Вы находитесь на странице: 1из 7

Add BJC logo

Inspection and Testing Plan 
For Piping Assembly Works  

General comments:
add BJC procedures
LOWMAN PROJECT 
document No as well
in all the pages

Revisions History 
REVISIONS  DATE  DESCRIPTIONS  Prepared by  Approved by 

Prepared by (QC Engineer): Approved by (QC Manager):  Approved by (Customer): 


Date:  Date: Date:
Signature: Signature: Signature:
Add BJC logo ITP. No.: 
Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
1  SPECIFICATIONS 
Verify that all relevant documents have 
A ‐  ‐  Project Spec.
been received 
2  ENGINEERING 
SGA‐D726‐
A Engineering Documents  ‐  Technical Specification 
Latest Revision
B  AFC Drawings  Drawings/ part lists  
3  WELDING QUALITY CONTROL AND NDT 
SGA‐D726‐ 
A WPS/PQR  ASME Sec IX    R R 
Latest Revision
B  Welder Qualification register  WPQ  R R 

4  MATERIAL RECEIVING (PIPING) 
4.1 Material supply by Client  
A Review material list / Certificate (if any)  Fabrication 
Review Stamp R R R 

B  Check condition of packing  Dwg.,  R R

C  Check quantity of material 
SGA‐D726‐  General comments: R R
Latest Revision
Check surface condition of material 
Packing List  add BJC procedures
D  R R R 
(Inside and outside)  document No as well
 Note : All unaccepted indications on 
materials  shall be informed to client 
in all the pages
within 48 hours
5  MATERIAL RECEIVING (PIPE SUPPORTS) 
5.1 Document Review before ordering 
Review MPS for Materials requisition 
A R R R 
compliance Spec.  ASME Sec II 
Review MPS for Welding consumable  Part A,  
B  SGA‐D726‐  R R R 
requisition compliance Spec.  Relevant 
Latest Revision
5.2 Review Material Document  Design Code   R R R 

Check Certificate Chemical & Mechanical 
A Review Stamp R R R 
for Compliance 
* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 
* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 
Add BJC logo ITP. No.: 
Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
B  Check requirement as per specification    R
Material Receiving 
5.3 Material Receiving Inspection  ASME Sec II 
Accept Stamp 
Inspection Report 
R R

Check Packing, Material Physical,  Part A,  Visual, 


A SGA‐D726‐  Accept Stamp H R  R 
Quantity, Dimension  Relevant  Measuring Tape 
Latest Revision
B  Material and Mill cert. verification  Design Code   Review Stamp R R R 

C  Check mark and designation  H R  R 

5.4  Welding Consumable 
Check Packing, Material Physical, 
A ASME Sec II  H R  R 
Quantity 
Part C 
B  Welding consumable cert. verification  R R R 

5.5  Paint Material 
Check Packing, Material Physical,  Manufacturer  Visual 
A SGA‐D726‐  Accept stamp H R  R 
Quantity  data sheet  Inspection 
Latest Revision
B  Painting consumable cert. verification  R R  R 

5.6  Insulation Material 
Check Packing, Material Surface,  Manufacturer  Visual 
A Accept stamp H R  R 
Quantity  data sheet  Inspection 

B  Material spec, cert. verification  R R  R 

6  MATERIAL PREPARATION 
6.1 Pipe Spool Preservation 
Ensure Spool/Valves are correctly tagged 
A M M
with relevant details 
SGA‐D726‐ 
Ensure Spool/Valves are correctly 
Latest Revision Visual 
B  cleaned, stored & protected during  M M
Inspection 
temporary storage 
7  PIPING SPOOL ASSEMBLY 
7.1 Piping Spool 
A Fit up the Piping  Fabrication  SGA‐D726‐  Visual  H W R 
Inspection 
B  Visual and Dimensional Inspection  Dwg  Latest Revision H W R 
* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 
* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 
ITP. No.: 
Add BJC logo Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
C  Welding  Project spec.  H M R 

D Visual Inspection  H W R 

8  NON DESTRUCTIVE TEST (If require) 
Visual 
A NDE after completion of Final VT  Inspection 
H R R 
ISO 5817 
B  MT or PT as per specification   SGA‐D726‐  PT Chemical PT Report  H R R 
Level B or C 
Latest Revision
RT for pipe butt joint and socket weld as  SNT‐TC‐1A  Magnetic Yoke 
C  H R R 
per specification  RT Equipment 

9  REPAIR AFTER NDT 
9.1 Base metal repair   M

9.1.1 Edge preparation ; Notch  M

A After weld repair confirm by MT or PT   Visual  H R  R 
Inspection 
9.1.2 Remove Temporary attachment 
A After weld repair confirm by MT or PT   ASME B31.1  SGA‐D726‐  PT Chemical  H R  R 
Latest Revision
9.1.3 Mechanical damage  Magnetic Yoke 

A After weld repair confirm by MT or PT   RT Equipment  H R  R 

9.2 Internal defect Repair 
A Mark defective weld location  M

B  Monitor Excavation Process  M

MT after Excavation to confirm Removal 
C  H R  R 
of Defect  ASME B31.1  SGA‐D726‐ 
D Utilize appropriate weld repair   Latest Revision M

9.3 Post Repair Inspection 
A Repeat Visual Inspection   H R  R 

* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 


* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 
Add BJC logo ITP. No.: 
Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
9.4 NDE (s) after completion of weld repair  
A Repeat necessary NDE   H R  R 

B  nd 
Repairs not acceptable after 2 Repair  M

EXCEPTIONS & SITE INSTRUCTIONS (If 
10 
any) 
10.1  Site Instruction 
Corrections on deviations from drawings  
A   M M
or specifications 
Revise & approve engineering 
B  As Customer    M M
discrepancies found at site  
Proposal & approval for material  requirement 
C    M M
substitution 
D Modification as per Site Instruction    M M

11  INSPECTION RELEASE NOTE (IRN) 
11.1  Inspection Release Note 
Issue IRN on System components  SGA‐D726‐ 
A ‐  ‐  R R R 
reflecting all outstanding works (if any)  Latest Revision
12  INSPECTION BEFORE PRESSURE TEST 
Visual 
A General Visual Inspection   SGA‐D726‐  Inspection  
H W R 
ASME B31.1  Measuring 
B  Overall Dimension Survey on Piping   ‐  Latest Revision H W R 
Tools 
13  PNEUMATIC TEST  
A Line check prior to test  ASME B31.1 
W M R 
Visual 
SGA‐D726‐ 
B  Release for Pneumatic Test  Chapter VI  Inspection   M R
Latest Revision
C  Perform Pneumatic test  para. 137.5  W W W 

D  Internal Cleanliness of piping line  H W R 

RE‐INSTALLATION AND OPEN END 
14 
PROTECTION 
A Check piping connection  Drawing  SGA‐D726‐  Visual M

* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 


* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 
Add BJC logo ITP. No.: 
Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
B  Latest Revision Inspection, 
Check pipe supports  Measuring 
M

C  Check gasket type on flange connections  Tools, Torque  M
Wrench 
Check bolts on flange connection 
D  M
tightened 
E Check correct valves installed   M

15  INSTRUMENT INSTALLATION 
Checking tubing instrument air piping 
A M M R 
connection 
Checking tubing and instrument air 
B  M M R 
piping supports  SGA‐D726‐ 
Drawing  Marker 
Checking correct instrument installed &  Latest Revision
C  P &ID  M M R 
nameplate 
Pneumatic test of tubing and instrument 
D  M M R 
air piping 
16  ELECTRICAL INSTALLATION 
A Check terminal box  M M

B  Check conduit supply  M M

C  Check supports of cable tray and conduit  M M
SGA‐D726‐ 
Cable continuity and Insulation  Drawing  Marker 
D  Latest Revision M M R 
performance test 
E  Check cable label acc. to drawing  M M R 

F  Check grounding connections  M M R 

TRAIL  ASSEMBLY WITH MODULE A,B, 
17 
C,D&F 
A Assembly check  Drawing  H H W 

Overall dimension check of Modules and  Measuring Drawing Dimension


B  H H H**
piping open end  SGA‐D726‐  tools report
Check Anchor bolt connection&  Latest Revision
C  Report  W H   H** 
Clearance between sub‐modules 
3D scan of module and piping open end 
D Project spec  H H W 
after trial‐assembly 
* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 
* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 
Add BJC logo ITP. No.: 
Rev. No.: 
Rev. Date: 
Page No. : 

Job/Project No:   Project Name:  Location:  ☒ Shop ☐ Site 

Inspection  Verifying  Inspection Points 


Specifications and Procedures  Inspection 
No.  Production and Inspection Items  & Test  Control  BJC  CIMTAS NINGBO  MHPS 
Marking 
CODE  BJC/ CIMITAS  MHPS  Equipment  Records  IP  Date  Sign  IP  Date  Sign  IP  Date  Sign 
E  Modifications works if required  Drawing  H H W 

FINAL CLEANING AND TOUCH‐UP PAINT 
18 
AND PRESERVATION 
A Dry Film Thickness Control  Manufacturer  DFT Gauge Painting Report  M R  R 
SGA‐D726‐ 
Inside cleanliness and conservation  data sheets 
B  Latest Revision Borescope M R  R 
Control 
19  FINAL INSPECTION 
A Inspection Before Delivery H  W

B  Inspection release certificate   M H  H 

20  TAGGING & PACKING 
A Check Cleanliness  M M R 

B  Check the package sealing  SGA‐D726‐  M M R 

C  Check Tagging   Project Spec  Latest Revision M M R 

D Check with Packing list  M M

21  DOCUMENTATION 
A Compile Final Certification Dossier  R R R 

Check and Compile Quality  SGA‐D726‐ 
B  ‐  R R R 
Records/Document  Latest Revision
Compile completion package and dossier  
C  R R R 
for approval 
Manufacturer 
D Modification as per Site Instruction 
data sheet 
E  Delivery

* A:  Approve     H: Hold Point             M: Monitoring Activity                 R: Document Review            V: Verify       W: Witness Point       N/A: Not Applicable. 


* The reference documents or procedures if revision is not specified, use current lasted revision.
** Owner witness point 

Вам также может понравиться