QUALITY CONTROL
Project Title: Installation and Hook-up of FSUs at T50 and T51 Well areas
Project No.: 14481
Witness Point:
Hold Point: - Approve Point
UT
HYDROSTATIC
Item Location:
Zakho, Industrial Zone, Full Tech
TEST
Grid/CoordinatesPROCEDURE
Area/Zone:
Zakho, Industrial Zone
Sub-Area:
(Adnan) Facilities
Details of Inspection:
Rev.
Request Date
Issued By: Description
Mohammad of Changes
Ahmadimehr Issued
Signature: FullChecked Approved
Tech - QA / QC Manager
Comments:
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 1 of 6
INSPECTION REQUEST
Project No: 14481
QUALITY CONTROL
1. No.:
Project Purpose
14481 …………………………………..………………………….. .3
Project Title: Installation and Hook-up of FSUs at T50 and T51 Well areas
2. Limit
Contract of ApplicationContractor:
No.: TWK-PO-14481 …………………………..………………………3
Full Tech Co.
3. IR-RW-2018-003
IR No.: Preference Codes and Standards ………………………………………3
System/Sub-System: Piping Discipline: Mechanical Piping
Works
4. toAbbreviations
be Inspected: Piping
…………………………..………………………,……..3
Date and Time of Inspection: 12/11/2018
5. Responsibilities ……………………………………………….………..3
ITP Activity No.:
6. Test Package …………………………..…………………….…………3
- UT test
ITP No.: 0003 Ref Drawing No.:
7. Flushing …………………………..…………………………..………..4
8. Pressure Test …………………………..……………………………….5
Witness Point:
Hold Point: - Approve Point
9. Drying…………………………..………………………….……..…….6
UT
Item10. Reinstatement
Location: …………………………..………………………………6
Area/Zone: Sub-Area:
Grid/Coordinates
Zakho, Industrial Zone, Full Tech Zakho, Industrial Zone
(Adnan) Facilities
Details of Inspection:
INSPECTION REPORT
Comments:
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 2 of 6
INSPECTION REQUEST
Project No: 14481
QUALITY CONTROL
6.2-
Comments: Marked up drawings including piping isometric, P&ID shall be consist in test
pack to indicate the blinded point and pressure guages locations.
Comments By Comments Date Cleared Date
6.3- The line consists in test pack shall be completed and all N.D.T requirements
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
have to be done prior to hyd. Test so welding work shall not be permitted after the
Inspected By: Name Signature Date
test.
Contractor QC Inspector
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 3 of 6
INSPECTION REQUEST
Project No: 14481
QUALITY CONTROL
7. FLUSHING
Hold Point: - Witness Point: Approve Point
UT
7.1- Flushing shall be done through the piping system continiously by fresh water
Item Location: Area/Zone: Sub-Area:
downward from the highest
Zakho, Industrial Zone, Full Tech
point to removeZakho,
Grid/Coordinates all debrises and trashes inside the
Industrial Zone
(Adnan) Facilities
piping system.
Details of Inspection:
Comments:
7.5- Check valves shall be removed from pipeline or install in open position befor
flushing
Comments By and Hyd. Test. Comments Date Cleared Date
7.6- All the valves included in test loop shall be kept open during flushing and
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
Hyd. Test.
Inspected By: Name Signature Date
Contractor QC Inspector
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 4 of 6
INSPECTION REQUEST
Project No: 14481
QUALITY CONTROL
Hold Point: -
Pt = 1.5 * 15 = 22.5 BARG
Witness Point: Approve Point
UT
Details of Inspection:
8.3- The piping system to be tested shall be filling with water in upward direction
to let the air purging.
Ultrasonic test in:
- new welded joint in pipes
8.4- A reciprocating pump shall be used for pressure test.
Request Issued By: Mohammad Ahmadimehr Signature: Full Tech - QA / QC Manager
Comments:
8.6- Two calibrated pressure gauges shall be installed at highest and lowest
points
Comments By also accessable for reading during inspection.
Comments Date Cleared Date
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
8.7- All guages used for Hyd. Test shall be calibrated every two weeks or and 4
Inspected By: Name Signature Date
times of using and have ranges 1.5 or 2 times greater than test pressure.
Contractor QC Inspector
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 5 of 6
INSPECTION REQUEST
Project No: 14481
QUALITY CONTROL
Contract8.9-
No.: Temproray
TWK-PO-14481 Contractor:
Gasket shall beFull
usedTechfor
Co.flanges that will be open after Hyd.Test .
IR No.: IR-RW-2018-003 System/Sub-System: Piping Discipline: Mechanical Piping
8.10- All the welding and threated joints shall be left uninsulated and paintless at
Works to be Inspected: Piping
the time of Hyd. Test12/11/2018
Date and Time of Inspection:
and masking tape shall be removed.
ITP Activity No.:
- UT test
ITP No.: 8.11-
0003 Water for austenitic stainless steel shall contain
Refless thanNo.:
Drawing 50 ppm of chloride
Ions.
Witness Point:
Hold Point: - Approve Point
UT
8.12- If any leakage happens during pressure test it shall be repaired immediately
Item Location: Area/Zone: Sub-Area:
and the defeated line retested.
Zakho, Industrial Zone, Full Tech
Grid/Coordinates
Zakho, Industrial Zone
(Adnan) Facilities
Details of Inspection:
8.13- When the test pressure result found acceptable all the vents shall be opened
and release the pressure from the line.
Ultrasonic test in:
- new welded joint in pipes
9- DRYING
Request Issued By: Mohammad Ahmadimehr Signature: Full Tech - QA / QC Manager
Comments:
10- REINSTATEMENT
Comments By Comments Date Cleared Date
all the line component that removed for Hyd. Test shall be correctly reinstalled
FOR ADDITIONAL COMMENTS PLEASE ATTACH A SEPARATE SHEET AND TICK THE BOX
and original casket install.
Inspected By: Name Signature Date
Contractor QC Inspector
DNO Inspector
Project Name: Installation & Hook-up of FSUs in T50 and T51 well areas Page 6 of 6