Вы находитесь на странице: 1из 3

Portal RATOL & Rates PreMo

CAWANGAN KONTRAK DAN UKUR BAHAN 05.11.2018

Work Item Unit Overall Average (RM)


SEWERAGE No Location Range (RM) Average (RM) RM 2170.83
DRAIN
A 1000.00 - 1575.00 1287.50
Surface Water Channels
Connections To Existing Works B 500.00 - 500.00 500.00
Connect 225mm diameter pipes to existing 225mm D 4000.00 - 5175.00 4725.00
diameter pipework including all requisite connectors
and fittings all as per drawing No. ...........................,
test all connections and make good any defects and
leave the whole pipework in perfect
SEWERAGE Item Location Range (RM) Average (RM) RM 2694.00
DRAIN
A 2000.00 - 2140.00 2070.00
Surface Water Channels
Testing Drains B 2500.00 - 2500.00 2500.00
Test the whole of the Sewerage System in the C 1500.00 - 3000.00 2250.00
presence of the S.O with water or other approved
means before trenches are filled in, make good any E 1000.00 - 5000.00 3000.00
defect, re-test and on completion leave the whole F 2000.00 - 5300.00 3650.00
system in perfect working order to the entire
satisfaction of the S.O
SEWERAGE Item Location Range (RM) Average (RM) RM 2237.50
SEWERAGE
C 2000.00 - 5000.00 3500.00
TESTING
Test the whole of the sewerage system in the E 2000.00 - 5000.00 3500.00
presence of the S.O with water or other approved F 1500.00 - 2000.00 1750.00
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole H 200.00 - 200.00 200.00
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Pipe Leakage Test' between manhole work
at the end of the installation to the satisfaction of the
S.O.
SEWERAGE Item Location Range (RM) Average (RM) RM 2000.00
SEWERAGE
TESTING
Test the whole of the sewerage system in the
presence of the S.O with water or other approved

1/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 05.11.2018

Work Item Unit Overall Average (RM)


means before trenches are filled in, make good any C 2000.00 - 2000.00 2000.00
defect, re-test and on completion leave the whole
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Air Leakage Test' between manhole work at
the end of the installation to the satisfaction of the
S.O.
SEWERAGE Item Location Range (RM) Average (RM) RM 3583.33
SEWERAGE
C 2000.00 - 3000.00 2500.00
TESTING
Test the whole of the sewerage system in the E 3000.00 - 5000.00 4750.00
presence of the S.O with water or other approved F 2000.00 - 5000.00 3500.00
means before trenches are filled in, make good any
defect, re-test and on completion leave the whole
system in perfect working order to the entire
satisfaction of the S.O.
Allow for 'Water Leakage Test' between manhole work
at the end of the installation to the satisfaction of the
S.O.

2/3
Portal RATOL & Rates PreMo
CAWANGAN KONTRAK DAN UKUR BAHAN 05.11.2018

Nota Catatan
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

3/3