Dear Member,
Find attached the General Instructions, Do’s and Don'ts related to the fit out work for your offices in Bharat
Diamond Bourse (B.D.B.) which you may forward to Architects / Designers to follow.
The necessary attachments giving all Instructions, Suppliers and Vendors list, data and details, provisions of
prior work and after completion work as is expected from the Architects, has been sent across to all the
Architects. If there is any discrepancy in understanding any attachment, scopes, rates, etc. you may please
revert to B.D.B. The rates are most competitive from the Suppliers and Vendors, however you are free to
appoint your own Consultants, Suppliers and Vendors provided you / they follow the parameters / norms as
asked by Bharat Diamond Bourse.
Architects to submit initially 1 set for scrutiny and comments. Amendments as per
comments will be a submission of 4 sets of all Drawings, Survey drawing 1 no., documents,
CD's of all drawings and security deposits (complete file with all contents at one time) to
Help Desk - BDB with covering letter, on company's / Members letterhead for proper
documentation.
Each & Every drawing & Hard Copies must have proper Proforma as per drawing template
provided. Enough space must be kept for Stamping seal, sign and necessary Approval from
MCGM / MMDRA.
a) Set 1/4/, 2/4, 3/4, 4/4 & Drawing 1/9, 2/9, 3/9, 4/9 – for one set of total 9 drawings.
b) BDB Office No: XX 0000 – (every individual office No.)to enable identify Building, wing
/core, Floor / Level and Gala No.
1
c) Individual Area = 150 Sq Ft / 300 Sq Ft / 600 Sq Ft etc. (As per MMRDA Record)
d) Carpet Area = (Built up Area x 0.7)
In Proforma / Format, Clearly mention the Title of Drawings for the following: -
c. AC Ducting Layout
Layout of F.C.U (Numbers x Capacity of each FCU) with Ducting layout.
Show Table of comparison – Allotted AC load & allotted F.C.U; proposed AC load & proposed
F.C.U along with statement, showing proposed AC load & proposed F.C.U= allotted AC load &
allotted F.CU. Chilled Water Line (Supply & Return with accessories) , Drain outlet drawing,
location of Trap doors & their sizes, as well as Location of each Thermostat.
(No of allotted FCU by BDB = No of Thermostat allotted by BDB).
The MEP Services Consultancy can be had from any outside Consultants or BDB panel of
Consultants at a fee as standardized by BDB. Architects will have to then share the PCP soft
copy prior to proposal to avail the MEP Services Consultancy.
d. Electrical
i. Lighting and Equipment Layout
ii. Single Line Diagram
iii. Total Power Load Calculation
e. Position of Safe
Size, Location and Weight (applicable for 600 Sq.ft. & above only).
f. Section
i.
Brief description of partition wall material must be mentioned in furniture
layout / partition wall layout must be repeated.
Height above False Ceiling up to True Ceiling must be clearly mentioned.
ii. Section Line with direction of view must be shown in plan.
g. Plumbing
i. Layout of complete plumbing work.
ii. Large Scale individual details.
Obtain approval for all services before commencement of fit-out work execution.
Fitout work to be executed only after receiving Provisional NOC (Letter of permission to
Start Fit- out work execution at site). Soon after obtaining NOC a photocopy of the same
must be pasted on the office entrance door, for ready reference / identification of
BDB admin /vigilance dept.
During fit-out execution at site, copies of all approved services layout plan must be kept for ready
Reference, which will be required by the BDB Engineers during their inspection /visit at site.
In case BDB engineers notices that fitout execution work started without prior approval / N.O.C
during their site visit, that the work will be stopped immediately without serving any notice,
The matter will be referred to the BDB committee for further necessary action.
Corrected drawings must be submitted, within a week of receiving letter of comments from BDB
for Respective services.
Provisional NOC will be issued only after fulfillment of all compliances including submission of
Corrected Drawings. Comments delivered by BDB on first proposal submission, those documents
must be enclosed. Balance informations & drawings/documents which were not submitted to BDB
are also to be submitted for approval.
Architect, services consultant & Contractors of HVAC, Electrical, Fire Fighting, Plumbing and
other services must meet B.D.B Fit-out consultant-Architectural as well as M.E.P in co-ordination
of Help Desk, before Commencing Planning & execution of fit out work at site.
Location of safe either individual or in cluster, weighing more than 2 tons to be approved from
BDB’s appointed structural consultants. Respective member have to pay his consulting fees.
for the same.
Heavy weight Safe is not permitted within 2 mtrs from window wall. In case column
is available near window, safe is permitted to place close to this column.
3
Office owners are permitted to design & execute outer surface of the entrance door shutter &
door frame only, as per their choice without changing the size and location of the door.
Photo Frame to this entrance door of width up to 300 mm (12 ”) and thickness up to 50 mm (2”)
is permitted.
Any type of Safety Door (Collapsible Grill, Sliding Door) opening in corridor is not permitted.
Do not show door opening outside in drawing and do not execute on site.
Breaking / removing of Mullions in external pardi (in line with window) is not permitted.
In case member wishes to combine the group offices by removing internal partition wall,
Plan showing proposed internal partition wall for demolition must be submitted.
Internal partition wall beyond 300 mm from window wall could be removed.
Partition wall up to 300 mm from window wall must be retained.
Sun control films on window glasses are not permitted; Venetian/ Vertical/ Roller blinds are to be
Installation of small sized dome camera, as per specification / make approved by BDB is permitted.
Traditional style bracket mounted security camera on common passage wall is not permitted.
All wet area must remain within 2.5 m from the duct wall.
TERMINATION OF THE ARCHITECTS SERVICES : The Client will have to intimate BDB via
a written letter formally of having terminated the Architects Services for the interior works.
The following activities are not permitted in the BDB premises are as follows: -
During Fit out wok at site staff / laborers working / stay at after 23.00 Hrs.
Working in common area like corridors / lobbies / terraces nearby office premises.
4
Parking of vehicles after unloading & stacking of material.
Taking out tools or material from BDB site without prior authorization/permission by either
Member or architect & final approval by the BDB authority.
Leaving of loose electric wires on floors, bare conductors, faulty cable joints.
Parking of load carrying vehicles in the premises, after unloading fit out materials in the premises.
Dragging of heavy material/equipments damaging flooring tiles, cladding wall tiles, false ceiling,
any type of fittings & fixtures, manual call points, paint etc.
Use of lifts in working days including holidays without lift manager’s permission, for material
movement in towers.
Disturbing the services which are already laid, either below or above the false ceilings.