positively affected by
integration between golf and such early consideration. Importantly, the
non-golf activities can help to The re-use of existing proper enjoyment of the facility by users
break down perceived barriers structures for future golf and staff will be enhanced.'
between activities and add assets buildings can inherently lead Mungo Park, ACArch
Clubhouse Architect
20
CAS
approximately a quarter of the typical cost. Photo Credit: St Andrews Links Trust
31
Photo Credit: ECP Environmental Solutions by Luiza Reis
2stx the fauna diversity
GC RIO
PIC
M
20
OLY
During the construction stage, be incorporated into course infrastructure can be invaluable in
careful planning and good site layout and can enrich the the efficient long-term operations
preparation help to ensure the overall project, or valuable of the golf course.
design is executed well and the on-site materials such as
process of construction runs sand or natural stones can be
smoothly. At this stage, there is uncovered and used to save I only realized after building a
generally a greater awareness time and money. This is a good couple of courses that even more
amongst the local community time to develop relations, build important than minimalist design,
of the potential impact of the a strong local supply chain for is minimalist construction. When
development. The landscape construction work and later to we resist the temptation to re-
usually goes through a rapid and supply the operations of the shape fairways, and incorporate
very visible transformation during course. the natural contours, we preserve
development. Communication of the integrity of the topsoil and
progress can help ease concerns Consideration should be its valuable ecosystem. When
and promote good practices given to involving the future someone says our course looks
being carried out on site. superintendents in the building like it's been there for 100 years,
work. As the future stewards of that's because most of it HAS
The construction stage is a time the golf course, their in-depth been there all along.
where efficiencies can be found. knowledge of how the course
Flexibility in the construction plan was built, where potential Tom Doak
is important to allow for these problem areas might be and all Renaissance Golf Design
efficiencies: ‘found’ elements can the locations of underground
35
Construction
Site Preparation
Before construction begins, bring ancillary uses such as ‘I will work very methodically
protection and awareness are parking, storage yards, wash- in the clearance stage.
two of the immediate priorities. down areas, meeting rooms, Usually three or four phases
Make sure everyone on site is shelters, sanitation water and of clearance, at each stage
aware of any protected areas power connections. These carefully assessing what is
through staff briefings and clear structures can be in place for revealed and amending the
signage around the compound. several years so should be golf hole to ‘‘fit’’ within the
Ignorance of these sensitive given proper consideration. existing scenery. Often we will
site areas can be problematic Site clearance find valuable landscape assets
on sites, potentially leading to This phase of construction that bring quality and character
complications and damages, work provides an opportunity to the golf course.’
both financial and reputational, to integrate the golf course Jorge Santana, EIGCA
for the project. closely with existing GolfDesign
Access and Compound landscape character. Working
The design and positioning of outwards from the centreline
the construction compound in stages offers the greatest
or recycling what is created on
should be well thought through: control in this respect, at each
site is preferable before looking at
does the site call for two stage seeking to retain and
ways to treat and dispose of waste.
compounds? Can we site it on integrate valuable existing
Creative thinking is needed to come
the future maintenance area? qualities into the final solution.
up with site-specific solutions for
Can it be away from adjacent Waste each facility, as in the example of
residents? Does it minimise the The management of waste Ljunghusens Golf Club in Sweden
need for roads to be laid down? on site should be approached (opposite).
Is it away from waterways or from the point of view of
sensitive receptors? Is it secure? reducing the amount of waste
The compound will likely created. Beyond that, re-using
36
Construction
heat pump
LJU
15
Located in the hills north of Loulé and Over 1,800m of riparian habitat
at the confluence of two rivers in the created
Algarve region. In close collaboration Removal of 100% of the exotic
plant species in the river corridor
with the local authority, the construction
work involves restoring and enhancing
the river corridors to improve the flood
water capacity of the river’s flood plain,
benefiting towns and villages previously
at risk downstream. There are also
significant associated benefits for local
wildlife with increased biodiversity and
new native habitats.
Photo Credit: Ombria Resorts
37
Construction
A new facility forms a key part of a new 100% recycled irrigation water
equipment testing facility for the R&A. 800m2 of wildflower meadow
Situated at the far end of the existing 161 new native trees
driving range at Kingsbarns golf course, 227m2 of wetland habitat
the project is an example of resourceful
land planning and partnership involving
all parties. Previously unused land
was brought into use with a unique
facility that transformed the land into
a healthy wetland habitat, extensive
wildflower meadow and fully permeable H
HOUSE 20
AR
17
38
Construction
Grow-In
The final stage in the construction nutrients need to be available of this stage – be patient and wait
process is the establishment to the grass at this time to for a window of opportunity. Starting
of the final playing surface. avoid failure of plants and by investing in good quality seed,
Once the seedbed is prepared wasted resources. appropriately selected for the
it is important to get the conditions, will help to significantly
establishment process underway Lining up the correct reduce the risk of failure or poor
to bind the soils and knit the conditions through good take up of the grass, which could
course together. Correct levels of planning and management of result in delays to opening times
water, sunlight, temperature and resources is key to the success and associated loss of revenue.
39
Special Thanks
16
40
Keith Duff EIGCA Fraser Smart, RIAS Links Design Studio
Bruce Charlton, ASGCA Robert Trent Jones II Jorge Santana, EIGCA GolfDesign
Cynthia Dye, ASGCA Dye Design Group Dr. Max Whitten Maleny Golf Club
Dave Sansom Photographer Stig Persson Ljunghusens Golf Club
Antonio Santos San Lorenzo Magnus Jivén Ljunghusens Golf Club
Jeff Lawrence, ASGCA Gary Player Design Benjamim Silva ProGolf Construction
Anton Ortner, EIGCA Olazabal Design António Carlos Miranda ProGolf Construction
Matthias Nemes Olazabal Design Ville Tallbacka Ombria Resorts
Paul Jansen Jansen Golf Design David McLay Kidd DMK Golf Design
Paul Carter, CGCS The Bear Trace Dr. Steve Otto The R&A
Micah Woods Asian Turfgrass Centre Paul Kimber, EIGCA Kimber Golf Design
Ken Moodie, EIGCA Creative Golf Design Dom Furore Photographer
Gustav Andersson Österlens Golf Club Mike Wood, EIGCA Mike Wood Consulting
Augustin Piza, EIGCA Piza Golf Design John Kelly Kittitian Hill
Gordon Irvine Askernish Golf Club Francisco Cadete West Cliffs Golf Links
Aidan Bradley Photographer Colin Young Lebovic Golf Club
Mungo Park, ACArch Mungo Park Architect
Gordon Moir St Andrews Links Trust
41
2 Quality Street, North Berwick.