Вы находитесь на странице: 1из 2

CURRENT TRANSFORMER TEST REPORT

Usage
Auxiliary transformer Installation location Ship unloading
purpose
1.Nameplate
Type Circuit
Frequency IL
Manufacture
Code R S T
Terminal 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2
Transformation
Ratio
Rated Output
Accuracy Class
Serial No.
2.Test Insulation Resistance:
Insulation Resistance(MΩ)
Windings
R S T
P1-1S1 2S1 E(MΩ)
1S1-2S1 P1 E(MΩ)
2S1-1S1 P1 E(MΩ)

Applied instrument:
3.Test Polarity:

Applied instrument:
4. Test DC Resistance:

Phase Winding Resistance (Ω)

1S1-1S2
R 2S1-2S2

S N/A

1S1-1S2
T 2S1-2S2

Applied Instrument:

Page 1 of 2
CURRENT TRANSFORMER TEST REPORT

Usage purpose Auxiliary transformer Installation location Ship unloading


5. Test Ratio:
Phase R S T
Windings 1S1-1S2 2S1-2S2 1S1-1S2 2S1-2S2

Pri. Current (A)


Sec. Current (A)
Test Ratio
Applied Instrument:
6.V-A Characteristic Test:
Windings Current(A) 0.5 1 2 3 4 5
1S1-1S2
R
2S1-2S2
1S1-1S2
S Voltage(V)
2S1-2S2
1S1-1S2
T
2S1-2S2
Applied instrument:
7.AC Withstand test
Primary winding Test voltage(KV) Time (min) Result
P1-P2
Applied instrument:
8.Test conclusion:

Tested Date Temperature

Date: Date: Date:


Tested By: Approved By: Witnessed By:

PT.TRUBA JAYA ENGINEERING CNTIC PLN / JMK

Page 2 of 2

Вам также может понравиться