Академический Документы
Профессиональный Документы
Культура Документы
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 1 of 6
TABLE OF CONTENTS
1. REVISION RECORD............................................................................................................................................2
2. PURPOSE............................................................................................................................................................4
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 2 of 6
3. SCOPE.................................................................................................................................................................4
4. REFERENCES.....................................................................................................................................................4
4.1. Contract documents.........................................................................................................................................4
4.2. Contractors Submittal.......................................................................................................................................4
5. DEFINITIONS / ABBREVIATIONS.......................................................................................................................4
5.1. Definition..........................................................................................................................................................4
5.2. Abbreviations....................................................................................................................................................5
6. RESPONSIBILITIES.............................................................................................................................................5
7. PROCEDURE.......................................................................................................................................................5
7.1. Substrate Preparation......................................................................................................................................5
7.2. Application........................................................................................................................................................5
7.3. Dense Floors....................................................................................................................................................6
7.4. Porous Floors...................................................................................................................................................6
8. HEALTH, SAFETY AND ENVIRONMENT...........................................................................................................6
9. ATTACHMENTS...................................................................................................................................................6
9.1. Inspection Checklists........................................................................................................................................6
9.2. Inspection Test Plan.........................................................................................................................................6
9.3. Risk Assessment..............................................................................................................................................6
9.4. Technical Data sheet (TDS).............................................................................................................................6
9.5. Material Safety Data Sheet (MSDS)................................................................................................................6
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 3 of 6
1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All
previous revisions are hereby superseded and are to be destroyed.
Rev Date By Chkd. Approved Description of Revisions
0 First issue
Signature field
Revision
Revision
Number
Date
Prepared by Checked by
Reviewed
By Construction Technical QA/QC MEP Co- Sub-
Manager Manager Engineer HSE Officer ordinator contractor
Approved
By Project
Manager
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 4 of 6
2. PURPOSE
This Method Statement covers the preparation and application of MASTERTOP 20, a surface hardener
and dustproofed for use on cementitious surface.
3. SCOPE
1. This method statement is applicable to all exposed floors and at raised floor area.
4. REFERENCES
4.1. Contract documents
1. Project Specification :- Division 9, Section 09200
2. Contract Drawings :-
5. DEFINITIONS / ABBREVIATIONS
5.1. Definition
1. Project -(Replace with project name)
2. Client -(Replace with clients name)
3. Developer -(Replace with developers name)
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 5 of 6
5.2. Abbreviations
1. Engineer - Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MAT - Material Submittal
8. MEP - Mechanical Electrical Plumbing
9. MET - Method Statement
10.MIR - Material Inspection Request
11.MSDS - Material Safety Data Sheet
12.PPE -Personal Protective Equipment
13.PQP -Project Quality Plan
14.PTW -Permit To Work ( Working at Height or enclosed spaces)
15.RA -Hazard Identification and Risk Assessment
16.RFIA - Request for Inspection and Approval
17.SPD - Shop Drawing
18.TBM - Temporary Bench Mark
6. RESPONSIBILITIES
1. Prepare and Update - QA &QC Manager
2. Review - Construction Manager
3. Approval - Project Manager
4. Implementation - Section Engineer
- Quality Control Engineer
7. PROCEDURE
7.1. Substrate Preparation
1. Remove paint, mortar droppings and weak laitance,
2. Remove oil, grease, and fats with a degreasing solution.
3. Sweep or vacuum the floor to remove all dust and dirt.
4. If the floor is to be washed clean, allow it to dry out completely before applying the MASTERTOP 20.
5. Protect glass, metal, paintwork and others from splashes.
7.2. Application
1. Prior to application stir the MASTERTOP 20.
2. Pour MASTERTOP 20 onto the clean dry concrete surface and spread evenly using a soft broom.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Project Doc. No.
TEC-096700-MET-DoR-001
Name) (Rev No.)
METHOD STATEMENT Issue Date 02 October 2013
Method statement for application of a surface hardener and Rev. Date NA
dustproofed for use on concrete floor (Mastertop 20) Pages 6 of 6
3. Brush the MASTERTOP 20 backwards and forwards over the floor to ensure even penetration.
4. As the floor dries out remove any MASTERTOP 20 that is not being absorbed, using a squeegee or
mop.
5. Apply a second treatment the following day in a similar manner to the first. MASTERTOP 20 that is not
absorbed must be washed off before it sets hard.
6. If required, a third coat can be applied.
1. WATCHPOINTS