INVENTORY & CONDITION SURVEY FOR BRIDGES

PWD Rd Ledum-Tene Road


Project Name :- C/o Pashighat - Ledum-Tene Road (20.00 to 40.00km)
Date of Survey: 09-08-2019
Average Type of Structures Details of Superstructure Proposal
Type of Name of
Span Length Clear Ht. of HFL (m) Thickness of Widening/Rec
Bridge River and Carriageway Total Direction Remarks/
S.No. Chainage Arrangement of Bridge Water Ventway Below Girder/Slab onstruction/Re
(Major/Min Type of Super Sub Conditions width Width (m) of Flow Proposals Type of
(m) (m) way above Bed Foundation Features Type FRL (m) pair Span
or/ROB) Crossings
Level (m) structures structures (VG/G/F/P/VP) Bridge

Deck RCC Good

RCC Carriageway (m) 8.5 Good Right to


1 22+075 Minor - 1x11.6 11.6 4.5 Solid slab Open 1.5 0.9 7 8.5 Retained - - -
Abutment Footpath (m) _ - Left

Railing RCC Good


Deck Steel Poor

Penneng Bailey RCC Carriageway (m) 3.3 Poor Right to Retained & RCC
1 25+732 Minor 1x18.5 18.5 16.3 6.5 Open 1.5 0.3 3.3 4.2 Right side 1x18.0
River Bridge Abutment Footpath (m) _ _ Left Reconstruction Girder

Railing Steel Poor


Deck RCC Good

RCC Carriageway (m) 8.5 Good Right to


3 - Minor - 1x11.5 11.5 3.3 Solid slab Open 1 0.9 7 9 Retained - - -
Abutment Footpath (m) _ _ Left

Railing RCC Good


Deck Steel Poor

Bailey RCC Carriageway (m) 3.3 Poor Right to Retained & RCC
2 32+080 Minor Dekam River 1x18.5 18.5 16.3 5.3 Open 1.5 0.3 3.3 4.2 Right side 1x18.0
Bridge Abutment Footpath (m) _ _ Left Reconstruction Girder

Railing Steel Poor


Deck Steel Poor

Bailey RCC Carriageway (m) 3.9 Poor Right to Retained & RCC
3 33+651 Minor Sille River 1x31.0 31 27.8 5.5 Open 1.5 0.3 3.9 5 Left Side 2x15
Bridge Abutment Footpath (m) _ _ Left Reconstruction Girder

Railing Steel Poor


Deck RCC Good

RCC Carriageway (m) 8.5 Good Right to


6 - Minor - 1x10.9 11.5 3 Solid slab Open 1 0.9 7 9 Retained - - -
Abutment Footpath (m) _ _ Left

Railing RCC Good


Deck RCC Good

RCC Carriageway (m) 8.5 Good Right to


7 - Minor - 1x10.9 11.5 3.5 Solid slab Open 1 0.9 7 9 Retained - - -
Abutment Footpath (m) _ _ Left

Railing RCC Good


Deck Steel Poor

Bailey RCC Carriageway (m) 3.9 Poor Right to At same RCC


4 39+770 Minor Dobu River 1x30.5 30.5 27.5 7.8 Open 2.0 0.3 3.9 5 Reconstruction 2x15
Bridge Abutment Footpath (m) _ _ Left Location Girder

Railing Steel Poor