100%(1)100% нашли этот документ полезным (1 голос)
4K просмотров15 страниц
5D-BRIDGE - Finnish bridge BIM 5D-SILTA is an umbrella project under which various separate R&D projects are carried out. Bridge owners, designers, contractors, software producers, etc. Are involved in the consortium. The project aims to enter from traditional 2D bridge design to use of 5D bridge information model through the whole life-cycle of the bridge.
5D-BRIDGE - Finnish bridge BIM 5D-SILTA is an umbrella project under which various separate R&D projects are carried out. Bridge owners, designers, contractors, software producers, etc. Are involved in the consortium. The project aims to enter from traditional 2D bridge design to use of 5D bridge information model through the whole life-cycle of the bridge.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
5D-BRIDGE - Finnish bridge BIM 5D-SILTA is an umbrella project under which various separate R&D projects are carried out. Bridge owners, designers, contractors, software producers, etc. Are involved in the consortium. The project aims to enter from traditional 2D bridge design to use of 5D bridge information model through the whole life-cycle of the bridge.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
Timo Tirkkonen Finnish Road Administration, Bridge Engineering
NVF-seminarium2009, Framtidens broar och brobyggare
31 augusti - 1 september 2009, Göteborg 31.8.2009 / Timo Tirkkonen 2
5D-BRIDGE - Finnish bridge BIM
• 5D-BRIDGE (5D-SILTA in Finnish) is an umbrella project
under which various separate R&D projects are carried out • Cooperation between different actors in the consortium: bridge owners, designers, contractors, software producers, etc. • Finnish Road Administration • Finnish Rail Administration • Helsinki City • Oulu University • A-Insinöörit Oy • Destia Oyj • Geotrim Oy • Ponvia Oy • Ramboll Finland • SiltaNylund Oy • SITO Oy • Skanska Infra Oy • Tekla Oyj • Terrasolid Oy • WSP Finland Oy 31.8.2009 / Timo Tirkkonen 3
5D-BRIDGE - Finnish bridge BIM
Idea: Entering from traditional 2D bridge design to use of 5D bridge information model through the whole life-cycle of the bridge
*A.Karjalainen, WSP Finland Oy
31.8.2009 / Timo Tirkkonen 4
5D-BRIDGE - Finnish bridge BIM
Steps until now 5D-BRIDGE2 2008-2010
• More pilot projects • On-site measurements • Modelling of custom components • Guidelines for bridge modelling • National and International cooperation 5D-BRIDGE 2005-2007 • Pilot projects • Also bridge renovation projects • Tekla Structures, Solid Works • Modelling of reinforcement • Use of model in on-site measuring • Evaluation Smart Bridge 2001-2004 • 3D process development • 3D modelling of concrete bridges • Design models • Laser scanning: control measurements 31.8.2009 / Timo Tirkkonen 5
Smart bridge (Älykäs silta) 2001 - 2004
3D Bridge design modelling 31.8.2009 / Timo Tirkkonen 6
Smart bridge (Älykäs silta) 2001 - 2004
Laser scanning As built models by laser scanning • substructures • formwork of superstructure • concrete deck slab • final structure
Original point cloud
As built modelled concrete surfaces 31.8.2009 / Timo Tirkkonen 7
Smart bridge (Älykäs silta) 2001 - 2004
Quality control • comparing design and as built models vs. quality requirements 31.8.2009 / Timo Tirkkonen 8
5D-Bridge (5D-Silta) 2005 - 2007
Bridge renovation project (Kajaanin varikkosilta) • Existing bridge and depot building to be removed • New bridge to be built connected to existing bridge • Source information of present structures by laser scanning • BIM design of concrete bridge • As built bridge geometry vs. quality requirements
*A.Karjalainen, WSP Finland Oy
31.8.2009 / Timo Tirkkonen 9
5D-Bridge (5D-Silta) 2005 - 2007
Comparing 2D design to product modelling (Master's thesis of A.Kouvalainen)
Traditional + familiar and safe - information scattered in many
2D-design + easy to learn documents + programs are existing - document management hard + easy working with simple line - drawings consist lines and text geometry => no intelligence - same information in many places - contradictions between documents Product + supports life-cycle thinking - new and strange (information) + all information saved in one place - needs change in attitudes modelling + cumulative increase of information - needs investing in new programs + details (or objects) consisting and training product information - in some cases modelling of details + intelligence of objects makes difficult and time consuming creation of joints easier + fast quantity surveying + making changes fast in certain cases 31.8.2009 / Timo Tirkkonen 10
5D-Bridge2 (5D-Silta2) 2008 - 2010
Case: Eteläkylän Isosilta, Pyhäjoki, Finland • Museum bridge, constructed 1837 • Timber truss structure What we have done? • Weak condition – needs quick repairing • Laser scanning • How the BIM technology can help in • Processing of point cloud renovation? • 3D Modelling of structures based on point cloud Laser scanned point cloud with RGB color from • CAD import of point cloud or images taken by scanner modelled geometry • Preliminary 3D Modelling of the bridge for renovation • Creating drawings of the existing bridge based on BIM • Preliminary structural analysis based on dimensions of the model (truss profiles, spans etc.) • Pilot for classify and visualise WSP Finland Oy of damages 31.8.2009 / Timo Tirkkonen 11
5D-Bridge2 (5D-Silta2) 2008 - 2010
3D modelling of structures based on point cloud
Preliminary 3D modelling of the bridge for renovation
WSP Finland Oy
Creating drawings of the
bridge based on BIM 31.8.2009 / Timo Tirkkonen 12
5D-Bridge2 (5D-Silta2) 2008 - 2010
Custom components -project • modelling of custom components used in bridges • based mainly on Finnra standard drawings made for parapets, bearings, expansion joints, drying equipment etc. • joints of steel structures (Ruukki-types) • using premodelled components makes modelling faster • components will be imported from Finnra standard component library 31.8.2009 / Timo Tirkkonen 13
5D-Bridge2 (5D-Silta2) 2008 - 2010
Guidelines for bridge modelling WSP Finland Oy • General guidelines • requirements for source information • requirements for models in different design stages • requirements of use of standards • Guidelines for different software users • in cooperations with producers and users
Lukkari bridge, Pori,
Ramboll Finland 31.8.2009 / Timo Tirkkonen 14
Further development
• Integrating bridge modelling to whole road design process
• Relation to bridge management system and bridge register (= needed model storage?) • Better standardisation to make data transfer easier • Using bridge BIM during maintenance? • condition inspection reporting • Further piloting in larger projects 31.8.2009 / Timo Tirkkonen 15