INPUT:
Wire diameter (dw) = 40 mm Type:Euroflex, friction wire, full first layer
Wire diameter (dw) = 88 mm Type:Strongline
Drum diameter (D) = 711 mm
Drum diameter (D), including friction wire
= 791 mm 9.0 x dw
Drum length (L) = 720 mm 8.2 x dw
Extra space on drum (for stretchers) = 140 mm
Pull 1st layer = 35.0 Ton (1) 8.50 Ton (2)
Speed 1st layer = 9.20 m/min (1) 28.00 m/min (2) [rpm] [sec]
Hold.force 1st layer = 150.0 Ton speed 1: 3.33 18.0
speed 2: 10.14 5.9
OUTPUT:
Layer Layer Store- Length Shield Pull Speed Pull Speed Holding
diam. length on drm diameter (1) (1) (2) (2) force
wire Total Minimal
mm m m mm ton m/min ton m/min ton
Notes:
Maximum prefered number of layers is 5 for fibre rope & 8 for steel wire, see also drawing 500000-550-852
Minimum drum diameter for steel wire 13 x dw, for synthetic wire 5 x dw
Minimum shield diameter is based on : 140 mm extra space above the top layer
Prefered extra space for stretchers is 200mm
| |
Layer diameter calculated as follows: |OOOOOO |
| OOOOOO|
------------------