. CUSTOMER PO DATE U2 SALE ORDER NO. & DATE WEB ERP ORDER NO. & DATE Work order No. & date
1 JINDAL STEEL & POWER LIMITED, UNIT II 4514005111 24/04/2015 S1100003 5/5/2015 GI6912 dated 30/05/2015 000009 dated 04/06/2015
2 DIGI DRIVES PVT LTD MAY-M-1 0-2015-2016 5/5/2015 S1100004 8/5/2015 GI6279 dated 29/05/2015 000010 dated 04/06/2015
3 JINDAL STEEL & POWER LIMITED 4571012942 14/05/2015 S1100005 14/05/2015 GI6914 dated 30/05/2015 000011 dated 04/06/2015
4 JINDAL STEEL & POWER LIMITED, UNIT II 4514005186 21/05/2015 S1100006 28/05/2015 GI6913 dated 30/05/2015 000012 dated 04/06/2015
5 JINDAL STEEL & POWER LIMITED, UNIT II 4514005165 15/05/2015 S1100007 28/05/2015 GI6251 dated 29/05/2015 000013 dated 04/06/2015
6 STEEL AUTHORITY OF INDIA LTD (SALEM) PU-L66 1003/01 30/05/2015 S1100008 30/05/2015 GI6915 dated 29/05/2015 000014 dated 04/06/2015
SSIPL - DESIGN DEPT. INDUSTRIAL PRODUCTS
October 2015
T 1
F 2 Gandhi Jayanthi
S 3
S 4 (working on account of bharath bhand- sept 2nd 2015)
M 5
T 6
W 7
T 8
F 9
S 10 Second Saturday
S 11 Sunday
M 12
T 13
W 14
T 15
F 16
S 17 Manual upgradation (Digidrive-II)
S 18 Sunday
M 19 Manual (Digidrive-II) fine tuning, 1+3 sets arranged & given for printing, packing list initiated
T 20 Work track sheet- preparation, Packing list format prepared for Digi Drive-II and sent to Satish
Involved in inspection of DN28 turbulance cooling pipe with Mr.Manjunath. Updating & writing the drawings for
W 21 CD (RSP HSM)
T 29 Completed the manual till date , drawings left out for filing
F 30 oil coating drawing updated wit coupling details. Initiated vault activity (splitting up the drawing)
S 31 vault activity continued…