Вы находитесь на странице: 1из 17

AEE/O&M/CHEYYUR

D 101 RETURN DETAILS OF LT SERVICE CONNECTION EFFECTED FOR THE MONTH OF 08/2019
Opening Received Effected Cancelled Balance Under Investiation
NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD
Domestic
CYR-I 6 6.5 6 6.5 5 6.5 1 1.5
CYR-II 4 10.95 4 10.95
KVR 51 23.7 51 23.700
KPM 0 0 7 9.585 6 8.625 1 0.96
TOTAL 61 41.15 13 16.085 11 15.125 0 0 57 37.11 0 0
Commercial
CYR-I 2 2.3 3 114.3 2 2.3 1 112
CYR-II
KVR 2 6.9 2 6.9
KPM 0 0 13 21.36 13 21.36 0 0
TOTAL 4 9.2 16 135.66 15 23.66 0 0 3 118.9 0 0
ST.Light
CYR-I
CYR-II
KVR
KPM 0 0 12 9.06 12 9.06
Total 12 9.06
Hut
CYR-I
CYR-II
KVR
KPM
OHT
CYR-I
CYR-II
KVR
KPM 0 0 11 8.592 11 8.592
Total 0 0 11 8.592 11 8.592
RegII B-I
CYR-I
CYR-II
KVR
KPM
TOTAL
3A1
CYR-I 2 2.000 2 2 2 2
CYR-II 1 0.87 1 1.265 2 2.135
KVR
KPM
TOTAL 3 2.870 3 3.3 0.0 0.0 0.0 0.0 4.0 4.1 0.000
III B IND(NEW)
CYR-I
CYR-II 0 0 0 0 0 0 0 0 0 0 0
KVR 1 110 1 110
KPM
TOTAL 1 110 1 110
III B IND(ADDL)
CYR-I
CYR-II 0 0 0 0 0 0 0 0 0 0 0
KVR 1 90 1 90
KPM 1 90
Total 1 90
Agriculture
CYR-I
CYR-II 0 0 0 0 0 0 0 0 0 0
KVR
KPM
TOTAL 0 0 0 0
Temporary
CYR-I
CYR-II
KVR
KPM 1 3.35 1 3.35
TOTAL 0 0 1 3.35 0 0 0 0 1 3.35 0

CHENGALPATTU EDC
D 101 RETURN DETAILS OF LT SERVICE CONNECTION EFFECTED FOR THE MONTH OF 08/2018

Under
Investiati
Opening Received Effected Cancelled Balance on
CGL/EDC NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD

1 Domestic 61 41.15 13 16.085 11 15.125 57 0

2 Commercial 4 9.2 16 135.66 15 15.125 3 118.9

3 ST.Light 12 9.06 12 9.06

4 Hut

5 OHT 11 8.592 11 8.592

6 RegII B-I

7 3A1 3 2.870 3 3.3 0.0 0.0 4.0 4.135

8 III B IND(NEW) 1 110 1 110

9 III B IND(ADDL) 1 90 1 90

10 Agriculture 0 0 0 90

11 Temporary 0 0 1 3.35 0 0 1 3.35


III B NEW PENDING
SL NO Section NAME OF THE CONSUMER Appl No/dt Sanction no & dt Payment dt

1 CYR-1 nil

2 CYR-II nill
1. Gopal Rao 1)5310419156/26.4.19
load 110kw

3 KVR

4 KPM
III B ADD LOAD
SL NO Section NAME OF THE CONSUMER Appl No/dt Sanction no & dt Payment dt

1 CYR-1 nil

2 CYR-II nil

1)5310419161/29.4.19
load 24kw
3 KVR 1)selvaraj 2) Dhayanithi 2)66 kw
4 KPM nil
CHEYYUR SUB DIVISION
DETAILS OF MONTHLY PROGRESS ON REPLACEMENT OF POLES FOR THE MONTH OF 08/2019
SL NO Section Total no of damaged Damaged pole Identified Damaged pole Replaced Balanced to be replaced
7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ
1 CYR-I 0 0 0 0 0 0 0 0 0 0 0 0
2 CYR-II 64 11 4 2 66 11
3 KVR 0 0 0 0 0 0 0 0 0 0 0 0
4 KPM 5 8 5 0
69 11 0 12 0 0 7 0 0 66 11 0

SL NO Opening balance for damaged pole Identification of damaged pole Replacement of damaged pole Closing balance
7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ 7.5 mtr 9.14 mtr RSJ
69 11 0 12 0 0 7 0 0 66 11 0

SL NO Section Name of the location Guarding Arrangement Pencing Arrangement Closing balance
1 CYR-I
2 CYR-II
3 KVR
4 KPM
AEE/ O&M/ CHEYYUR
INSPECTION AND RECTIFICATION OF SERVICES FOR THE MONTH OF 08/2019
Routine Inspection Division Mass Raid CircleMass Ride
Achievement Achievement Achievement
Sl no scetion Services at the Target
Beginning of the LT LT Non- % of LT LT Non- % of LT LT Non- % of
Month HT Power Power Total Total HT Power Power Total Total HT Power Power Total Total
1 CYR -1 nil
2 CYR-II nil 33 33
3 KVR 100 3 36 100 139
4 KPM nil
Total
AEE/O&M/CHEYYUR
MASS RAID COLLECTION REPORT
Nature of Extra
Sl.No Section Name of the Consumer Village SC NO Tariff Theft Leavy PR No/Dt Compound PR No/Dt Total O&M/APTS

1 CYR-I nil

2 CYR-II nil

3 KVR nil

4 KPM nil
AEE/O&M/CHEYYUR
MASS RAID INSPECTION RETURN
MASS RAID INSPECTION OF SERVICE TRAIFF WISE
Nameof the Division
Sl.no
section or CIRCLE LT LT.NON
HT POWER POWER TOTAL IA IIA IIB II C III B VI V TOTAL
CIRCLE nil
CYR-I
1 DIVISION nil

CIRCLE nil
2 CYR II
DIVISION nil

CIRCLE nil
3 KVR
DIVISION nil

CIRCLE nil
KPM
4 DIVISION nil
REPLACEMENT OF DAMAGED CONDUCTOR 08/2019

Replacement of damaged conductor


sl no Section

ACSR7/2.50 ACSR 7.3.50

1 CYR-I 0 0 0

2 CYR-II 0 1.8 1.8

3 KVR

4 KPM 0 0
TOTAL 0 1.8
IMPROVEMENT PROPOSAL
Distribution Transformer Total no of feeders Feeder loaded Feeder under voltage
Sl no Section Total Over load % HT LT Total HT LT HT LT
NO % NO % NO % NO %

1 CYR-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 CYR-II 86

3 KVR 164 5 5 330 335 20 5 320

4 KPM 0 0 0 0 0 0 0 0 0 0 0 0 0

250 5 0 5 330 335 0 0 20 0 5 0 320 0

IMPROVEMENT PROPOSAL EXECUTED DURING THIS MONTH


New Transformer Enhancement of Exg Transformer Laying of new lines Replacement of aged con (IMP)
Over head Cables Over head Cables
Section KVA Total NO KVA Total HT LT HT LT HT LT HT LT

CYR-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

CYR-II 0 0.6

KVR 100 2 2 100 2 0 0 2 1.5 0 7

KPM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KM

KM
AEE /O&M/CHEYYUR
TRANSFORMER ENERGISATION RETURN 08/2019
Agency of
execution Newly Remark
O&M/constr Date of Energized Enhanced from to
Sl no Section Name of distribution and SS NO uction Enegisation capacity Make make KVA/KV

1 CYR-I 0 0 0 0 0 0 0

2 CYR-II 0 0 0 0 0 0 0

3 KVR 2 0 0 0 0 0 0

4 KPM 5 0 0 0 0 0 0

TOTAL
KVR Keelarkollai O&M 26.07.19 100 KVA
Kadalur Veepenchery O&M 30.07.19 100 KVA
KPM IPDS DT Kadapakkam SSXXV 13.08.19 25KVA Sarayu
Kadapakkam SS XXVI 13.08.19 25KVA Sarayu
Kadapakkam SS VIII 13.08.19 25KVA Sarayu
Kadapakkam SS IX 13.08.19 25KVA Sarayu
Vilampur SS 13.08.19 25KVA Sarayu
CHEYYUR SUB DIVISION
REVAMPING OF BOARD SYSTEM PREVENTION OF THEFT OF ENERGY
20% dop in No HT SC"S No of SC" s No of Amount No of cases misuse Amount Remarks
consumption Inspected referd to theft levied Sc for constuction levied SC
Total no of found in HT in col(3) Enforcement cases Sc wise detected wise
HT scs SC" s in col (3) wise
Section inspected

CYR-I 0 0 0 0 0 0 0 0 0

CYR-II 0

KVR 1 0

KPM 0 0 0 0 0 0 0 0 0

TOTAL 1 0 0 0 0 0 0 0 0

20% dop in No LT/CT No of SC" s No of Amount No of cases misuse Amount Remarks


consumption SC"S referd to theft levied Sc for constuction levied SC
Total no of found in LT/CT Inspected Enforcement cases Sc wise detected wise
LT/CT scs SC" s in col(3) in col (3) wise
Section inspected

CYR-I 0 0 0 0 0 0 0 0 0

CYR-II 5

KVR 0

KPM 0 0 0 0 0 0 0 0 0

TOTAL 5 0 0 0 0 0 0 0 0
CHEYYUR SUB DIVISION
ACCIDENT RETURN
Section DATE & Time Location Fatal / Electrical or Departmental
of Accident of the Non Mechnical or Non
Accident Fatal Departmetal
Name /Minor
Age& sex
of human
being Brief details of Accident
TANGEDCO
DISCONNNECTED, RECONNECTED AND DISMANTLED SERVICES

Name of Sub Division : AEE/O&M/CHEYYUR Month 07/2019


Date Sent

Position of diconnecteed
No of services service stannd
Name of No of disconnected for more
No of No of the No of than six month
discounnect disconnecte services service disconnnect
section Name of the ed services d services reconnnecte dismantled ed services
category at the at thhe end
during th d during the during the
beginning of of the
the month month month month monnth

Estimate to Sanctioned
be prepared bbut
with in six More than send simantled
months six months sanctioned pending

CYR-1 Power
Non Power 85 366 306 145 93 52
Total
CYR-II Power
Non Power 38 57 74 21 3 18
Total
KVR Power
Non Power 218 84 199 153 58 33
Total
KPM Power 172 79 93 0
Non Power 0
Total 0