Dear Sir,

In addition to previous qoute for tag xxxxxxxxxxxxx, below is qoute for remaining (7) equipment
having tags-

Sr. Tag Title Applicable codes Remark


No.
1  80-T-9001 ERU DGA TANK API-650, Add 2 API Storage tank
2 80-T-9002 20 % CAUSTIC API-650, Add 2 API Storage tank
STORAGE TANK
3 80-T-9007 CONDENSATE POT ASME Sec VIII, Div 1 ASME Vessel with IBR
FOR 17-E-9003A/B and IBR requirements
4 17-V-9102 CONDENSTAE POT ASME Sec VIII, Div 1 ASME Vessel with IBR
FOR 17-E-9102 and IBR requirements

5 17-V-9105 CONDENSTAE POT ASME Sec VIII, Div 1 ASME Vessel with IBR
FOR 17-E-9108 and IBR requirements

6 80-V-9009 ERU DGA DRAIN ASME Sec VIII, Div 1 ASME Vessel buried in sand
DRUM and EEMUA 190

7 17-V-9108 CAUSTIC DRAIN ASME Sec VIII, Div 1 ASME Vessel buried in sand
DRUM and EEMUA 190

Based on quick glance through received inputs for above (7) equipment, below shall be our service
and quote-

1. We shall provide only engineering calculation support. No drawings are considered


in our scope.
2. Calculations shall be performed with use of combination of tools such as crack copy
of software (handling API-650 tank calculations), MathCAD , Microsoft Excel etc
based on requirements.(No licence copy shall be used).
3. Only soft copy of mechanical calculation report shall be submitted. No hard copies
will be provided. 

Our cost for above service will be :-

Sr. Tag Title Cost (INR) Schedule (Each equipment)


No.
1  80-T-9001 ERU DGA TANK 12000
2 80-T-9002 20 % CAUSTIC 12000 15 working week (total for both tank)
STORAGE TANK
3 80-T-9007 CONDENSATE POT 14400
FOR 17-E-9003A/B 10 working days
4 17-V-9102 CONDENSTAE POT 14400
FOR 17-E-9102 8 working days

5 17-V-9105 CONDENSTAE POT 14400 8 working days


FOR 17-E-9108
6 80-V-9009 ERU DGA DRAIN 13500 10 working days
DRUM

7 17-V-9108 CAUSTIC DRAIN 13500 8 working days


DRUM

Notes:

1. Mechanical calculation cost includes spec reading, performing mechanical calculations,


compliance with additional code/ standards (IBR, EEMUA 190) manual calculations if required.
Accordingly schedule also increased.

Schedule:-

1. First vessel report shall be submitted within (1) working week after receipt of job award. This
includes spec reading and job bulletin along with calculations.

2. Mechanical calculations for 2nd vessel shall be submitted in next (5) working days. 3rd will be
submitted in subsequent (5) working days.

3. FEA report for tag 17-DR-9102 A/B shall be submitted in 15 working days.

Payment terms:-

Payment for each vessel is expected after submission of that vessel. Online payment is preferable.
Please feel free to revert back for any further clarifications required.

Thanks and warm regards,