Project :

Subject : Designed By :
SIZING OF SEWAGE TREATMENT PLANT
Date :

I. SIZING OF SEWAGE TREATMENT PLANT

A. DESIGN DATA:

OCCUPANCY DOMESTIC AVERAGE FLOW = 0


0

WASTEWATER GENERATED = 0
0

B. DESIGN CRITERIA

BOD = 250
LOAD = 0.56
AERATION REQUIREMENTS = 93
PEAK DETENTION FLOW RATE = 6
SLUDGE GROWTH RATE = 60
SLUDGE DESTRUCTION = 50
SLUDGE CONCENTRATION = 2
DETENTION TIME (HOLDING) = 9
CHLORINE DOSAGE = 7

BOD TOTAL:
= wastewater generated x BOD

( 0 cu.m. / day) 250 mg/L) 1000 L / cu.m. )

= 0 kg/day

C. SIZING OF STP TANKS AND REQUIREMENTS:

1.) RAW SEWAGE

Inlet = standard
length = 2 m.
width = 1 m.
depth = 4.2 m.

2.) HOLDING / COLLECTING TANK


peak load = 0 cu.m. / day
duration = 6 hours
volume = 0 cu.m. / day) (1 day/ 24 hours) (6 hours)
= 0 cu.m.
length = 0 m.
width = 0 m.
depth = 4.2 m.

A. SEWAGE PUMP DIFFUSER


Detention = 6 hours
Capacity = 0 cu.m / 6 hours
= 0 cu.m. / hr) ( 264.2 gals/cu.m)
= 0 gpm 0 gpm )
TDH = 30 ft
BHP = 0 gpm vs. 30 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of diffuser pump:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP

3.) COMMINUTOR (FINE SCREEN AREA)

length = m
width = m
depth = 4.2 m

A. COMMINUTOR GRINDER
Capacity = 0 cu.m. / day(1 day / 6 hours)
= 0 cu.m./hr
Flow, Q = 0 cu.m./hr 264.2 gals/cu.m. ) ( 1 hr./ 60 min)
= 0 gpm 0 gpm)
TDH = 25 ft
BHP = 0 gpm vs. 25 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of comminutor grinder:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP
4.) RAW SEWAGE DISTRIBUTION BOX

peak load = 0 cu.m. / day


duration = 2 hours
volume = 0 cu.m. / day) (1 day/ 24 hours) (6 hours)
= 0 cu.m.
length = 0 m.
width = 0 m.
depth = 4.2 m.

A. RAW SEWAGE EJECTOR PUMP


Detention = 2 hours
Capacity = 0 cu.m / 2 hours
= 0 cu.m. / hr) ( 264.2 gals/cu.m)
= 0 gpm 0 gpm )
TDH = 30 ft
BHP = 0 gpm vs. 30 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of raw sewage ejector pump:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP

5.) AERATION TANK

BOD = 0 kg/day
load = 0.56 kg/cu.m./day
volume = 0 kg/day (0.56 kg/cu.m./day)
= 0 / 2 tanks
length = m
width = m
depth = 4.2 m

A. BLOWER REQUIREMENT
Aeration = 93 cu.m. Of air / kg BOD
= 0 kg/day ( 93 cu.m. Of air/kg BOD )(1 day/24 hours)/
= 0 cu.m./min
Air lifts = 0 cu.m. /min 2
0 cu.m,/min
Capacity = 0 0 cu.m./min (264.2 gals/cu.m.)/ 3 units
= 0 gpm 0 gpm )
TDH = 50 ft.
BHP = 0 gpm vs 50 ft., TDH /
= 0 HP 5 HP )

B. RECOMMENDATION:

Adopt four (4) units of blower equipment:


Capacity / Unit : 0 gpm vs.
Approx : 5 HP

6.) SETTLING / CLARIFIER TANK

volume = 0 cu.m./day (1 day/24 hours) x (6 hours)


= 0 cu.m.
length = m
width = m
depth = 4.2 m

A. CLARIFIER EJECTOR PUMPS


Detention = 2 hours
Capacity = 0 cu.m / 2 hours
= 0 cu.m. / hr) ( 264.2 gals/cu.m)
= 0 gpm 0 gpm )
TDH = 30 ft
BHP = 0 gpm vs. 30 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of clarifier ejector pumps:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP

7.) SLUDGE DIGESTER TANK

volume = 0 cu.m./day (1 day/24 hours) x (6 hours)


= 0 cu.m.
length = m
width = m
depth = 4.2 m

A. SLUDGE SEWAGE EJECTOR PUMPS


Detention = 2 hours
Capacity = 0 cu.m / 2 hours
= 0 cu.m. / hr) ( 264.2 gals/cu.m)
= 0 gpm 0 gpm )
TDH = 30 ft
BHP = 0 gpm vs. 30 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of sludge sewage ejector pumps:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP

8.) CHLORINATOR / CLEAR WATER PIT

peak load = 0 cu.m. / day


Detention = 2 hours
Capacity = 0 cu.m. / day) (1 day/ 24 hours) (1.5 hours)
Flow, Q = 0 cu.m. 2
= 0 cu.m.
length = 0 m.
width = 0 m.
depth = 4.2 m.

A. CHLORINE EJECTOR PUMPS


Chlorine F = 7 mg/L
Weig = 0 cu.m./day (7 mg/L)(1,000 L/cu.m.)(1 kg/1,000,000
= 0 kg/day

If hypochlorite is use with 70% available chlorine:


weight of hypochl 0 kg/day 0.7
= 0 kg/day

Chlorinator Capacity at 5% Solution:


volu = 0 kg/day 1 L/ kg) /(0.05)
= 0 L/day

Adopt 0 to 100 L/day capacity of chlorinator clear water ejector pumps


Detention = 1.5 hours
Capacity = 0 cu.m. / day)/(1.5 hours)
Flow, Q = 0 cu.m./hr ( 264.2 gals/cu.m.)( 1 hr/60 min)
= 0 gpm 0 gpm )
TDH = 40 ft
BHP = 0 gpm vs. 40 ft., TDH /
= 0 HP 2.5 HP )

B. RECOMMENDATION:

Adopt two (2) units of clear water ejector pumps:


Capacity / Unit : 0 gpm vs.
Approx : 2.5 HP

II. LEGEND OF SEWAGE TREATMENT PLANT

1.) RAW SEWAGE PIT

length = m - 1
width = m - 1
depth = 4.2 m - 1

2.) HOLDING / COLLECTING TANK

length = m - 1
width = m - 1
depth = 4.2 m - 1

3.) COMMINUTOR / SCREEN

length = m - 1
width = m - 1
depth = 4.2 m - 1

4.) RAW/SEWAGE DISTRIBUTION TANK

length = m - 1
width = m - 1
depth = 4.2 m - 1

5.) AERATION TANK

length = m - 2
width = m - 2
depth = 4.2 m - 2

6.) FINAL SETTLING TANK

length = m - 1
width = m - 1
depth = 4.2 m - 1

7.) SLUDGE DIGESTER TANK


length = m - 1
width = m - 1
depth = 4.2 m - 1

8.) CHLORINATOR AREA/CLEAR WATER PIT

length = m - 1
width = m - 1
depth = 4.2 m - 1
Checked By :
Date :

gpm
cu.m.

gpd
cu.m.

mg/L
kg of BOD/cu.m./day
cu.m. Of air/ kg of BOD
hours
%
%
%
days
mg/L

1 kg / 10,000,000 mg)
24 hours) (6 hours)

1 hr / 60 min )

3960 x 0.5 )

30 ft., TDH

gals/cu.m. ) ( 1 hr./ 60 min)

3960 x 0.5 )

25 ft., TDH
24 hours) (6 hours)

1 hr / 60 min )

3960 x 0.5 )

30 ft., TDH

air/kg BOD )(1 day/24 hours)/60 min

(264.2 gals/cu.m.)/ 3 units

3960 x 0.5 )
50 ft., TDH

hours) x (6 hours)

1 hr / 60 min )

3960 x 0.5 )

30 ft., TDH

hours) x (6 hours)

1 hr / 60 min )
3960 x 0.5 )

30 ft., TDH

24 hours) (1.5 hours)

1,000 L/cu.m.)(1 kg/1,000,000 mg)

ter ejector pumps

/cu.m.)( 1 hr/60 min)

3960 x 0.5 )
40 ft., TDH