KINGDOMOFSAUDIARABIA Page 1 of 1

Saline Water Conversion Corporation Form: F1711-17, Rev. 1. Dated: 02/07/2019


STRATEGIC RESERVOIRS PROJECT IN MAKKAH PHASE II AND TAIF PHASE I
Owner: Engineer: Contractor: Sub-Contractor:

QR No.: NDE-1711-T393-F0005
Non-Destructive Examination (NDE) SUMMARY QR Date: 22/12/19
Mfr. Eq. No.: TK-393 (TK-05) Item: ANNULAR TO BOTTOM PLATE JOINT JO No.: 17-11
Parent Metal 1 Parent Metal 2 VT RT RT1 Other Test (VB, PO, Pn, PT, MT) Remarks
Weld Welder/s
Joint No. WPS No. RT RT
Type ID/Symbol Specs Thk. Specs Thk. RFI # Q Report RFI # RFI # Method RFI # Q Report
Report Report

19202, 1944,
18241, 17455,
18225, 18156,
18264, 18323,
A537
18228, 18480, F0419-76-CON-M- F0042 F0480-76-CON-M- F0022
205-01 SMAW CL2 16mm A36 6mm MET-06-95 Rev3
1090 –1104
NA NA NA NA VBT 1070-1187
ACC
19219, 1986,
18263, 19204,
18236, 18323,
18484, 1993,
18260, 18248

Inspection Authority Sign-off:


Prepared By: METSCCO Reviewed By: AICC Reviewed By: KHATIB & ALAMI Reviewed By: SWCC
MURUGANANDAM. G

QC Engineer
Distribution List: Original – QA/QC Dept., e-copies to Construction, Client’s Witnessing Inspector/s.