BILL OF QUANTITY

OPEN ACCESS PERTAMINA RU VII KASIM

NO URAIAN PEKERJAAN VOL SAT

1.4 Temporary Facilities dan Utilities Kontraktor (Bangunan : lantai


plester keramik, dinding setengah bata plester setengah
multipleks, atap rangka baja dan multiroof galvalum, painting)
1.4.1 Temporary Office :
a. Temporary Office Main Contractor 550 M2
b. Temporary Office for Subcontractor 300 M2
1.4.2 Temporary Camp :
a. Temporary Camp for Main Contractor 600.00 m2
b. Temporary Camp for Subcontractor 800.00 m2
1.4.3 Recreation Hall Center
Membuat area olah raga sementara 924.00 m2
1.4.4 Temporary Meal Shelter
Membuat canteen sementara 225.00 m2
1.4.5 WareHouse Building
Membuat gudang sementara 288.00 m2
1.4.6 Maintenance Shop & Workshop
Membuat workshop sementara 225.00 m2
1.4.7 Laydown Area
Pembersihan lahan, Pemadatan, dan pemasangan pagar pengaman 40,000.00 m2
Temporary Access from Jetty-1 to New Tank Area, Workshop,
1.4.8
Laydown Area, dan Temporary Office
- Excavated Soil 2,000.00 m3
- Disposal 1,600.00 m3
- Subgrade 400.00 m2
- Granular Subbase Course 2,000.00 m2

GRAND TOTAL 1. 4 Temporary Facilities dan Utilities Kontraktor *)

IV CIVIL WORKS
4.0 Mobilisasi / Demobilisasi equipment, tools & personil 1 Ls
4.1 Penyiapan dan Pematangan Lahan
Clearing & Grubbing 45,219.00 m2
Deforesting 19,565.00 m2
Filling & Compact
- Excavated Soil
- Borrow Soil 17,336.00 m3
Disposal
Slope Protection
- Turfing 1,200.60 m2
- Seeding
Landscaping
- Tree, Shrub and Grass 34,519.00 m2
- Seeding

4.2 Pengadaan dan Pekerjaan Pancang Pondasi Tank


4.2.2 Concrete Filling
- Concrete Filling fc= K-210 Kg/cm3 486.32 m3
- Rebar (110 Kg/m3) 53.50 ton
- Multiplek 12mm 262.25 m2
4.2.3 Pile Head Treatment Spun pile 928.00 Nos

4.3 Pekerjaan Pembuatan Jalan Baru (ROAD & PAVING)


4.3.1 Asphalt Road
- Excavated Soil 3,017.18 m3
- Disposal 3,017.18 m3
- Subgrade 6,034.35 m2
- Granular Subbase Course 6,034.35 m2
- Granular Base Course 6,034.35 m2
- Asphalt Base Course 5,218.50 m2
- Asphalt Surface Course 5,218.50 m2
- Asphalt Wearing Course 5,218.50 m2
- Asphalt Spray 5,218.50 m2
- Concrete 1,565.55 m3
4.3.2 Concrete Road
- Excavated Soil 6,250.00 m3
- Disposal 6,250.00 m3
- Subgrade 12,500.00 m2
- Granular Subbase Course 12,500.00 m2
- Granular Base Course 12,500.00 m2
- Vapor Barrier 12,500.00 m2
- Welded Wire Fabric 25,000.00 m2
- Concrete (t=200) 2,500.00 m3
- Expansion Joint 1,250.55 m
- Contraction Joint 3,751.65 m
4.3.3 Light Duty (t=100)
- Excavated Soil 351.93 m3
- Disposal 351.93 m3
- Vapor Barrier 3,561.56 m2
- Welded Wire Fabric 3,561.56 m2
- Concrete 358.04 m3
- Expansion Joint 194.78 m
- Contraction Joint 583.28 m
4.3.4 Gravelling
- Excavated Soil 1,801.59 m3
- Disposal 1,801.59 m3
- Gravelling 24,021.17 m2
4.3.5 Traffic Signs and Safety Guards
- Guard Post 20.00 nos

4.4 Pekerjaan Pembuatan Pondasi, Stucture, dan Bundwall


4.4.1 Embankment
Earth Dike, Embankment
- Excavation (open gutter) 332.80 m3
- Filling (elevated soil) 2,206.72 m3
- Concrete lining Mutu beton K350, Type 1 385.92 m3
- Compacted sand 343.04 m3
- Wire fabric 150x150x6 3,257.34 m2
- HDPE sheet 1,738.24 m2
4.4.2 Stair
- Form 7.64 m2
- Rebar 0.41 ton
- Concrete 5.83 m3
4.4.3 Foundation
Excavation 2,938.25 m3
Backfilling 16.45 m3
Asphalt Sand (50mm) 55.89 m3
Coarse Sand (50mm) 0.01 m3
Leveling Concrete (50mm) 67.80 m3
Disposal 2,925.70 m3
Forming 801.75 m2
Rebar Work 445.66 ton
Anchor Bolt dia. 3/4 in 140.00 nos
Sleeve & Coduit Pipe (PVC 2" dia) 40.00 m
Concrete 4,456.62 m3
4.4.4 PIT and POND ( excluding Sewer & Drainage )
Excavation 192.59 m3
Disposal 192.59 m3
Forming 209.31 m2
Rebar Work 7.43 ton
Waterstop 37.10 m
Concrete (K-300) 61.96 m3
Levelling Concrete (K-175) 1.91 m3
4.4.5 Pipe Sleeper
Excavation 8,452.41 m3
Backfilling 6,761.93 m3
Lean Concrete (50mm thk.) 162.29 m3
Sand bedding 811.43 m3
Disposal 1,690.48 m3
Forming 4,919.37 m2
Rebar Work 192.63 ton
Concrete 1,481.74 m3
4.4.6 Fence & Gate
Pagar chainlink termasuk tiang post, H=2.1 M 667.00 m2
Swing Gate 2.00 set
4.4.7 Building and Shelter
Shelter New Fire Pump
Excavation 571.71 m3
Backfill 36.01 m3
Soil Disposal 144.02 m3
Compacted soil 144.00 m2
Sand bedding 18.00 m3
Lean concrete 8.92 m3
Structural Concrete 85.81 m3
Formwork 648.49 m2
Deformed bar 2.98 ton
Brick Masonry Works 75.00 m2
Plastered 150.00 m2
Wiremesh Gate 1.00 unit
Monolithic cemen floor finishing, with hardener 144.00 m2
Painting Outdoor (Weathershield) 150.00 m2
Local Metering Room
Excavation 12.96 m3
Backfill 2.59 m3
Soil Disposal 10.37 m3
Compacted soil 9.00 m2
Sand bedding 1.30 m3
Gravel Layer 1.30 m3
Lean concrete 0.77 m3
Structural Concrete 6.23 m3
Formwork 315.98 m2
Deformed bar 1.07 ton
Brick Masonry Works 45.60 m2
Plastered 91.20 m2
Wooden Door 1.00 unit
Monolithic cemen floor finishing, with hardener 9.00 m2
U-Ditch drainage 12.00 m'
Ceramic Floor Tiles (Glaze Ceramic Tile 400x400) 9.00 m2
Gypsum Board 13mm THK w/ Steel Frame 9.00 m2
Painting Wall Indoor 45.60 m2
Painting Outdoor (Weathershield) 45.60 m2
Painting Plafond 9.00 m2
Gedung Substation
Excavation 207.36 m3
Backfill 41.47 m3
Soil Disposal 165.89 m3
Compacted soil 144.00 m2
Sand bedding 20.74 m3
Gravel Layer 20.74 m3
Lean concrete 8.25 m3
Structural Concrete 51.06 m3
Formwork 154.30 m2
Deformed bar 6.77 ton
Brick Masonry Works 91.20 m2
Plastered 182.40 m2
Wooden Door 1.00 unit
Monolithic cement floor finishing, with hardener 144.00 m2
U-Ditch drainage 24.00 m'
Ceramic Floor Tiles (Glaze Ceramic Tile 400x400) 144.00 m2
Gypsum Board 13mm THK w/ Steel Frame 144.00 m2
Painting Wall Indoor 91.20 m2
Painting Outdoor (Weather shield) 91.20 m2
Painting Plafond 144.00 m2
Oil Movement Control Room
Excavation 207.36 m3
Backfill 41.47 m3
Soil Disposal 165.89 m3
Compacted soil 144.00 m2
Sand bedding 20.74 m3
Gravel Layer 20.74 m3
Lean concrete 8.25 m3
Structural Concrete 51.06 m3
Formwork 154.30 m2
Deformed bar 6.77 ton
Brick Masonry Works 91.20 m2
Plastered 182.40 m2
Wooden Door 1.00 unit
Monolithic cement floor finishing, with hardener 144.00 m2
U-Ditch drainage 24.00 m'
Ceramic Floor Tiles (Glaze Ceramic Tile 400x400) 144.00 m2
Gypsum Board 13mm THK w/ Steel Frame 144.00 m2
Painting Wall Indoor 91.20 m2
Painting Outdoor (Weather shield) 91.20 m2
Painting Plafond 144.00 m2
Process Pump Shelter
Excavation 251.75 m3
Backfill 50.35 m3
Soil Disposal 201.40 m3
Compacted soil 148.75 m2
Sand bedding 25.17 m3
Lean concrete 9.07 m3
Structural Concrete 37.13 m3
Formwork 341.49 m2
Deformed bar 2.98 ton
Brick Masonry Works 78.00 m2
Plastered 156.00 m2
Wiremesh Gate 3.00 unit
Monolithic cemen floor finishing, with hardener 148.75 m2
Painting Outdoor (Weathershield) 156.00 m2

GRAND TOTAL IV. CIVIL WORKS *)


*) Harga Sudah termasuk : HSE MCU, APD, Mess Barak, Konsumsi
OF QUANTITY
TAMINA RU VII KASIM SORONG

Harga Satuan (Rp) Harga Sub Total (Rp)


Harga Total (Rp)