Contents Section
Company Profile 1
Shop Drawings 3
Sequence of Operation 4
Appreciation Letters 5
Contact Details 6
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
Company Profile
Company Profile
Company Registration
Chamber of Commerce
Industrial License
ISO Certification
HCIS Certification
Saudi Aramco Pant Approval & Product 9COM
Other Certifications
KMI Functional Chart
SPD Functional Chart
Our Facilities
Our Man Power
Our Equipment
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
COMPANY
PROFILE
1
Al Kuhaimi Metal Industries Ltd.
تاريخ الصدار ١٤٤٠/٠٥/٢٥ :هـ الرقم٠٥٠٤٤٠٤٨ :
السم التجاري :شركة الكحيمي للصناعات المعدنية المحدودة
جنسية الشركة :سعودية موقعها الرئيسي: النشاط المرخص :مقاولت أمنية
مصدره: تاريخه ١٣٩٧/٠٣/١٧ :هـ رقم السجل التجاري ٢٠٥٠٠٠٤٦٨٦ :
صلحية هذه الوثيقة حتى تاريخ ١٤٤١/٠٦/٠٦ :هـ
تشهد وحدة التراخيص المنية المركزية أن الشركة الموضحة بياناتها أعله قد استكملت إجراءات تأهيل المقاولين و الستشاريين لمشاريع المن الصناعي في
النشاط المرخص أعله بما يؤهلها للدخول في المنافسات الخاصة بالمنشآت الخاضعة لشراف الهيئة العليا للمن الصناعي٠
ولطلع المنشآت الخاضعة لشراف الهيئة العليا للمن الصناعي على كافة خبرات الشركة والتأكد من القدرة على تنفيذ المشاريع التي تقدمت لها ،يرجى زيارة
www.clu-moi.com البوابة اللكترونية للتراخيص المنية على الرابط
٠و قد أعطيت هذه الوثيقة بناء على طلبها ،دون أدنى مسؤولية تجاه وحدة التراخيص المنية المركزية بالمانة العامة للهيئة العليا للمن الصناعي
SAUDI ARAMCO PLANT APPROVAL & PRODUCT 9COM
of Al Kuhaimi Metal Industries Ltd.
5
Al Kuhaimi Metal Industries Ltd.
SAUDI ARAMCO PLANT APPROVAL & PRODUCT 9COM
of Al Kuhaimi Metal Industries Ltd.
6
Al Kuhaimi Metal Industries Ltd.
CERTIFICATIONS
and standards
16
Al Kuhaimi Metal Industries Ltd.
CERTIFICATIONS
and standards
17
Al Kuhaimi Metal Industries Ltd.
KMI FUNCTIONAL
Organisation Chart
HR CONSULTANT
Mr. Bilal Jadallah
INFORMATION TECHNOLOGY
HW DIVISION ESTIMATION
Mr. Mohd. Nabelsi ENGINEERING
PROJECTS MANAGEMENT
EXECUTIVE PROCUREMENT
SALES & MARKETING
COMMITTEE EXPORT
Mr. Mohammad Al Kuhaimi,
CHAIRMAN & CEO GENERAL
Mr. Mahmoud Al Kuhaimi, MANAGER HMD DIVISION
Dr. Akram Al Abed Mr. Marwan Ahmaro ESTIMATION
VICE PRESIDENT PRODUCTION
ENGINEERING
Dr. Akram Al Abed, PROCUREMENT
GENERAL MANAGER SALES & MARKETING
QUALITY CONTROL
EXPORT
RUD DIVISION
Mr. Malek Audi
ESTIMATION
PRODUCTION
ENGINEERING
PROCUREMENT
SALES & MARKETING
QUALITY CONTROL
SP DIVISION EXPORT
Mr. Yousef Al Shanti
ESTIMATION
PRODUCTION
ENGINEERING
PROCUREMENT
SALES & MARKETING
HR & ADMIN. QUALITY CONTROL
EXPORT
HR
PERSONNEL
FINANCE & ADMINISTRATION
ACCOUNTS INSURANCE
Mr. Iyad Al Rifai HEALTH & SAFETY
ENVIRONMENTAL
LEGEND
HW: Hardware | HMD: Hollow Metal Door | RUD: Roll Up Door | SP: Structural Product | I .T: Information Technology
2
Al Kuhaimi Metal Industries Ltd.
SPD FUNCTIONAL
Organisation Chart
Inspector
Engineer Inspector
QC Document
Controller
/+ Painters
Lead Fabricators
/0 /+
Foreman & Welders
Asst. Store
!
Detailers (4 Nos.)
Supervisor
R&D R&D
Supervisor
Export Project
Sales & Marketing Deparment
"
Manager
Accounts
Legend
1. KMI : Al Kuhaimi Metal Industries
"#$"!!
!#%
'$*!
+!!
,-$!!-+! !
5. R & D : Research & Development
6. QC : Quality Control
3
Al Kuhaimi Metal Industries Ltd.
OUR MANPOWER
Al Kuhaimi Metal Industries Ltd.
1 MANAGERS 26
2 ACCOUNTS 25
3 STOREKEEPERS / CLERKS 22
5 ENGINEERING 40
6 HARDWARE 30
7 EDP / IT 12
11 PRODUCTION ENGINEERS 18
12 PURCHASING 8
13 QA / QC 10
14 SALES STAFF 35
15 SUPPORT STAFF 35
16 SUPERVISORS 20
TOTAL 743
13
Al Kuhaimi Metal Industries Ltd.
OUR FACILITIES
Al Kuhaimi Metal Industries Ltd.
9 2,800
TOTAL 60,000
12
Al Kuhaimi Metal Industries Ltd.
OUR EQUIPMENT
Al Kuhaimi Metal Industries Ltd.
14
Al Kuhaimi Metal Industries Ltd.
General Technical Literature
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
MANUFACTURER
TECHNICAL BROCHURE
TEST CERTIFICATION
KEM-FP1 ANTI-VEHICLE FENCE
M50-P1
Al Kuhaimi Engineering Metal Industries (KEMI) is part of Al KEMI produces standard and customized products related to
Kuhaimi Metal Industries ltd. (KMI). KEMI is located in the 2nd safety and security applications serving Industrial, Commercial
Industrial City Dammam, Saudi Arabia. and Institutional clients and prestigious projects.
With almost 40 years of experience in the fabrication of custom Major served sectors are related to Petrochemical, Oil & Gas,
products; KEMI is the regional industry leader in terms of Military, Penitentiary, Water and Power. KEMI plant is
performance, capability and reputation. Thanks to our equipped with several state of art machines for steel
investment in human resources, state-of-the-art technology fabrication such as CNC Laser and Plasma Cutting, CNC
and equipment. Bending, Shot Blasting and Painting Line.
KEM-FP1
19
Al Kuhaimi Metal Industries Ltd.
KEM-FP1 ANTI-VEHICLE FENCE
M50-P1
KEM-FP1
ABOUT THE PRODUCT
The design offers minimal destruction and quick repairs to The fence is constructed mainly from steel tubes and steel
the fence in case of crash attack. components. Its main design features is the (10M) free span
with no intermediate posts. In addition to this largest free
span in the market, the relatively smaller footing foundation
RATING AND TEST STANDARD
means lower costs of civil works and faster installation.
The fence is available in standard finish of hot-dip
Fence is M50-P1 rated as per ASTM F2656 and fully complies galvanized (HDG) as per ASTM A123 and other finishes on
with (HCIS) Higher Commission for Industrial Security demand.
directives.
20
Al Kuhaimi Metal Industries Ltd.
INSTALLATION
METHODOLOGY
PROOF OF
COMPLIANCE (PoC)
Proof of Compliance (PoC)
ANTI-VEHICLE FENCE M50-P1
1.0 HCIS SEC-06 All AVB shall be constructed of materials and components that will be permit extended, Refer to 2.0
Art. 5.3.3.4
-01.
2.0 HCIS SEC-01 Security equipment that is installed outdoors shall be rated to operate in direct sunlight
Art. 11.2
2.3 11.2.1.3.
Not Applicable.
0.3 mg/m
& 50 ppm
H 2 10 ppm
NOx 5 ppm
O3 1ppm
So2 10 ppm
3.0 HCIS SEC-02 The AVB shall be installed adjacent to the inside of
- Personnel Fence. Comply.
Art. 5.3.3.1
'
*
7
-06.
28
Al Kuhaimi Metal Industries Ltd.
Proof of Compliance (PoC)
ANTI-VEHICLE FENCE M50-P1
'
:&
7
#
<
7
must state that the AVB was successfully impact tested to the
<
:&#
>
#
?7<
6.0 HCIS SEC-06 All AVB shall be constructed of materials and components that will be permit extended, Comply.
Art. 5.3.3.4
-01.
HCIS SEC-06 All steel components and fasteners shall protected against corrosion by hot- dip Comply.
Art. 5.3.3.5 galvanizing I compliance with ASTM A123or acceptable equivalent corrosion protection
standard.
7
@
6.3.2.
@<
SECTION 4
29
Al Kuhaimi Metal Industries Ltd.
HCIS DELAY RATED FENCE SYSTEM
SAUDI CHEMICAL & ARAMCO PROJECTS
KINGDOM OF SAUDI ARABIA
HCIS COMPLIANT FENCES
HCIS COMPLIANT FENCES
A-1’s HCIS Compliant Offering
TPC
Coated
Galvanized
Coating
Steel Wire
The A-1 AKAT PRO 6 Delay Fence weld-mesh panels are produced by electrical resistance welded Galvanized
wires, with RHS Tubes and Flat Bars being welded for the delay fencing system.
www.a-1fenceproducts.com
fence and fence-ability
A-1 Fence Products Company Pvt. Ltd
2. Rectangular Hollow Section Posts
The posts are made from Hot Dip Galvanized Rectangular Hollow Sections.
2.2 Coating
2.2.1 Zinc
● Posts shall be Hot Dip Galvanized with minimum zinc coating of 70 Microns in accordance
with BS EN 1461:2009
3.3.2 Thermoplastic Coating
● Thickness: Coating has a thickness of 250 microns
● Colour: RAL 6005
www.a-1fenceproducts.com
fence and fence-ability
February 17, 2020
Subject: SwRI® Test Summary 18.25784.01.101, “ASTM F2781 Forced Entry Resistance Testing
for A-1 Fence Products, A1 AKAT Pro 6 Fence Design”, Rev. 1, February 17, 2020.
Table 1 – Forced Entry Resistance Ratings for A1 AKAT Pro 6 Fence Design
Threat Level Structured Test Total Delay Time Rating
Low Not Tested - NR
Medium Passed 24.9 minutes M24.9
Aggressive Passed 5.5 minutes A5.5
Disclaimer
Southwest Research Institute makes no claims, guarantees or certifications, implied or otherwise, based on
the results of this testing, which apply only to the specific specimen(s) tested. Furthermore, we request that
the reports detailing the specifics of the tests outlined above be used in their entirety.
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
Sequence of Operation
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
6
SEQUENCE OF OPERATION
STRUCTURAL PRODUCTS DIVISION
Al Kuhaimi provides complete documents that illustrate the sequence of
operations. This includes flowchart presentations, narrative descriptions.
Combined, these documents provide clients with a clear and concise
description of operational procedures.
START
SPECIAL DOORS ESTIMATION &
AND FRAMES QUOTATION
ENQUIRY
QUIRY with
Project D
Drawings TECHNICAL LETTER OF
INTENT / C
CONTRACT / SHOP W
WORK M
MFRG. PRO
PRODUCTION
Projects Specs. STUDY
PURCHASE SA
SALES ORDER DR
DRAWINGS O
ORDER DRA
DRAWINGS PR
PROCESS
Project BOQ
ORDER
SECURITY ESTIMATION &
HARDWARE QUOTATION SECURITY
HARDWA
HARDWARE
DWA RE
HARDWARE
DELIVERY
Y
DELIVERY
PROCESS
PACKING
ACKING
Appreciation Letters
Various
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal
APPRECIATION LETTERS
99
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
100
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
101
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
102
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
103
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
104
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
105
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
106
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
107
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
108
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
109
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
110
AL Kuhaimi Metal Industries Ltd.
APPRECIATION LETTERS
111
AL Kuhaimi Metal Industries Ltd.
Contact Details
All Branches
SNC Lavalin
Upgrade Crude Oil Delivery System – East West Pipeline Project
Crash Rated Fence KEM-FP1 & Anti-cut Anti-climb Fence
Technical Submittal