Вы находитесь на странице: 1из 20

Cost Estimate Page 1

Description Qty Price UM Draw Me Total


1 IMPORTANT: BE SURE TO INCLUDE
2 SALES TAX AND DELIVERY CHARGES
3
4 LAND
5 • Lot Price 0.00 0.00 0.00
6 • Closing Costs on Lot 0.00 0.00
7 • Interest On Lot 0.00 0.00
8 0.00 0.00
9 TOTAL LAND (LINES 5-8) 0.00 0.00 0.00
10 LAND
11 DESIGN
12 * Architecture 0.00 0.00
13 • Engineering 0.00 0.00
14 • Blueprints 0.00 0.00
15 0.00 0.00
16 TOTAL DESIGN (LINES 12-15) 0.00 0.00 0.00
17
18 CONSTRUCTION LOAN
19 • Appraisal 0.00 0.00
20 • Point(s) 0.00 0.00
21 • Closing Costs 0.00 0.00
22 • Interest 0.00 0.00
23 • Builder's Risk Insurance 0.00 0.00
24 • Initial Survey 0.00 0.00
25 0.00 0.00
26 TOTAL LOAN (LINES 19-24) 0.00 0.00 0.00
27
28 PERMITS
29 • Septic Tank 0.00 0.00
30 • Building 0.00 0.00
31 • Electrical (usually included in electrician's quote) 0.00 0.00
32 • Mechanical (HVAC) (usually included in heating quote) 0.00 0.00
33 • Plumbing (usually included in plumber's quote) 0.00 0.00
34 • Tree Removal 0.00 0.00
35 • Curb Cut 0.00 0.00
36 0.00 0.00
37 TOTAL PERMITS (LINES 29-37) 0.00 0.00 0.00
38
39 UTILITIES
40 • Underground Electric Service 0.00 0.00
41 • Water Tap and Meter 0.00 0.00
42 • Sewer Tap and Connect Fee 0.00 0.00
43 • Temporary Electric Power 0.00 0.00
44 0.00 0.00
45 TOTAL UTILITIES (LINES 40-44) 0.00 0.00 0.00
46
47
48
49 PAGE TOTALS (LINES 9, 16, 26, 37, 45) 0.00 0.00 0.00
50
UM = Unit
Note: Measure
For each item(ea,
onsq ft, etc.)
your © 1990-2012
estimate enter a quantity (Qty), Home Building Answers
a unit price (Price), and the
amount (if any) you plan to pay personally (Me) rather from your construction loan
(Draw). For "Lump Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and
the Lump Sum quote in the Price Column. Excel will do all of the other calculations
including what will be paid for each item from your construction loan draw, the total for
each item, Section Totals, Page Totals, and Summary Page Totals.
B C D E F G H I J
2 Cost Estimate Page 2
3 Description Qty Price UM Draw Me Total
4 51 SITE PREPARATION
5 52 • Rough Stake 0.00 0.00
6 53 • Clearing, Grading, Hauling 0.00 0.00
7 54 • Fill Dirt 0.00 0.00
8 55 • Locate Corners 0.00 0.00
9 56 0.00 0.00
10 57 TOTAL SITE PREP (LINES 52-55) 0.00 0.00 0.00
11 58
12 59 FOOTINGS
13 60 • Layout, Dig, and Pour 0.00 0.00
14 61 • Steel 0.00 0.00
15 62 • Concrete 0.00 0.00
16 63 • Drains 0.00 0.00
17 64 TOTAL FOOTINGS (LINES 60-63) 0.00 0.00 0.00
18 65
19 66 FOUNDATIONS
20 67 • Concrete 0.00 0.00
21 68 • Brick 0.00 0.00
22 69 • Block 0.00 0.00
23 70 • Mortar 0.00 0.00
24 71 • Sand 0.00 0.00
25 72 • Steel 0.00 0.00
26 73 • Vents 0.00 0.00
27 74 • Damp Proofing 0.00 0.00
28 75 • Backfill 0.00 0.00
29 76 • Labor 0.00 0.00
30 77 • Foundation Survey 0.00 0.00
31 78 0.00 0.00
32 79 TOTAL FOUNDATIONS (LINES 67-77) 0.00 0.00 0.00
33 80
34 81
35 82
36 83
37 84
38 85 PAGE TOTALS (LINES 57, 64, 79) 0.00 0.00 0.00
39 86
40 87
41 88
42 89
43 90
44 91
45 92
46 93
47 94
48 95
49 96
50 97
51 98
52 99
53 100
54 UM
Note:= Unit Measure
For each item(ea,
onsq ft, etc.)
your © a1990-2012
estimate enter a quantity (Qty), unit price Home
(Price),Building Answers
and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
55 Price Column. Excel will do all of the other calculations including what will be paid for each
item from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.
Cost Estimate Page 3
Description Qty Price UM Draw Me Total
101 SLAB (IF APPLICABLE)
102 • Fill Dirt 0.00 0.00
103 • Sand 0.00 0.00
104 • Backfill Labor 0.00 0.00
105 • Polyethelene 0.00 0.00
106 • Wire Mesh 0.00 0.00
107 • Styrofoam (Perimeter Insulation) 0.00 0.00
108 • Steel 0.00 0.00
109 • Grade Stakes 0.00 0.00
110 • Form Materials 0.00 0.00
111 • Concrete 0.00 0.00
112 • Set Up and Finishing 0.00 0.00
113 0.00 0.00
114 TOTAL SLAB (LINES 102-112) 0.00 0.00 0.00
115
116 SOIL TREATMENT FOR TERMITES 0.00 0.00
117
118 FRAMING - FLOORS
119 • Sills 0.00 0.00
120 • Steel Posts 0.00 0.00
121 • Steel Beams 0.00 0.00
122 • Microlams 0.00 0.00
123 • Joists 0.00 0.00
124 • Hangers 0.00 0.00
125 • Cross Bracing 0.00 0.00
126 • Floor Decking 0.00 0.00
127 • Glue 0.00 0.00
128 0.00 0.00
129 FRAMING - WALLS
130 • Base Plates 0.00 0.00
131 • Studs 0.00 0.00
132 • Top Plates 0.00 0.00
133 • Header Materials 0.00 0.00
134 • Corner Bracing 0.00 0.00
135 • Sills, Jacks, and Cripples 0.00 0.00
136 • Back Out Materials 0.00 0.00
137 • Insulated Sheathing 0.00 0.00
138 • Chimney Framing Materials 0.00 0.00
139 • Bracing Materials 0.00 0.00
140 0.00 0.00
141 0.00 0.00
142 0.00 0.00
143 TOTAL FLOOR AND WALL FRAMING (LINES 119-139) 0.00 0.00 0.00
144
145
146 PAGE TOTAL (LINES 114, 116, 143) 0.00 0.00 0.00
147
148
149
150
UM = Unit
Note: Measure
For each item(ea,
onsqyour estimate enter a quantity (Qty),©a 1990-2012
ft, etc.) Home Building
unit price (Price), Answers
and the amount
(if any) you plan to pay personally (Me) rather from your construction loan (Draw). For "Lump
Sum" quotes enter a quantity of 1 in the Qty (quantity) Column, and the Lump Sum quote in the
Price Column. Excel will do all of the other calculations including what will be paid for each item
from your construction loan draw, the total for each item, Section Totals, Page Totals, and
Summary Page Totals.

Click "Page 4" below


Cost Estimate Page 4
Description Qty Price UM Draw Me Total
151 FRAMING - CEILINGS
152 • Beams 0.00
153 • Ceiling Joists 0.00 0.00
154 • Headers and Trimmers 0.00 0.00
155 0.00 0.00
156 FRAMING - ROOF
157 • Truss Package 0.00 0.00
158 • Bracing Materials 0.00
159 • Ridge Board 0.00 0.00
160 • Ridge Rafter 0.00 0.00
161 • Valley Rafter 0.00 0.00
162 • Rafters 0.00 0.00
163 • Lookout Material 0.00 0.00
164 • Barge Rafter 0.00 0.00
165 • Dormer Materials 0.00 0.00
166 • Cricket Materials 0.00 0.00
167 • Roof Decking 0.00 0.00
168 • Roof Clips 0.00 0.00
169 • 15# Felt 0.00 0.00
170 • Gable Vents 0.00 0.00
171 • Strong Ties 0.00 0.00
172 • Framing Labor 0.00 0.00
173 0.00 0.00
174 CEILING AND ROOF FRAMING (152-172) 0.00 0.00 0.00
175
176 TOTAL FRAMING (LINES 143, 174) 0.00 0.00 0.00
177
178 MASONRY WALLS
179 • Block 0.00 0.00
180 • Sills 0.00 0.00
181 • Lintels 0.00 0.00
182 • Block Ties 0.00 0.00
183 • Sand 0.00 0.00
184 • Mortar 0.00 0.00
185 • Steel 0.00 0.00
186 • Concrete 0.00 0.00
187 • Masonry Labor 0.00 0.00
188 0.00 0.00
189 TOTAL MASONRY WALLS (LINES 179-187) 0.00 0.00 0.00
190
191
192
193 PAGE TOTAL (LINES 174, 189) 0.00 0.00 0.00
194
195
196
197
198
199
200
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 5" below


Cost Estimate Page 5
Description Qty Price UM Draw Me Total
201 ROOF
202 • Roofing Shingles 0.00 0.00
203 • Eave Drip 0.00 0.00
204 • Flashing 0.00 0.00
205 • Ridge Vents 0.00 0.00
206 • Roof Ventilators 0.00 0.00
207 • Nails 0.00 0.00
208 • Roofing Labor 0.00 0.00
209 0.00 0.00
210 TOTAL ROOFING (LINES 202-208) 0.00 0.00 0.00
211
212
213 WINDOWS 0.00 0.00
214
215 EXTERIOR DOORS
216 • Exterior Doors 0.00 0.00
217 • Garage Door 0.00 0.00
218 0.00 0.00
219 TOTAL EXTERIOR DOORS (LINES 216, 217) 0.00 0.00 0.00
220
221 CORNICE, VENEER, & EXTERIOR TRIM
222 • Siding 0.00 0.00
223 • Masonry Veneer 0.00 0.00
224 • Brick 0.00 0.00
225 • Stone 0.00 0.00
226 • Sand 0.00 0.00
227 • Mortar 0.00 0.00
228 • Ties 0.00 0.00
229 • Lintel 0.00 0.00
230 • Masonry Labor 0.00 0.00
231 • Stucco (Including Materials) 0.00 0.00
232 • Cornice Materials 0.00 0.00
233 • Sub Fascia 0.00 0.00
234 • Fascia 0.00 0.00
235 • Soffit 0.00 0.00
236 • Soffit Vents 0.00 0.00
237 • Frieze Board 0.00 0.00
238 • Shingle Mould 0.00 0.00
239 • Dental Mould 0.00 0.00
240 • Crown Moulding 0.00 0.00
241 • Corner Trim 0.00 0.00
242 • Window Trim/Mould 0.00 0.00
243 • Door Trim and Mould 0.00 0.00
244 • Flashing 0.00 0.00
245 0.00
246 CORNICE, VENEER, EXTERIOR TRIM CONTINUED ON NEXT PAGE
247
248 PAGE TOTAL* (LINES 210, 213, 219, 220) 0.00 0.00 0.00
249
250 "Page Total" on this page excludes lines222-245. Totals for these lines are included on line 26
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 6" below


Cost Estimate Page 6
Description Qty Price UM Draw Me Total
251 CORNICE, VENEER, EXT. TRIM CONTINUED
252 • Shutters 0.00 0.00
253 • Porch Columns 0.00 0.00
254 • Pediment and Pilasters 0.00 0.00
255 • Porch Materials 0.00 0.00
256 • Flooring 0.00 0.00
257 • Ceiling 0.00 0.00
258 • Columns/Posts 0.00 0.00
259 • Handrail 0.00 0.00
260 • Trim 0.00 0.00
261 • Nails 0.00 0.00
262 • Siding and Trim Labor 0.00 0.00
263 0.00 0.00
264TOTAL CORNICE, VENEER, EXTERIOR TRIM (222-262) 0.00 0.00 0.00
265
266 FIREPLACE
267 • Face Brick 0.00 0.00
268 • Fire Brick 0.00 0.00
269 • Flue Liner 0.00 0.00
270 • Mortar 0.00 0.00
271 • Sand 0.00 0.00
272 • Lintel 0.00 0.00
273 • Damper 0.00 0.00
274 • Ash Dump 0.00 0.00
275 • Gas Lighter (Including Gas Line) 0.00 0.00
276 • Masonry Labor 0.00 0.00
277 • Prefab Fireplace 0.00 0.00
278 • Chase Top 0.00 0.00
279 • Hearth and Profile (Materials and Labor) 0.00 0.00
280 0.00 0.00
281 TOTAL FIREPLACE (LINES 267-279) 0.00 0.00 0.00
282
283 ELECTRICAL
284 • Subcontract - Includes: Labor, Wire, Outlets, 0.00 0.00
285 Switches, Boxes, Connectors, Meter, 0.00 0.00
286 Service Entrance, Panel and Breakers, 0.00 0.00
287 • Lighting Fixture (Allowance) Includes: Door Bell, 0.00 0.00
288 and Smoke Detectors 0.00 0.00
289 • Ceiling Fan 0.00 0.00
290 • Whole House Fan 0.00 0.00
291 0.00 0.00
292 TOTAL ELECTRICAL (LINES 284-290) 0.00 0.00 0.00
293
294
295
296 PAGE TOTAL (LINES 264, 281, 292) 0.00 0.00 0.00
297
298
299
300
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 7" below


Cost Estimate Page 7
Description Qty Price UM Draw Me Total
301 APPLIANCES AND SPECIAL EQUIPMENT
302 • Range 0.00 0.00
303 • Range Hood 0.00 0.00
304 • Cook Top 0.00 0.00
305 • Oven 0.00 0.00
306 • Microwave 0.00 0.00
307 • Trash Compactor 0.00 0.00
308 • Disposal 0.00 0.00
309 • Refrigerator 0.00 0.00
310 • Dishwasher 0.00 0.00
311 • Electronic Air Filter 0.00 0.00
312 • Intercom System 0.00 0.00
313 • Built-In Vacuum System 0.00 0.00
314 • Security System 0.00 0.00
315 • Garage Door Opener 0.00 0.00
316 0.00 0.00
317 TOTAL APPLIANCES (LINES 302-315) 0.00 0.00 0.00
318
319 HVAC SYSTEM
320 • Subcontract - Includes: Labor; Heating/Air 0.00 0.00
321 Conditioning System; Humidifier and 0.00 0.00
322 Dehumidifier; Ducts, Dampers, and Vents 0.00 0.00
323 For Range Hood, Fireplace, Bath Fans, 0.00 0.00
324 and Dryer. 0.00 0.00
325 0.00 0.00
326 TOTAL HVAC (LINE 320) 0.00 0.00 0.00
327
328 PLUMBING
329 • Subcontract - Includes: Labor; Supply, 0.00 0.00
330 Waste, and Vent Pipes, and Fittings; 0.00 0.00
331 Bathtubs, Prefab Showers and Shower Pans, 0.00 0.00
332 Sinks, Vanity Bowls, and Toilets; Shower 0.00 0.00
333 Heads, Faucets, Sill Cocks; Water Heater; 0.00 0.00
334 Gas Lines 0.00 0.00
335 0.00 0.00
336 TOTAL PLUMBING (LINE 329) 0.00 0.00 0.00
337
338 WELL 0.00 0.00
339
340 SEPTIC TANK 0.00 0.00
341
342 SOLAR SYSTEM (LABOR AND MTLS) 0.00 0.00
343
344
345 PAGE TOTAL (LINES 317, 326, 336, 338, 340, 342) 0.00 0.00 0.00
346
347
348
349
350
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 8" below


Cost Estimate Page 8
Description Qty Price UM Draw Me Total
351 INSULATION - Materials and Subcontract 0.00 0.00
352
353 DRYWALL - Materials and Subcontract 0.00 0.00
354
355 INTERIOR DOORS AND TRIM
356 • Doors 0.00 0.00
357 • Base Moulding 0.00 0.00
358 • Base Cap 0.00 0.00
359 • Casing 0.00 0.00
360 • Crown Moulding 0.00 0.00
361 • Chair Rail 0.00 0.00
362 • Shoe Mould 0.00 0.00
363 • Shelving 0.00 0.00
364 • Closet Rods 0.00 0.00
365 • Rod Cups 0.00 0.00
366 • Shelf and Rod Brackets 0.00 0.00
367 • Shelf Cleating 0.00 0.00
368 • Stairs 0.00 0.00
369 • Stringers 0.00 0.00
370 • Treads 0.00 0.00
371 • Risers 0.00 0.00
372 • Handrail & Fittings 0.00 0.00
373 • Newells 0.00 0.00
374 • Balusters 0.00 0.00
375 • Skirt Board 0.00 0.00
376 • Pre-Fab Unit 0.00 0.00
377 • Panelling 0.00 0.00
378 • Plywood 0.00 0.00
379 • Picture Mould 0.00 0.00
380 • Panel Mould 0.00 0.00
381 • 1x Materials 0.00 0.00
382 • Window Trim 0.00 0.00
383 • Stool 0.00 0.00
384 • Mull 0.00 0.00
385 • Stop 0.00 0.00
386 • Apron 0.00 0.00
387 • Drop Ceiling Mtls. 0.00 0.00
388 • Disappearing Stairs 0.00 0.00
389 • Nails 0.00 0.00
390 • Glue 0.00 0.00
391 • Trim Labor Incl Shoe Mould and Undercut Doors 0.00 0.00
392 0.00 0.00
393 TOTAL INTERIOR DOORS AND TRIM (LINES 356 -391) 0.00 0.00 0.00
394
395
396 PAGE TOTALS (LINES 351, 353, 393) 0.00 0.00 0.00
397
398
399
400
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 9" below


Cost Estimate Page 9
Description Qty Price UM Draw Me Total
401 HARDWARE
402 • Entry Lockset 0.00 0.00
403 • Bedroom Locksets 0.00 0.00
404 • Bathroom Locksets 0.00 0.00
405 • Passage Doorsets 0.00 0.00
406 • Dummy Locksets 0.00 0.00
407 • Deadbolts 0.00 0.00
408 • Window Locks And Sash Lifts 0.00 0.00
409 • Door Stops (Base Board) 0.00 0.00
410 • Door Stops (Hinge Type) 0.00 0.00
411 • Bath Accessories 0.00 0.00
412 • Towel Holders 0.00 0.00
413 • Soap Dish 0.00 0.00
414 • Toothbrush Holder 0.00 0.00
415 • Tumbler Holder 0.00 0.00
416 • Medicine Cabinet 0.00 0.00
417 • Shower Curtain Rod 0.00 0.00
418 • Glass Fireplace Door 0.00 0.00
419 • Hardware Labor 0.00 0.00
420 0.00 0.00
421 TOTAL HARDWARE (LINES 402-419) 0.00 0.00 0.00
422
423 CABINETS AND VANITIES
424 • Wall Cabinets, Base Cabinets, and Vanities 0.00 0.00
425 Including Installation 0.00 0.00
426 • "Cultured" Marble Vanity Tops 0.00 0.00
427 0.00 0.00
428 TOTAL CABINETS AND VANITIES (PAGES 424-426) 0.00 0.00 0.00
429
430 PAINTING (Mtls and Labor) 0.00 0.00
431
432 WALLPAPER
433 • Wallpaper 0.00 0.00
434 • Labor Including Sizing And Paste 0.00 0.00
435 0.00 0.00
436 TOTAL WALLPAPER (LINES 433, 434) 0.00 0.00 0.00
437
438 WROUGHT IRON (Mtls and Labor) 0.00 0.00
439
440 GLASS
441 • Mirror 0.00 0.00
442 • Tub Enclosure 0.00 0.00
443 • Shower Enclosure 0.00 0.00
444 • Installation Of Glass Products 0.00 0.00
445 0.00 0.00
446 TOTAL GLASS (LINES 441-444) 0.00 0.00 0.00
447
448
449 PAGE TOTAL (LINES 421, 428, 430, 436, 438, 446) 0.00 0.00 0.00
450
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 10" below


Cost Estimate Page 10
Description Qty Price UM Draw Me Total
451 CERAMIC TILE - Materials and Labor
452
453 FLOORS AND FLOOR COVERINGS
454 • Carpet Including Pads and Installation 0.00 0.00
455 • Vinyl Tile Including Installation 0.00 0.00
456 • Wood Floors Including Installation 0.00 0.00
457 0.00 0.00
458 TOTAL FLOOR COVERING (LINES 454-456) 0.00 0.00 0.00
459
460 SCREEN PORCH
461 • Framing And Ceiling Materials 0.00 0.00
462 • Screening 0.00 0.00
463 • Screen Mould 0.00 0.00
464 • Screen Door 0.00 0.00
465 • Screen Door Hardware 0.00 0.00
466 • Labor 0.00 0.00
467 0.00 0.00
468 TOTAL SCREEN PORCH (LINES 461-466) 0.00 0.00 0.00
469
470 DECK
471 • Concrete (Footings) 0.00 0.00
472 • Framing Materials 0.00 0.00
473 • Decking 0.00 0.00
474 • Handrail Materials 0.00 0.00
475 • Nails 0.00 0.00
476 • Labor 0.00 0.00
477 0.00 0.00
478 TOTAL DECK (LINES 471-476) 0.00 0.00 0.00
479
480 WALKS, DRIVES, AND PATIOS
481 • Form Materials and Stakes 0.00 0.00
482 • Wire Mesh 0.00 0.00
483 • Joint Materials 0.00 0.00
484 • Concrete 0.00 0.00
485 • Labor 0.00 0.00
486 • River Rock Or Other Special Finishes - Materials 0.00 0.00
487 and Subcontract 0.00 0.00
488 0.00 0.00
489 TOTAL WALKS, DRIVES, PATIOS (LINES 481-487) 0.00 0.00 0.00
490
491
492
493
494 PAGE TOTAL (LINES 451, 458, 468, 478, 489) 0.00 0.00 0.00
495
496
497
498
499
500
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Page 11" below


Cost Estimate Page 11
Description Qty Price UM Draw Me Total
501 LANDSCAPING
502 • Subcontract - Includes: Finish Grading, 0.00 0.00
503 Seeding, Sodding, Shrubs, Ground 0.00 0.00
504 Covers, and Trees. 0.00 0.00
505 • Other Landscape Construction (Retaining Walls, 0.00 0.00
506 Steps, Etc.) Including Materials and Labor 0.00 0.00
507 0.00 0.00
508 TOTAL LANDSCAPING (502-506) 0.00 0.00 0.00
509
510 GUTTERS AND DOWNSPOUTS 0.00 0.00
511
512 CLEANING
513 • Site Clean Up - Haul Trash 0.00 0.00
514 • Clean Out House During Construction 0.00 0.00
515 • Final House Cleaning Incl. Windows 0.00 0.00
516 • Cleaning Brick and Concrete Surfaces 0.00 0.00
517 0.00 0.00
518 TOTAL CLEANING (LINES 513-516) 0.00 0.00 0.00
519
520 EQUIPMENT RENTAL 0.00 0.00
521
522 INSPECTIONS 0.00 0.00
523
524 SUPERINTENDING 0.00 0.00
525
526 CONTINGENCY 0.00 0.00
527
528
529 PAGE TOTALS (LINES 508, 510, 518, 520, 522, 524, 526) 0.00 0.00 0.00
530
531
532
533
534
535 GRAND TOTALS (FROM PAGE TOTALS) #REF! #REF! #REF!
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
UM
from=your
Unit Measure (ea, sq
construction ft, etc.)
loan © 1990-2012
draw, the total for each item, Section Home
Totals, Page Building
Totals, and Answers
Summary Page Totals.

Click "Summary " below


Cost Estimate Summary
Description Draw Me Total
1 LAND Line 9 0.00 0.00 0.00
2 DESIGN Line 16 0.00 0.00 0.00
3 CONSTRUCTION LOAN Line 26 0.00 0.00 0.00
4 PERMITS Line 37 0.00 0.00 0.00
5 UTILITIES Line 45 0.00 0.00 0.00
6 SITE PREPARATION Line 57 0.00 0.00 0.00
7 FOOTINGS Line 64 0.00 0.00 0.00
8 FOUNDATIONS Line 79 0.00 0.00 0.00
9 SLAB Line 114 0.00 0.00 0.00
10 SOIL TREATMENT Line 116 0.00 0.00
11 FRAMING Line 176 0.00 0.00 0.00
12 MASONRY WALLS Line 189 0.00 0.00 0.00
13 ROOFING Line 210 0.00 0.00 0.00
14 WINDOWS Line 213 0.00 0.00
15 EXTERIOR DOORS Line 219 0.00 0.00 0.00
16 CORNICE, VENEER, & EXTERIOR TRIM Line 264 0.00 0.00 0.00
17 FIREPLACE Line 281 0.00 0.00 0.00
18 ELECTRICAL Line 292 0.00 0.00 0.00
19 APPLIANCES AND SPECIAL EQUIPMEN Line 317 0.00 0.00 0.00
20 HVAC SYSTEM Line 326 0.00 0.00 0.00
21 PLUMBING Line 336 0.00 0.00 0.00
22 WELL Line 338 0.00 0.00
23 SEPTIC TANK Line 340 0.00 0.00
24 SOLAR SYSTEM Line 342 0.00 0.00
25 INSULATION Line 351 0.00 0.00
26 DRYWALL Line 353 0.00 0.00
27 INTERIOR DOORS AND TRIM Line 393 0.00 0.00 0.00
28 HARDWARE Line 421 0.00 0.00 0.00
29 CABINETS AND VANITIES Line 428 0.00 0.00 0.00
30 PAINTING Line 430 0.00 0.00
31 WALLPAPER Line 436 0.00 0.00 0.00
32 WROUGHT IRON Line 438 0.00 0.00
33 GLASS Line 446 0.00 0.00 0.00
34 CERAMIC TILE Line 451
35 FLOORS AND FLOOR COVERINGS Line 458 0.00 0.00 0.00
36 SCREEN PORCH Line 468 0.00 0.00 0.00
37 DECK Line 478 0.00 0.00 0.00
38 WALKS, DRIVES, AND PATIOS Line 489 0.00 0.00 0.00
39 LANDSCAPING Line 508 0.00 0.00 0.00
40 GUTTERS AND DOWNSPOUTS Line 510 0.00 0.00
41 CLEANING Line 518 0.00 0.00 0.00
42 EQUIPMENT RENTAL Line 520 0.00 0.00
43 INSPECTIONS Line 522 0.00 0.00
44 SUPERINTEND Line 524 0.00 0.00
45 CONTINGENCY Line 526 0.00 0.00
46
47 GRAND TOTAL 0.00 0.00 0.00
48
49
50
UM = Unit Measure © 1990-2012 Home Building Answers